MAURY USCG vessel records Sign in
← All vessels

HANNAH

HANNAH is a 1998 fishing tender. The Coast Guard has recorded 55 inspections since 1998, most recently in June 2026, along with 72 deficiencies — 4 with no resolution recorded —, 1 operational control and 5 casualty investigations between 2009 and 2024.

Records from 1998 to 2026. Most recent: inspection, 22 June 2026.

Built
1998
Last inspected
22 June 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

476017
Flag
UNITED STATES
368354830
Maury page id
psix-476017

Inspections, by type

…with no type recorded8
…past their stated due date4
Years with a record 24 calendar years (1998–2026)
The 55 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Fishing Vessel class in Maury's sources begin in 1972.

Documentation record

Registered dimensions (L × B × D)379.8 ft × 100.0 ft × 21.5 ft
Registered tonnagegross 14,128 / net 5,119
ITC dimensions (L × B × D)379.8 ft × 100.0 ft × 21.5 ft
ITC tonnagegross 14,128 / net 5,119
BuilderGULF COAST FABRICATION INC · PEARLINGTON, MS, UNITED STATES · built 1998
Hull materialSteel
PropulsionNone
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portDILLINGHAM, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 4 May 2026 · expires 31 May 2027
Service, as the file records itFishing Tender
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it14128 - Convention (Subpart B), Gross Ton
5119 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

KHAAMMSI 368354830 · active · compulsorily equipped · granted 28 February 2024, expires 28 February 2034
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 8

Inspection history · 55

22 June 2026 Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8407165
8 October 2025 Deficiency Check · Vessel Attendance · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8249681
29 July 2025 Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8200428
14 May 2025 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8138521
4 December 2024 Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8044303
10 September 2024 In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8001588
10 July 2024 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7975843
1 July 2024 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8139404
17 June 2024 Administrative Inspection · Initial Certification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7922821
24 May 2024 Equivalency · Administrative Inspection · Exemption
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7918688
14 July 2023 Construction Oversight
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7742713
5 May 2023 Appeal
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7681815
30 December 2022 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7614719
21 December 2022 Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7611889
22 September 2022 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7564207
21 December 2021 Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7371247
9 July 2021 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7250880
19 May 2021 Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7234668
4 May 2021 Annual Inspection · Damage Survey
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 7189013
8 April 2021 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7196735
11 October 2020 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7080130
1 September 2020 Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7047528
21 January 2020 MARPOL Annex VI Survey · MARPOL Annex I Examination · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6893401
27 February 2019 MARPOL Annex I Examination · MTSA/ISPS Verification · Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6633353
14 June 2018 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6444287
13 July 2017 Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6207948
6 April 2017 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6118944
7 July 2016 Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5932600
16 February 2016 Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5816738
16 September 2011 MTSA Verification · MARPOL Annex I Examination · Periodic Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4146986
9 September 2010 Annual Inspection · Administrative Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3873033
12 June 2008 Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3234664
24 April 2007 Internal Structural Exam · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2914613
29 September 2006 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2790099
29 September 2006 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2790100
27 July 2006 Annual Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2726782
28 March 2006 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2610978
28 March 2006 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2610990
9 March 2006 MTSA/ISPS Verification · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2599453
2 March 2006 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2594644
2 March 2006 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2594792
18 July 2005 Annual Inspection · Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2452437
12 August 2004 Administrative Inspection
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2163576
3 June 2004 Annual Inspection · Hull Examination · MARPOL Annex I Examination · Internal Structural Exam
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2087043
1 July 2003 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1832060
14 May 2002 Internal Structural Exam · Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1615665
20 September 2001 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 139863
12 June 2001 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1384794
6 October 2000 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1054967
24 July 2000 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1415410
16 July 1999 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1098579
23 April 1999 Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1445441
21 April 1999 Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1472626
11 March 1999 Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1420089
30 July 1998 MARPOL Annex I Examination · Construction Oversight · Hull Examination · Initial Certification
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1472425

Deficiency record · 72

03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 22 June 2026 Resolved
Each class 1 watertight door must have a quick action closing device operable from both sides of the door. The portside class 1 watertight door going into the 7P stairwell has damaged hardware rendering the door inoperable. Make repairs within 30 days and prior to any voyages beyond the boundary line.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2026
Resolved 15 July 2026
Resolution: Received photographs of repair.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 June 2026 No resolution recorded
All vessels shall have efficient guard rails or bulwarks on decks and bridges. The hand rails on the starboard and port stern corners are damaged and need repair. Additionally approximately 50 feet of hand rail on the fish loading deck is missing/damaged from the stbd bow aft. Repair and reinstall all handrail iaw 46 CFR 92.25-5.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2026 — due date passed with no resolution recorded
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 8 October 2025 Resolved
Each vessel must meet the requirements in subchapter S; Each vessel must have a stability letter...The stability letter sets forth the vessels conditions of operation. MI observed a substantial amount of water in the bilge in the vicinity of the space, 6c. Part 5 of HANNAH's stability letter states "The vessel’s bilges and voids shall be kept pumped to a minimum content at all times consistent with pollution prevention requirements." Pump bilge accumulation consistent with the requirements of the issued stability letter.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 26 May 2026
Resolved 26 May 2026
Resolution: O/o provided picture of dry and clean bilge as evidence of maintaining the requirements listed on stability letter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 October 2025 No resolution recorded
All auxiliary machinery must be designed, constructed, and installed in accordance with the provisions of this subchapter. MI observed the #6 and #9 generator sets were undergoing trouble shooting at the time of inspection. Perform functional tests with attending marine inspector during follow on inspection with SEC Western Alaska.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2026 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 October 2025 No resolution recorded
Construction of vessel shall be such as to minimize fire hazards. Two penetrations in the engine rm port side and one on the main deck centerline adjacent to the hotel need to be properly sealed. Verified during follow on inspection with SEC Western Alaska.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2026 — due date passed with no resolution recorded
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 8 October 2025 Resolved
Lifesaving appliances and arrangements are subject to tests and inspections described in paragraph (b) of this section during vessel boardings to ensure that the appliances and arrangements comply with applicable requirements, are in satisfactory condition, and remain fit for the service. Vessel unable to launch life saving appliances, nor conduct drills due to crew complement being onboarded upon arrival in Alaska. Tests/Drills to be completed upon arrival.
Action required: 703 - Prior to bunkering operations
Due 30 June 2026
Resolved 22 June 2026
Resolution: Drills witnessed.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 July 2025 No resolution recorded
There shall be at least two means of escape from areas where the crew may be quartered or normally employed. Design of deck coaming and scuppers permits emergency escape hatches from below deck spaces in the vicinity of the fish loading area (aft of midship; port and starboard) tow be submerged. Escape routes must be unobstructed. 46 CFR 92.10-5
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2025 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 July 2025 Resolved
A space used in the sorting or processing of fish in which water is used must be fitted with dewatering system capable of dewatering the space under normal conditions of list and trim at the same rate as water is introduced. The dewatering system must be interlocked with the pump(s) supplying water to the space, so that in the event of failure of the dewatering system, the water supply is inactivated. Main Deck Fish House above 6C and 7C dewatering pump was inoperable due to a ground fault. This failure resulted in the water introduced into the space to spill outside of the conveyor belt system, leading to water cascading down from upper decks within the fish house to the main deck where 6 inches of pooled water on main deck within the fish house. System not fitted with interlock to prevent water accumulation. 46 CFR 28.255 & 46 CFR 91.27–1(a)(4)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2025
Resolved 22 June 2026
Resolution: Main Deck Fish House is equipped with adequate scuppers to prevent water accumulation. See narrative for explanation.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 29 July 2025 Resolved
Each inflatable buoyant apparatus must meet the liferaft stowage requirements in § 199.130(c), being arranged for float-free launching. The arrangement must ensure that the inflatable buoyant apparatuses, when released and inflated, are not dragged under by the sinking vessel. A hydrostatic release unit used in a float-free arrangement must be approved under approval. Vessel's IBAs are lashed down and not float free. Hydrostatic release does not cut cradle strap. 46 CFR 199.640(j)
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 29 July 2025
Resolved 8 October 2025
Resolution: IBA was strapped for transit, straps not removed. Educated vessel crew to remove straps upon arrival to fishing grounds.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 29 July 2025 Resolved
Every crewmember must participate in at least one abandon-ship drill and one fire drill every month. Additionally, drills must be held before sailing when a vessel enters service for the first time, after modification of a major character, or when a new crew is engaged. Drills were conducted when crew arrived in early June, but monthly drills were not conducted until attending marine inspector came in late July. 46 CFR 199.180(c)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 29 July 2025
Resolution: Provided information to PIC in CFR about frequency of required drills.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 29 July 2025 Resolved
Every crewmember must be given instructions that include the operation and use of fire-extinguishing appliances. Cook on-board was unfamiliar with the location of designated fire-fighting appliances in the galley and the operation of the manual galley hood-extinguishing system installed. 46 CFR 199.180(g)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 29 July 2025
Resolution: Provided information to cook on location of fire appliances in his workplace. Communicated importance of on-board training requirements and safety orientation.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 May 2025 Resolved
Each lifejacket must be marked - In block capital letters with the name of the vessel. Lifejackets not currently marked. 46CFR199.70(b)(3)(i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2025
Resolved 29 July 2025
Resolution: Verified lifejacket markings during drills
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 14 May 2025 Resolved
Machinery compartments containing equipment for ammonia must be fitted with a sprinkler system providing an effective water spray and having a remote-control device located outside the compartment. Vessel has approved plans, but has nto finished installation of required equipment. 46CFR58.20-15(b)
Action required: 705 - Other - as specified
Due 30 September 2025
Resolved 11 May 2026
Resolution: Verified operation of installed sprinkler system IAW MSC approved plans.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 14 May 2025 Resolved
Lifesaving appliances and arrangements are subject to tests and inspections described in paragraph (b) of this section during vessel boardings to ensure that the appliances and arrangements comply with applicable requirements, are in satisfactory condition, and remain fit for the service. Vessel unable to launch life saving appliances, nor conduct drills due to crew complement being onboarded upon arrival in Alaska. Tests/Drills to be completed upon arrival. 46CFR199.45(c)(2) 705-Prior to operations
Action required: 705 - Other - as specified
Resolved 29 July 2025
Resolution: Conducted fire, abandon ship, and man-overboard drills.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 10 September 2024 Resolved
After any survey of the vessel made under 46 CFR 42, no change shall be made in the vessel's structure, equipment, arrangement, or scantlings without prior specific approval of the issuing authority. Vessel removed unauthorized portions of the bulkhead on the weather deck, affecting their watertight integrity after issuance of a temporary Load Line Certificate.
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 21 May 2025
Resolution: Resolved upon issuance of permanent loadline.
09 - Working and Living Conditions › 091 - Living Conditions › Drainage
Issued 10 September 2024 Resolved
The weather deck must have freeing ports, open rails, and scuppers, as necessary, to allow rapid clearing of water under all weather conditions. The vessel accumulates standing water in compartments on the weather deck and has no approved means of drainage.
Condition: Design Flaw
Action required: 30 - Ship detained
Resolved 21 May 2025
Resolution: Resolved upon issuance of permanent loadline
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 10 September 2024 Resolved
No person may operate an oceangoing ship of 400 gross tons and above but less than 10,000 gross tons unless it is fitted with approved 15 parts per million (ppm) oily-water separating equipment for the processing of oily mixtures from bilges, or fuel oil tank ballast and an oil residue (sludge) tank or tanks of adequate capacity to receive oil residue that cannot be dealt with otherwise. The vessel has no permanent means of retaining bilge water, there was excessive oily water in the bilge, the temporary tank on board was not utilized and is of insufficient capacity for vessel operations.
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 14 May 2025
Resolution: Verified installation and operation of installed system IAW approved plans.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 September 2024 Resolved
Electrical installations on vessels must ensure maintenance of services necessary for safety under normal conditions and the protection of crew, other persons, and the vessel from electrical hazards. The vessel has exposed electrical wiring from a previous fire in a compartment that regularly produces condensation and has standing water.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 September 2024
Resolved 28 April 2025
Resolution: Verified new wire runs installed, conduits removes and new wires installed on wire tray.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 10 September 2024 Resolved
Cylinders must always be secured and, when not in use, they must be stowed in a rack in an upright position. Oxygen and acetylene tanks were secured to a pillar with line, not in a rack, and in standing water.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 September 2024
Resolved 14 May 2025
Resolution: Verified permanantly installed cylinder racks on deck, welded, above areas of standing water.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 September 2024 Resolved
Non-conducting deck coverings, such as non-conducting mats or gratings, suitable for the specific switchboard voltage must be installed for personnel protection at the front and rear of the switchboard and must be sufficient width to suit the operating space. The switchboard in the emergency generator space did not have non-conducting deck coverings.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 September 2024
Resolved 18 December 2024
Resolution: Non conductive matting observed in emergency generator skid.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 September 2024 Resolved
Electric equipment must be arranged, as far as practicable, to prevent mechanical damage to the equipment from the accumulation of dust, oil vapors, steam, or dripping liquids. Condensation and/or a water leak from piping was observed actively dripping onto an energized charging appliance in the generator space.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 September 2024
Resolved 11 December 2024
Resolution: Drip shields were installed over battery chargers.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 10 September 2024 Resolved
Piping systems shall be installed so that under no condition will the operation of safety or relief valves be impaired. The vessel removed all of the motor operated valves from the ballast system due to them being inoperable.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2024
Resolved 28 April 2025
Resolution: Ballast plan approval recevied with new valves.
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 10 September 2024 Resolved
Vessels of 500 gross tons or more on an international voyage, must be provided with at least one international shore connection complying with ASTM F 1121. The international shore connection on deck was missing appropriate hardware components.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2024
Resolved 21 May 2025
Resolution: Shoreside connection installed IAW approved plans and oily water holding system.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 10 September 2024 Resolved
Alterations or repairs of machinery or piping systems shall be done under the cognizance of the Officer in Charge, Marine Inspection and in accordance with applicable regulations. The water recirculation piping system is actively leaking and has been temporarily repaired with electrical tape.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2024
Resolved 28 April 2025
Resolution: Previously cleared by SMI
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 19 August 2024 Resolved
The ring, lines and letter shall be painted in white or yellow on a dark ground or in black on a light ground. They shall also be permanently marked on the sides of the vessels to the satisfaction of the assigning authority. Load line is not permanently marked on vsl.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 September 2024
Resolved 21 May 2025
Resolution: Resolved upon issuance of permanent loadline.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 17 June 2024 Resolved
Each vessel subject to load line requirements shall carry on board a valid certificate attesting to compliance with such requirements. Vessel did not have approved final load line certificate and corresponding stability documentation on board. 46 CFR 42.09-1(b)
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 17 June 2024
Resolved 19 August 2024
Resolution: Vessel has received short term load line and final stability documentation for both load line and manned fish tender operations.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2024 Resolved
All applicable electrical plans under 46 CFR 110.25-1 must be submitted for Coast Guard review, addressing all outstanding comments when returned. Vessel has resubmitted revised plans as per MSC correspondence E2-2401833, but has not received approved plans. Once plans are approved, address outstanding comments to the satisfaction of OCMI (if applicable). 46 CFR 110.25-1
Condition: Invalid
Action required: 15 - Rectify deficiencies by next port
Due 17 June 2024
Resolved 24 June 2025
Resolution: Recevied electrical approval from MSC. MI previously walked electrical installation IAW submitted plans.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 17 June 2024 Resolved
Flexible non metallic hoses and fittings shall conform to SAE J1942 and J1475 specifications. Vessel generators (C18) are using non-compliant hoses for their generator cooling return systems. (02) generators are using 3" hoses that are marked w/J-1942, but not fully tested/approved to the standard. (06) generators are using non-J1942 hoses designed for turbocharger aftercooling. 46 CFR 56.60-25(b)
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Due 17 June 2024
Resolved 28 April 2025
Resolution: Verified correct hoses installed on 06 gensets.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2024 Resolved
Each cable installation must meet IEEE 45.8-2016 if not constructed to IEC 60092-353. Such installations should provide support by means of metallic banding to prevent undue sag, but in no case should exceed the distance between frames or 610 mm (24 in.), whichever is less. Locations throughout the vessel are not provided with metallic banding spaced 24 inches apart, which in some areas permitted sagging of cable installations. 46 CFR 111.60-5(a)
Condition: Placed in Improper Service
Action required: 15 - Rectify deficiencies by next port
Due 17 June 2024
Resolved 11 December 2024
Resolution: Steel bands are installed throughout vessel
08 - Alarms › N/A - No Subsystem › General alarm
Issued 17 June 2024 Resolved
All general alarm bells shall be identified by red lettering at least 1/2 inch high: “GENERAL ALARM—WHEN BELL RINGS GO TO YOUR STATION.” General alarm speakers are not identified with required signage. 46 CFR 97.37-7
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2024
Resolved 28 April 2025
Resolution: Verifeid posted signage in areas having general alarm bells.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 17 June 2024 Resolved
There shall be at least two means of escape from areas where the crew may be quartered or normally employed. 5P, 7P, and 7S vertical emergency escape ladders were unable to be opened because they were either blocked on deck (5P or 7P) or was stuck closed (7S). 46 CFR 92.10-5
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 17 June 2024
Resolved 17 June 2024
Resolution: Removed items blocking exit and opened all vertical exits.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 21 December 2021 Resolved
Coamings and hatchway covers to exposed hatchways on decks above the superstructure deck shall comply with the requirements of the assigning authority. 11 Hatch covers were found to be missing a stud or multiple studs, preventing it from being completely secured to the deck and watertight. Grind and repair as original.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 21 January 2022
Resolved 31 December 2021
Resolution: Repaired studs on manhole covers.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 4 May 2021 Resolved
Inset observed on Port side, just aft amidships, FR 36-37, approx 10'x8'x8".
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 July 2021
Resolved 9 July 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 4 May 2021 Resolved
Void space covers on deck missing studs and broken gaskets, impairing water tight envelope.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 15 July 2021
Resolved 9 July 2021
01 - Certificates & Documentation › 011 - Ships Certificates › International Oil Pollution Prevention (IOPP)
Issued 27 February 2019 Resolved
Vessel IOPP expired.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2019
Resolved 23 March 2019
Resolution: Issued IOPP.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 27 February 2019 Resolved
Original COD was not onboard the vessel.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2019
Resolved 22 April 2019
Resolution: Verified new COD.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 16 September 2011 Resolved
Crop/replace all applicable rails on focsle deck
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 October 2011
Resolved 11 October 2011
Resolution: Wasted rails were cut out and replaced.
Navigation › Collision/Grounding Avoidance › Day Shapes
Issued 16 September 2011 Resolved
Repair/replace permanent diamond day shape on fwd focsle deck
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 October 2011
Resolved 11 October 2011
Resolution: Day shape replaced and IAW Rules
Construction/Loadline › Structures › Door
Issued 16 September 2011 Resolved
Provide maintenance on both port/stbd main deck hatches.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 October 2011
Resolved 11 October 2011
Resolution: Hatches were greased and re-worked.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 16 September 2011 Resolved
Install document box and provide all required documents on board vessel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 October 2011
Resolved 11 October 2011
Resolution: New mobile document box has been placed in stbd side space
Deck/Cargo › Towing › Tackle
Issued 16 September 2011 Resolved
Provide maintenance/ re-work appropriate emergency towing installation
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 October 2011
Resolved 11 October 2011
Resolution: Tow system was re-set in proper location and anchor cable replaced.
Deck/Cargo › Cargo Stowage › General
Issued 30 April 2007 Resolved
Replace deck fittings and D- rings on main deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2007
Resolved 11 May 2007
Resolution: All deck fittings and D-rings were renewed or repaired as needed. All sat.
Construction/Loadline › Structures › Manhole
Issued 30 April 2007 Resolved
Perform maintenance on deck hatches and install new gaskets on all hatch covers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2007
Resolved 11 May 2007
Resolution: All hatch covers were cleaned, repainted and new gaskets installed.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 30 April 2007 Resolved
Repaint draft marks, vessels name and home port.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2007
Resolved 11 May 2007
Resolution: All draft marks, name and home port have been repainted.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 30 April 2007 Resolved
Make repairs to cracks in structural frames throughout vessel: 22 cracks in tank #2 center, 11 cracks in tank #2 port, 6 cracks in tank #3 center, 4 cracks in tank #2stbd, 4 cracks in tank #4 center, 7 cracks in tank #5, 1 crack in tank #6, 5 cracks in tank #7.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 May 2007
Resolved 14 May 2007
Resolution: Repairs were made to all cracked welds throughout tanks.
Fire Fighting › Means of Escape › Stairways
Issued 30 April 2007 Resolved
Remove unauthorized wood ladder on the stbd side and replace missing hand rails.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2007
Resolved 11 May 2007
Resolution: Wooded ladder removed and new hand rail installed. All sat.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 30 April 2007 Resolved
Replace missing hand rails as needed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2007
Resolved 11 May 2007
Resolution: Hand rails repaired satisfactory.
Navigation › Collision/Grounding Avoidance › Day Shapes
Issued 27 July 2006 Resolved
Renew / Repair support stanchion for towing dayshape and paint it black.
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 11 May 2007
Resolution: Broken day shape post was rewelded.
Construction/Loadline › Markings › Load Line Mark
Issued 27 July 2006 Resolved
Paint Loadline on both sides in contrasting color to the hull and paint draft marks.
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 30 April 2007
Resolution: Loadline repainted.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 27 July 2006 Resolved
Exercise dogs on port and stbd WTD's on main deck forward.
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 11 May 2007
Resolution: All watertight doors were repaired and in good working order.
Construction/Loadline › Structures › Door
Issued 18 July 2005 Resolved
Starboard weather tight door is wasted and needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2005
Resolved 10 March 2006
Resolution: Visited vessel cleared outstanding def
Pollution Prevention/Response › Response Equipment › Non-sparking Portable Pump/Hoses
Issued 18 July 2005 Resolved
Provide a complete oil spill kit as per the approve SOPEP prior to operating.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 15 August 2005
Resolution: A complete spill kit was provided.
Construction/Loadline › Hull › Weld
Issued 3 June 2004 Resolved
PORT SIDE #2 VOID, FR. 5, 7 AND 8 GRIND AND WELD AS MARKED TRANSVERSE AND LONG CONNECTIONS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Construction/Loadline › Hull › Transverse Frame
Issued 3 June 2004 Resolved
PORT SIDE, VOID #7, FR. 44, GRIND AND WELD VERTICAL FRAME AT CONNECTION AS MARKED.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 June 2004 Resolved
VOID #7 C, IN WAY OF STBD KEELSON IN WAY OF FR. 40, 41, AND 43, GRIND AND WELD STANTION CONNECTION AT KEELSON AS MARKED.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Construction/Loadline › Hull › Weld
Issued 3 June 2004 Resolved
#8 VOID P, FR. 52, GRIND AND WELD VERTICAL FRAMES IN WAY OF CONNECTION TO TRANSVERSE AS MARKED.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Construction/Loadline › Hull › Girder
Issued 3 June 2004 Resolved
VOID #6 C, FR. 34, 36, GRIND AND WELD FRACTURES AS MARKED. FR. 32, INSERT VERTICAL FRAME AS MARKED.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 June 2004 Resolved
MAKE AVAILABLE FOR INTERNAL EXAMINATION VOIDS #1S AND 8 S.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 June 2004 Resolved
IN VOID #2 C: A) FR. 7, FRACTURE IN WAY OF BOTTM LONG#13. B) FR. 8, CROP AND RENEW TRANSVERSE GIRDER IN WAY OF WEB FRAME AND PORT BHD CONNECTION. C) FR. 9, IN WAY OF LONG #12 P, CROP AND RENEW BOTTOM BRACKET TO ORIGINAL. D) FR. 10, IN WAY OF LONG #12 P, GOUGE AND REWELD BOTTOM ANGLE BRACKET.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Construction/Loadline › Hull › Transverse Frame
Issued 3 June 2004 Resolved
VOID #3 S, A) FR.14, GOUGE AND REWELD THE CONNECTION IN WAY OF THE BULKHEAD CONNECTION. B) FR. 16, GOUGE AND REWELD THE DEEP WEB IN WAY OF THE UNDERDECK DIAGONAL. LEGACY COMPONENT DESC: Transverse Frame
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Construction/Loadline › Hull › Keel
Issued 3 June 2004 Resolved
IN VOID #4 C: A) CVK IN WAY OF THE FWD VERTICAL FLANGED ANGLE, GOUGE AND WELD THE WAY OF THE SNIPE. B) IN WAY OF FR. 19, 20, 21, 22, 23, AND THE BOTTOM LONGS #13 STBD, GOUGE AND WELD FRACTURES IN WAY OF THE DIAGONALS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Construction/Loadline › Hull
Issued 14 May 2002 Resolved
#2 CTR LINE void, remove all improper repairs, make permanent repairs to all fractures in frames to upright supports IAW with NVIC and ABS Class rules. LEGACY COMPONENT DESC: Weld
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 15 May 2002
Resolution: Reviewed all welder certs, found correct. All rework and initial repais up to standards.
Construction/Loadline › Hull
Issued 14 May 2002 Resolved
#2 PORT void, make permanent repairs to all fractures at upright to to long frames. LEGACY COMPONENT DESC: Weld
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 15 May 2002
Construction/Loadline › Hull
Issued 14 May 2002 Resolved
#3,4,6 and 7 CENTER LINE voids, make permanent repairs to CL CVK frame at forward bulkheads. LEGACY COMPONENT DESC: Weld
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 15 May 2002
Construction/Loadline › Hull
Issued 14 May 2002 Resolved
#7 CENTER LINE void, forward bulkhead vert frame #2 from CL to port, make permanent repairs to fracture. LEGACY COMPONENT DESC: Weld
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 15 May 2002
Deck/Cargo
Issued 24 July 2000 Resolved
PROVIDE FOUR (4) OPERABLE 2 FORWARD AND 2 AFT DECK WINCHES PRIOR TO RESUMING OPERATION.
Condition: Unknown
Due 24 July 2000
Resolved 24 July 2000
Navigation
Issued 24 July 2000 Resolved
PROVIDE OPERABLE FRONT (RED AND GREEN) AND AFT (WHITE) NAVIGATION LIGHTS PRIOR TO RESUMING OPERATION.
Condition: Unknown
Due 24 July 2000
Resolved 24 July 2000
Construction/Loadline
Issued 11 March 1999 Resolved
At frames 37 & 39 stbd sideshell, crop and insert w/ scarf, 10'x3' section at watertight bulkhead(fr 39) & 10'x3' vertical stiffener at sideshell (fr 37). Mark in contrasting color to hull, in way of #6 stbd void and w/t bulkhead between #3 & #4 port voids: "NO TUGS IN THIS AREA"
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Construction/Loadline
Issued 11 March 1999 Resolved
In #8 stbd void, gouge and reweld fracture at second long. in way of frame 47 and tripped bracket in way of forward w/t bulkhead at floor and sideshell.
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Construction/Loadline
Issued 11 March 1999 Resolved
In no. 7 stbd void, gouge and reweld fractures in 2nd and 3rd long. aft of frame 45.
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Construction/Loadline
Issued 11 March 1999 Resolved
At forward w/t bulkhead in #4 port void, replace top 4 tripped brackets & crop and renew associated longitudinals (1-4).
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Construction/Loadline
Issued 11 March 1999 Resolved
In #6 and #7 stbd voids, from frames 32 to 44, crop and renew damage associated with sideshell insets to include fractured welds, vertical webs and side longs.
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999

Casualty record · 5

26 October 2009Routine · role: Involved in a Marine Casualty · at MLK JR. BRIDGE · activity 3630988
11 October 2020Routine · role: Involved in a Marine Investigation (non-casualty) · activity 7080130
8 April 2021Routine · role: Involved in a Marine Casualty · activity 7196735
1 July 2024Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 8139404
10 July 2024Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 7975843
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

ATLANTA BRIDGE (2009–2021). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.