MAURY USCG vessel records
← All vessels

USNS 1ST LT HARRY L. MARTIN

USNS 1ST LT HARRY L. MARTIN is a 1979 freight ship. The Coast Guard has recorded 24 inspections since 2016, most recently in September 2022, along with 43 deficiencies — 29 with no resolution recorded —, 2 operational controls and 18 casualty investigations between 2005 and 2021.

Records from 2005 to 2022. Most recent: inspection, 16 September 2022.

Built
1979
Last inspected
16 September 2022
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Ro-Ro Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 16 September 2022
…with no type recorded6
…past their stated due date25
Operational controls None recorded without a removal date
Years with a record 7 calendar years (2016–2022)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

7720415
470075
Flag
UNITED STATES
Maury page id
psix-470075

Documentation record

Tonnage as PSIX records it38952 - Convention (Subpart B), Gross Ton
11708 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 11

Inspection history · 24

16 September 2022 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7596947
3 August 2021 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7283568
20 March 2020 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6929592
3 March 2020 Load Line/Change of Employment
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6919694
1 November 2019 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6847367
19 October 2018 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6564528
15 June 2018 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6445090
23 May 2018 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6422763
10 May 2018 Administrative Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6410785
4 May 2018 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6405739
3 May 2018 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6410031
25 April 2018 ACP Periodic Oversight · Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6398219
25 April 2018 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6407969
16 April 2018 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6393487
23 October 2017 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6293374
16 September 2017 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6267790
5 September 2017 ACP Annual Oversight · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6259542
3 August 2017 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6240163
1 February 2017 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6083589
18 January 2017 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6072440
17 January 2017 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6071932
22 September 2016 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6006487
21 July 2016 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5947738
18 July 2016 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5955978

Deficiency record · 43

Fire Fighting › Fire Main › Material
Issued 15 June 2018 No resolution recorded
Fire main piping in way of the port pipe tunnel found with pinhole leaks. Replace wasted sections of the fire main piping to the satisfaction of class. SOLAS 60 I/11
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 15 June 2018 — due date passed with no resolution recorded
Fire Fighting › Fire Main › Condition
Issued 4 May 2018 No resolution recorded
Fire main suction piping found with temporary repair. Replace the section of the fire main piping to the satisfaction of class. SOLAS 60 I/II.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2018 — due date passed with no resolution recorded
Construction/Loadline › Structures › Ventilators
Issued 26 April 2018 Resolved
The stbd bow bosn store natural ventilation ducting closure does not seal. Repair the closure so that it properly seals to the satisfaction of class. ICLL 66 Reg. 20
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2018
Resolution: Received documentation from the attending ABS Surveyor, [name withheld] attesting to the full rectification of the deficiency; all sat.
Construction/Loadline › Structures › Scuttle
Issued 26 April 2018 Resolved
The aft dog for the bosn store hatch located on the bow does not effectively latch down. Replace the aft dog to the satisfaction of class. ICLL 66 Reg. 16
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2018
Resolution: Received documentation from the attending ABS Surveyor, [name withheld] attesting to the full rectification of the deficiency; all sat.
Construction/Loadline › Structures › Ventilators
Issued 26 April 2018 Resolved
The portside bow thruster intake vent is wasted. Repair the intake vent to the satisfaction of class.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2018
Resolution: Received documentation from the attending ABS Surveyor, [name withheld] attesting to the full rectification of the deficiency; all sat.
Lifesaving › Lifeboat › Propulsion Engine
Issued 26 April 2018 No resolution recorded
Lifeboat number 1 will not start. Prove the proper operation of the number 1 lifeboat. The vessel is not authorized to carry more than 72 total persons until the number 1 lifeboat is fully functional to the satisfaction of class. SOLAS 60 III/4 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Operations/Management › Drills/Instruction › Abandon Ship
Issued 26 April 2018 No resolution recorded
Vessel was not fully crewed during inspection. Demonstrate crew's proficiency in firefighting, abandon ship drill, vessel control systems, and engineering upon activation to the satisfaction of [name withheld] 74 (2014) III/19
Action required: 17 - Rectify deficiencies prior to departure
Personnel › Certificates/Documents/Licenses › License, Master
Issued 26 April 2018 No resolution recorded
Provide crew's licenses and documetns, updated charts, and publications upon activation to the satisfaction of CGMI upon activation. 46 CFR 15, 33 CFR 164, SOLAS 74 (201) V
Action required: 17 - Rectify deficiencies prior to departure
Deck/Cargo › Holds/Tanks › Venitlation Fans
Issued 26 April 2018 No resolution recorded
Vent motor E-24 for cargo space not running, repair to the satisfaction of class. SOLAS 60 I/11
Action required: 701 - Prior to carriage of passengers/cargo
Deck/Cargo › Cargo Stowage › General
Issued 26 April 2018 No resolution recorded
Cargo gear sercuring fittings are corroded on the open upper deck aft of the flight deck, replace prior to carrying cargo on the open upper deck or provide amplifying documentation that the entire open upper deck cargo area has been decommissioned and that the Cargo Securing Manual has been updated accordingly to the satisfaction of the attending Marine Inspector. SOLAS 60 I/11
Action required: 705 - Other - as specified
Lifesaving › Launching Appliances › Winch
Issued 26 April 2018 Resolved
Port forward life boat davit winch limit switch wire brakets are disconnected and hanging unsupported. Repair to the satisfaction of the class. SOLAS 60 I/11
Action required: 705 - Other - as specified
Due 3 May 2018
Resolved 10 May 2018
Resolution: Received documentation from the attending ABS Surveyor, [name withheld] attesting to the full rectification of the deficiency; all sat.
Construction/Loadline › Structures › Air Pipe
Issued 26 April 2018 No resolution recorded
The following fuel tank vents were found to be wasted and must be repaired to the satisfaction of class, a. Vent near fire station 47 b. #3 DB F/O vent c. F/O tank 4C SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Pollution Prevention/Response › Prevention Equipment › Coamings
Issued 26 April 2018 No resolution recorded
Fuel tank vent 4C containment is wasted and has a hole. Repair the containment to the satisfaction of class. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Construction/Loadline › Structures › Air Pipe
Issued 26 April 2018 No resolution recorded
The 4 flight deck natural ventilation goose necks have corroded flanges and hardware, and 3 are missing gaskets. Repair to the satisfaction of class. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Electrical › Lighting (emergency) › Lighting Fixture
Issued 26 April 2018 No resolution recorded
The E-lighting fixture for 5-52-1 stairway is missings its cover and light bulb. Repair to the satisfaction of clas SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Electrical › Electrical Distribution System (service) › Junction Box
Issued 26 April 2018 No resolution recorded
Electrical junction box missing cover for supply fan S-71 near exit 1-104-2. Replace the cover to the satisfaction of class. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Construction/Loadline › Structures › Deck Plating
Issued 26 April 2018 No resolution recorded
Descale and provide UT shots for vent access 4-68-2, tank vent access 4-159-2, and aft mid mooring station. To the satisfaction of class. SOLAS 60 I/11
Action required: 705 - Other - as specified
Due 26 June 2018 — due date passed with no resolution recorded
Construction/Loadline › Structures › Ventilators
Issued 26 April 2018 No resolution recorded
Open for inspection the following spaces, fan enclosure 1-76-2, vent access 4-84-2, to the satisfaction of the attending Marine Inspector and Class. SOLAS 60 I/11
Action required: 705 - Other - as specified
Due 26 June 2018 — due date passed with no resolution recorded
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 26 April 2018 No resolution recorded
Deck toilet 4-76-2 has a hole in it and needs to be replaced. Replace the toilet to the satisfaction of class. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Construction/Loadline › Structures › Door
Issued 26 April 2018 No resolution recorded
Emergency egress door 1-104-2 needs to be adjusted, repair as necessary to the satisfaction of class. ICLL 66 Reg. 12.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 26 April 2018 No resolution recorded
Railings on the port aft flight deck level are damaged from shore tie cables, repair to original to the satisfaction of class. ICLL 66 Reg 25.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 26 April 2018 No resolution recorded
Update and submit for approval PSTP for incinerator. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 26 April 2018 Resolved
Replace J/W sensor for #3 SSDG to the satisfaction of class. SOLAS 60 I/11
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2018
Resolved 10 May 2018
Resolution: Received documentation from the attending ABS Surveyor, [name withheld] attesting to the full rectification of the deficiency; all sat.
Fire Fighting › Means of Escape › Doorways
Issued 26 April 2018 Resolved
The self-closing door that serves passageway 5-43-1 is missing its closing device. Replace the doors self-closing device to the satisfaction of class. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018
Resolved 10 May 2018
Resolution: Received documentation from the attending ABS Surveyor, [name withheld] attesting to the full rectification of the deficiency; all sat.
Fire Fighting › Fire Main › Condition
Issued 26 April 2018 No resolution recorded
Fire station 55's fire main piping is corroded. Descalge and conduct nondestructive testing to determine the remaining thickness of the corroded fire main piping or replace the corroded section of fire main piping to the satisfaction of class. SOLAS 60 II/55
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Lifesaving › Launching Appliances › Davit
Issued 26 April 2018 No resolution recorded
The port lifeboat davit control wires are pulling out of the control box and the port lifeboat contol mounting stand is wasted at its base. Repair the port lifeboat davit control box and mounting stand to the satisfaction of class. SOLAS 60 III/36
Action required: 705 - Other - as specified
Due 3 May 2018 — due date passed with no resolution recorded
Lifesaving › Launching Appliances › Davit
Issued 26 April 2018 No resolution recorded
All lifeboat davit wire runs are severely corroded. Replace the wire runs with in kind materials to the satisfaction of class. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Lifesaving › Launching Appliances › Winch Brake
Issued 26 April 2018 No resolution recorded
Several remote winch brake control sheave tabs for the port and stbd lifeboat davits are corroded. Descale and conduct nondestructive testing to determine the remaining thickness of the corroded sheave tabs or replace the sheave tabs to the satisfaction of class. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Construction/Loadline › Structures › Door
Issued 26 April 2018 No resolution recorded
The stern ramps stbd hydraulic cylinder's bushing sleeve is worn. Determine the maximum bushing sleeve clearance for the stern ramps stbd hydraulic cyclinder to the satisfaction of class. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Fire Fighting › Means of Escape › Doorways
Issued 26 April 2018 No resolution recorded
Emergency escape door 1-65-2 and the emergency escape door at frame 140 in hold 3 deck 1 are not sealing against the door seal gaskets. Repair the emergency escape doors so that the doors seal against the gaskets to the satisfaction of class. SOLAS 60 II/38 (d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Construction/Loadline › Structures › Door
Issued 26 April 2018 No resolution recorded
The port and stbd bunker station water tight door coamings are corroded. Descale and conduct nondestructive testing to determine the remaining thickness of the corroded water tight door coamings to the satisfaction of class. ICLL 66 Reg. 21
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2018 — due date passed with no resolution recorded
Construction/Loadline › Structures › Door
Issued 26 April 2018 No resolution recorded
Two stbd bunker station water tight door hydraulic cylindeer hoses are not serviceable. Replace the hoses to the satisfaction of class. SOLAS 60 I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Fire Fighting › Structural - A Class Divisions › Ro-ro Cargo Spaces
Issued 26 April 2018 No resolution recorded
The cable penetration seal in the muli cable transit (MCT) for frame 65 in hold 4 has been damaged by new cable being run through the penetration. Repair the MCT with USCG/SOLAS approved fire rated cable penetration sealant to the satisfaction of class. SOLAS 60 II/38
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 26 April 2018 Resolved
The bow thruster ventilation fire damper closure hardware is difficult to close. Repalce the existing hardware with larger wingnuts to the satisfaction of class. SOLAS 60 II/47
Action required: 705 - Other - as specified
Due 3 May 2018
Resolved 10 May 2018
Resolution: Received documentation from the attending ABS Surveyor, [name withheld] attesting to the full rectification of the deficiency; all sat.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 26 April 2018 No resolution recorded
The forward 6 man life raft launching instructions are damaged, there is no emergency lighting for launching instructions, and this no means of embarkation. Replace the damaged instructions and install emergency lighting for the launching instructions and install a means of embarkation to the satisfaction of class. SOLAS 74 III/9 and SOLAS 74 III/11.7
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018 — due date passed with no resolution recorded
Lifesaving › Lifeboat Equipment › Searchlight
Issued 26 April 2018 Resolved
Lifeboat number 2's searchlight handle is rotted and non-serviceable. Repair or replace the searchlight's rotted handle to the satisfaction of class. SOLAS 74 III/31.1.1.1 LSA code 4.4.8.29
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018
Resolved 10 May 2018
Resolution: Received documentation from the attending ABS Surveyor, [name withheld] attesting to the full rectification of the deficiency; all sat.
Electrical › Electric Generation Source (emergency) › Generator
Issued 26 April 2018 Resolved
The Emergency Diesel Generator did not start and connect to the emergency switchboard as required by the ABS ACP US Supplement. Demonstrate the proper operation of the Emergency Diesel Generator. ABS 4-8-2/3/11
Action required: 10 - Deficiency Rectified
Due 26 April 2018
Resolved 26 April 2018
Resolution: The attending USCG MI witnessed the proper operation of the emergency diesel generator.
Lifesaving › Lifeboat › Propulsion Engine
Issued 26 April 2018 Resolved
Lifeboat number 3's fuel filter bowl is leaking fuel excessively. Repair the fuel filter and prove the proper operation of the lifeboat. SOLAS 60 III/4 (a)
Action required: 10 - Deficiency Rectified
Due 26 April 2018
Resolved 26 April 2018
Resolution: The attending USCG Marine Inspector witnessed the proper operation of the #3 lifeboat's fuel system.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 26 April 2018 Resolved
The starboard life raft launching station and staboard lifeboat launching stations aft emergency lighting does not work. Repair the lighting to the satisfaction of class. SOLAS 74 III/9.2.2
Action required: 10 - Deficiency Rectified
Due 26 April 2018
Resolved 26 April 2018
Resolution: The attending USCG Marine Inspector witnessed the proper operation of the starboard life raft launching station and starboard lifeboat aft emergency lights.
Lifesaving › Lifebuoys › Serviceable
Issued 26 April 2018 Resolved
8 ring bouys have a hole in them and require repairs. SOLAS 60 I/11
Action required: 10 - Deficiency Rectified
Due 26 April 2018
Resolved 26 April 2018
Resolution: The attending USCG Marine Inspectors verifed that all 8 ring bouys had been repaired using the manufacturers approved repair procedures.
Engineering › Bilge Water Management System › Piping
Issued 16 April 2018 No resolution recorded
Bilge unable to take suction from engine room and three cargo holds due to holes in bilge piping. Repair bilge piping in kind and prove the proper operation of the vessel's bilge system to the satisfaction of the attending Classification Society prior to vessel's departure. SOLAS 60 I/11
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 16 May 2018 — due date passed with no resolution recorded
Engineering › Fuel Oil Service System › Pump
Issued 16 September 2017 Resolved
Vessel's main propulsion system is not fully operational. Fuel system is not providing sufficient pressure to the engine resulting in vessel's reduced engine HP output & subsequent reduced maneuverability. Vessel is required to have standby tugs of aggregate HP no less than 5000HP to meet vessel at pilot station and escort vessel to it's birth at CSX.
Action required: 705 - Other - as specified
Due 16 September 2017
Resolved 16 September 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 17 January 2017 Resolved
CO2 agent from low-pressure fire extinguishing system is leaking due to unknown causes. Identify cause(s) of the leak and make repairs under the direction of and to satisfaction of an attending surveyor from the American Bureau of Shipping. Ensure liquid CO2 level is in accordance with SOLAS requirements, to the satisfaction of the attending ABS surveyor. (SOLAS'60 II/65). PRIOR TO SAILING
Action required: 705 - Other - as specified
Due 17 January 2017
Resolved 6 September 2017
Resolution: LPCO2 system was certified by HILLER Systems and documentation was provided to attendning USCG Marine Inspectors and ABS Class Surveyor.

Casualty record · 18

14 September 2005Routine · role: Involved in a Marine Casualty · activity 2492253
27 March 2006Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2672896
3 July 2007Routine · role: Involved in a Marine Investigation (non-casualty) · activity 2990696
1 March 2009Routine · role: Involved in a Marine Casualty · activity 3542226
23 August 2009Routine · role: Involved in a Marine Casualty · activity 3631792
7 November 2010Routine · role: Subject to Marine Inspection · activity 4077240
3 January 2011Routine · role: Involved in a Marine Casualty · activity 3924472
8 February 2011Routine · role: Subject to Marine Inspection · 1 injured · activity 3965792
27 August 2011Routine · role: Involved in a Marine Casualty · 1 injured · activity 4158978
9 September 2011Routine · role: Involved in a Marine Casualty · 1 injured · activity 4158979
13 October 2011Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 4184467
28 December 2011Routine · role: Involved in a Marine Casualty · activity 4216921
26 September 2013Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 4724583
18 July 2016Routine · role: Involved in a Marine Casualty · activity 5955978
22 September 2016Routine · role: Involved in a Marine Casualty · activity 6006487
18 January 2017Routine · role: Involved in a Marine Casualty · activity 6072440
1 November 2019Routine · role: Involved in a Marine Casualty · activity 6847367
3 August 2021Routine · role: Involved in a Marine Casualty · activity 7283568
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.