Inspection history · 87
6 January 2026
MARPOL Annex VI Survey · Periodic Inspection · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8290849
25 April 2025
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8119920
16 January 2025
MARPOL Annex I Examination · Annual Inspection · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8064764
9 January 2024
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7846551
18 October 2022
MARPOL Annex VI Survey · COI Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7576592
21 July 2022
Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7512793
27 January 2022
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7386615
13 December 2021
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7367364
26 October 2021
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7340293
21 September 2021
Deficiency Check · MTSA Verification · MARPOL Annex VI Survey · MARPOL Annex I Examination · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7317611
29 June 2020
Periodic Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6990997
7 May 2020
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6949523
12 September 2019
MARPOL Annex I Examination · Annual Inspection · MTSA Verification · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6810453
22 May 2018
MTSA Verification · Annual Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6420303
14 June 2017
Deficiency Check · MTSA Verification · COI Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6175843
2 March 2017
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6097119
31 January 2017
MARPOL Annex I Examination · Annual Inspection · MTSA/ISPS Verification · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6088382
4 April 2016
Deficiency Check · Periodic Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5846553
22 February 2016
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5819914
13 August 2015
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5214473
20 January 2015
MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5055459
18 February 2014
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4801424
28 October 2013
MARPOL Annex I Examination · MARPOL Annex VI Survey · MARPOL Annex V Examination · Administrative Inspection · MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4739940
28 September 2012
Drydock Exam · Internal Structural Exam · COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4465900
5 September 2012
Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4432700
23 March 2012
MTSA Verification · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4268787
15 November 2011
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4189741
1 December 2010
MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3902252
16 June 2010
Drydock Exam · Administrative Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3768301
3 March 2010
MARPOL Annex I Examination · MARPOL Annex VI Survey · Annual Inspection · MTSA Verification · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3689271
4 June 2009
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3494898
8 September 2008
COI Inspection · MARPOL Annex I Examination · MARPOL Annex V Examination · MTSA Verification · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3320471
24 September 2007
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3064684
27 July 2006
COI Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2726206
16 March 2006
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2603427
12 January 2006
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2565605
18 November 2005
Deficiency Check · MARPOL Annex I Examination
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2537145
28 October 2005
Deficiency Check · Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 2523478
6 July 2005
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2416595
18 August 2004
MTSA Verification · MARPOL Annex V Examination · Deficiency Check · MARPOL Annex I Examination · Periodic Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2169448
29 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1977762
25 July 2003
MARPOL Annex V Examination · Annual Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1856594
7 January 2003
MARPOL Annex V Examination · Annual Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1726809
31 May 2002
Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1623995
24 April 2002
Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1608917
20 September 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 139863
31 July 2001
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1436606
2 May 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 20692
15 December 2000
Deficiency Check · MARPOL Annex I Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1408648
11 August 2000
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1460434
7 July 2000
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1433753
24 May 2000
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 819129
15 February 2000
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1046595
4 February 2000
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1460374
4 January 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 813530
4 September 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1117475
15 December 1998
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 807485
6 November 1998
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 804134
19 December 1997
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1119480
17 December 1997
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1364506
22 September 1997
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 777101
6 August 1997
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1119402
16 May 1997
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1097789
2 January 1997
Damage Survey
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1096975
19 December 1996
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1100547
19 December 1996
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1466443
10 June 1996
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1185599
30 August 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 870481
1 August 1994
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1180855
17 September 1993
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1161264
15 July 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 171032
3 August 1992
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1265203
6 May 1992
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 950607
17 June 1991
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1343425
22 June 1990
Re-Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 908070
27 July 1989
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1203677
9 September 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1003987
20 August 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1338581
16 July 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1326362
26 June 1987
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1009587
27 May 1987
COI Inspection · Damage Survey · Hull Examination
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1029827
10 February 1987
Permit to Proceed
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1011643
28 January 1987
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1006530
3 December 1986
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1330170
23 July 1986
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1300853
5 February 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1304665
24 April 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 980952
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 April 2025
Resolved
In 4S void: Crop/Blank flange broken discharge pipe to side shell.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 30 April 2025
Resolution: Received photo evidence of blanked overboard pipe.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 January 2024
Resolved
Vertical communication shall be provided between the various weather decks by means of permanent inclined ladders. Inspector observed no means of vertical communication between the weather deck and the crew accommodation egress area. Submit repair plan proposal to OCMI to install ladder from crew accommodation egress area to weather deck.
46 CFR 92.10-45 (a) 705c
Action required: 705 - Other - as specified
Resolved 17 January 2025
Resolution: Observed clear access to egress area in crew accommodation space during exam. Deficiency cleared.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 January 2024
Resolved
All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended and so that they can be kept in a clean, workable, and sanitary condition. Inspector observed overhead paneling in crew accommodation space arranged in such a way that it obstructs access to the egress hatch. Remove all egress route obstructions to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Resolved 17 January 2025
Resolution: Overhead paneling in crew accomodation space was no longer obstructing access to the egress hatch. Observed correct arrangement during annual exam. Deficiency cleared.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 January 2024
Resolved
Each cargo vessel must carry the number of lifebuoys prescribed in table 199.271 of this section. Inspector observed 02 lifebuoys installed on vessel. Outfit vessel with lifebuoy requirements prescribed in 46 CFR 199.271 in the presence of attending marine inspector or provide approved equilavency letter from CG-ENG.
46 CFR 199.271 (50c)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 January 2025
Resolution: Observed correct number of life buoys on board (8) during annual exam in good condition. Deficiency cleared.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 9 January 2024
Resolved
All vessels shall have efficient guard rails or bulwarks on decks and bridges. The height of rails or bulwarks shall be at least 39 1/2 inches from the deck except that where this height would interfere with the normal operation of the vessel, a lesser height may be approved by the Commandant. Inspector witnessed sections of missing handrails throughout vessel. Submit repair plan proposal to OCMI for installation of efficient guard rails.
46 CFR 92.25-5(a)
(50c)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 January 2025
Resolution: Observed efficienct guard rails put in place during annual exam. Deficiency cleared.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 9 January 2024
Resolved
Portable rails may be used when operating conditions warrant their use. OCMI approval letter for detachable handrails dated 21MAY1998, states vessel may remove handrails while engaged in operations. Inspector witnessed missing handrails in the vicinity of the crane during inspection. Provide detachable handrails while vessel is not engaged in operations.
46 CFR 42.15-75(b)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 March 2024
Resolution: Accepted video of installed chains for railing.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 9 January 2024
Resolved
Operational readiness. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Inspector witnessed incorrect configuration of liferaft hydrostatic release unit. Vessel corrected on the spot.
46 CFR 199.190(a)
Action required: 10 - Deficiency Rectified
Resolved 9 January 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 October 2022
Resolved
No repairs or alterations affecting the safety of the vessel shall be made without the knowledge of the OCMI. Drawings of alterations shall be approved before work is started unless deemed unnecessary by the OCMI. The OCMI must be notified before alterations or modifications that deviate from approved plans. In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work except as modified by 91.45-1. The general scope of the plans shall be as noted in 91.55-5.
Plans must be submitted for all modifications associated with the LED installation. Plans must be submitted for the additional Caterpillar genset. A return to original
plans would be considered to be compliant with this
requirement.
46 CFR 91.45-1(a),(b)
46 CFR 110.30-7(a)
46 CFR 91.55-10
46 CFR 96.05-1
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 October 2022
Resolution: Operator removed the genset from the deck and provided plans for the LED light arrangements.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 18 October 2022
Resolved
The design and arrangements of electric apparatus must afford accessibility to each part as needed to facilitate proper inspection, adjustment, maintenance, or replacement. Locker in machinery space near starboard exit must be moved away from motor controller. Washer and dryer must be moved to a suitable location.
46 CFR 91.25-30, 111.01-7(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 November 2022
Resolved 25 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 October 2022
Resolved
Each outlet or junction box must have a cover unless a fixture canopy, switch cover, receptacle cover, or other
cover is used. 115V outlet in machinery space has a
broken cover.
46 CFR 91.25-30, 111.81-1(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 November 2022
Resolved 25 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 October 2022
Resolved
All relief valves for use on pressure vessels shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the MAWP of the pressure vessel. Relief valve on center air receiver in machinery space was unable to relieve.
46 CFR 91.25-35, 54.15-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 November 2022
Resolved 25 October 2022
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 July 2022
Resolved
1S void: C/R side shell inset directly below "APEAKE."
Action required: 705 - Other - as specified
Resolved 13 September 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 December 2021
Resolved
THE FUEL SUPPLY PIPING TO ENGINES ON DIESEL FUEL SYSTEMS SHALL BE OF SEAMLESS STEEL, ANNEALED SEAMLESS COPPER OR BRASS PIPE OR TUBING, OR OF NICKEL COPPER OR COPPER NICKEL ALLOY. CRANE PRIME MOVER HAS TYPE-L HOUSEHOLD COPPER PIPE INTEGRATED INTO THE FUEL OIL SUPPLY SYSTEM. VSL MUST PROVIDE APPROVED PIPING FOR THE FUEL OIL SUPPLY SYSTEM FOR THE CRANE PRIME MOVER PRIOR TO CRANE OPERATIONS. 46 CFR 56.50-75
Action required: 705 - Other - as specified
Resolved 27 January 2022
09 - Working and Living Conditions › 091 - Living Conditions › Berth dimensions, etc.
Issued 5 October 2021
Resolved
THE VESSEL HAS INSTALLED A INADEQUATE PORTBALE BERTING UNIT. NO CREW OR INDUSTRIAL WORKERS ARE AUTHORIZED TO BE ASSIGNED TO OR USE THE UNIT FOR BERTHING. THE INSTALLED PORTABLE BERTHING UNIT ONBOARD MUST BE REMOVED, PRIOR TO DEPARTURE OR NOT LATER THAN 05OCT21, WHICHEVER COMES FIRST.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 5 October 2021
Resolved 8 October 2021
Resolution: Containers (office and berthing) have been removed, as shown in pic submitted by vessel rep.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 27 September 2021
Resolved
GEARS, COUPLINGS, FLYWHEELS & ALL MACHINERY CAPABLE OF INJURING PERSONNEL SHALL BE PROVIDED WITH ADEQUATE COVERS OR GUARDS. ROTATING BELTS ON ENGINE TO POWER CRANE MUST HAVE COVERS/GUARDS INSTALLED.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 14 October 2021
Resolution: Protective guard installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 September 2021
Resolved
THE FUEL SUPPLY PIPING TO ENGINES ON DIESEL FUEL SYSTEMS SHALL BE OF SEAMLESS STEEL, ANNEALED SEAMLESS COPPER OR BRASS PIPE OR TUBING, OR OF NICKEL COPPER OR COPPER NICKEL ALLOY. APPROVED PIPING MUST BE INSTALLED FOR THE FUEL SUPPLY PIPING FOR THE ENGINE SERVING THE CRANE.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 27 January 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 September 2021
Resolved
NON-METALIC FLEXIBLE HOSES MUST BE IN ACCORDANCE WITH SAE J1942. THE NON-METALIC HOSE CONNECTED FROM THE SHIP TO THE ENGINE FORWARD (SERVING THE CRANE SYSTEM) MUST BE APPROPRIATELY REPLACED.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 4 October 2021
Resolution: Wires/cables properly secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 September 2021
Resolved
WIRES & CABLES MUST BE INSTALLED WITH METAL SUPPORTS SPACED NOT MORE THAN 18 INCHES APART, IN A MANNER TO AVOID CHAFING & OTHER DAMAGE; IAW IEEE 45-2002 25.5. WIRES & CABLES FOR CAMERAS IN MAIN ENGINE SPACE & WIRES IN WAY OF MSD MUST BE PROPERLY SECURED.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 4 October 2021
Resolution: wires have been secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 September 2021
Resolved
NON-CONDUCTIVE MATS OR GRATING SUITABLE FOR THE SPECIFIC SWITCHBOARD VOLTAGE MUST BE IN STALLED FOR PERSONNEL PROTECTION AT THE FRONT AND REAR OF THE SWITCHBOARD AND MUST EXTEND THE ENTIRE LENGTH OF, AND BE OF SUFFICIENT WIDTH TO SUIT THE OPERATING SPACE. A ASMT TYPE II NON-CONDUCTIVE MAT OR OTHER APPROPRIATE MAT OR GRATING MUST BE INSTALLED IN FRONT OF THE SWITCHBOARD IN THE MAIN ENGINE SPACE.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 14 October 2021
Resolution: ASMT Type II mat installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 September 2021
Resolved
EACH SWITCHBOARD MUST MEET THE LOCATION AND INSTALLATION REQUIREMENTS IN SECTION 8.2 OF IEEE 45-2202. THE SPACE AROUND THE SWITCHBOARDS AND ELECTRICAL PANEL MUST BE KEPT CLEAR AND ACCESSIBLE. REMOVE THE STRETCHER ABOVE SWITCHBOARD IN MAIN ENEGINE SPACE. THE NEW LOCATION FOR THE STRETCHER MUST BE PROPERLY MARKED.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 4 October 2021
Resolution: stokes litter removed from top of switchboard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 September 2021
Resolved
EACH OUTLET OR JUNCTION BOX MUST BE SECURELY ATTACHED TO ITS MOUNTING AND BE AFFIXED SO AS TO MAINTAIN ITS DESIGNATED DEGREE IF PROTECTION.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 4 October 2021
Resolution: Junction box properly covered.
09 - Working and Living Conditions › 092 - Working Conditions › Loading and unloading equipment
Issued 27 September 2021
Resolved
THE MASTER OR PERSON INSURE THAT TABLES INDICATING THE MAXIMUM SAFE WORKING LOADS FOR THE VARIOUS ANLES OF BOOM ARE CONSPICUOUSLY POSTED NEAR THE CONTROLS AND ARE VISIBLE TO THE OPERATOR WHEN WORKING THE CRANE. PLACE LOADING CHARTS IN THE CRANE'S OPERATING STATION / SHACK.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 4 October 2021
Resolution: Loading chart have been installed in crane's blue (operating) shack.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 September 2021
Resolved
IF TWIST-ON TYPE CONNECTORS ARE USED, THE CONNECTIONS MUS EB MADE WITHIN AN ENCLOSURE & THE INSULATED CAP OF THE CONNECTOR MUST BE SECURED TO PREVENT LOOSENING DEU TO VIBRATION. HEATER WIRE TO THE MAIN OFFICE SPACE NEEDS TO BE SECURE/DISCONNECTED.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 4 October 2021
Resolution: Proper electrical outlet installed.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 21 September 2021
Resolved
Vessel's Epirb battery expired in June 2021.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 21 September 2021
Resolved 27 September 2021
Resolution: New EPIRB installed onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 September 2021
Resolved
Vessel could not conduct shutdowns/overspeeds on gen.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 September 2021
Resolved 27 September 2021
Resolution: Attending inspectors witnessed shutdowns/overspeed on gen.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 September 2021
Resolved
Port and Stbd Life ring Buoys need to be replaced and properly installed including proper installation of detachable lights.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 September 2021
Resolved 27 September 2021
Resolution: New ring buoys have been installed, with the lines properly attached. The SOLAS smoke has been removed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 21 September 2021
Resolved
Complete Annual Inspection.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 September 2021
Resolved 27 September 2021
Resolution: MSU Houma completed an annual inspection. 11 additional defs were identified.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 21 September 2021
Resolved
SOPEP Equipment not on board.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 September 2021
Resolved 27 September 2021
Resolution: SOPEP container placed onboard.
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 21 September 2021
Resolved
Not being implemented.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 September 2021
Resolved 27 September 2021
Resolution: SOPEP implemented with new container onboard and updated procedures to include designation of duties to personnel regularly assigned to barge.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 September 2021
Resolved
EACH FIXTURE GLOBE, LENS, OR DIFUSER MUST HAVE A HIGH STRENGTH GUARD OR BE MADE OF HIGH STRENGTH MATERIAL. OVERHEAD LIGHT FIXTURES IN MAIN ENGINE SPACE MUST HAVE APPROPRIATE PROTECTIVE EQUIPMENT OT PREVENT DAMAGES TO THE TUBE/LIGHT COMPONENT.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 4 October 2021
Resolution: Protective tubes installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 September 2021
Resolved
EACH FLEXIBLE CORD AND CABLE MUST EB CONNECTED TO A DEVICE OR FITTING BY A KNOT, TAPE, OR SPECIAL FITTING SO THAT TENSION IS NOT TRANSMITTED TO THE JOINTS OR TERMINAL SCREWS. SECURE THE OPEN CONNECTION FOR THE ELECTRIC DIESEL FUEL TRANSFER PUMP OR PROVIDE PERMANENT WIRING TO THE DIESEL FUEL TRANSFER PUMP.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2021
Resolved 4 October 2021
Resolution: Junction box properly secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 June 2020
Resolved
Barge must perform the Generator overspeed test to the satisfaction of a Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2020
Resolved 9 July 2020
Resolution: overspeed test-sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 May 2020
Resolved
Repair missing top ladder rung, in No. 5 Center Void.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 4 June 2020
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 September 2019
Resolved
Found ground in the 120V electrical panel in the machinery space. Fix within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 November 2019
Resolution: Deficiency rectified.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 14 June 2017
Resolved
Electrical installations on vessels must ensure protection of crew from electrical hazards. Require a breaker or blank in panel box to prevent electrical hazard on two boxes, one directly behind the switchboard and one to the left of the switchboard. 46 CFR 111.01-1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2017
Resolved 13 July 2017
Resolution: Donjon submitted photo documenation of installed blanks
Engineering › Pressure Vessel › Relief Valve
Issued 14 June 2017
Resolved
All relief valves for use on pressure vessels shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure no exceeding MAWP of the pressure vessel. Relief valves were not releasing at the set pressure. 46 CFR 54.15-10 (a)
Action required: 705 - Other - as specified
Due 29 June 2017
Resolved 13 July 2017
Resolution: Vessel replaced w/ new valves. Donjon confirmed that they bench tested and also sent invoice from manufacturer.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 4 April 2016
Resolved
The carbon dioxide extinguisher for the paint locker is not permanently mounted in an approved bracket.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 7 April 2016
Resolution: Extinguisher has been mounted in an approved bracket per the manufacturer's guidelines.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 4 April 2016
Resolved
Proof of vessel or employee enrollment in drug testing program was not available, including: pre-employment testing records & list of employees enrolled.
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 8 April 2016
Resolution: Owner emailed all required proof of enrollment items, including pre-employment records and a list of the employees enrolled.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 4 April 2016
Resolved
No phone number of informational display is currently posted for the EAP.
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 7 April 2016
Resolution: The display has been posted.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 4 April 2016
Resolved
The life jackets did not have lights attached.
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 7 April 2016
Resolution: Lights were attached to all life jackets.
Lifesaving › Immersion Suits › Retroreflective Material
Issued 4 April 2016
Resolved
Retro-reflective tape on the immersion suits was worn out and requires replacement.
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 7 April 2016
Resolution: New retro-reflective tape was placed on all immersion suits.
Fire Fighting › Combustible Materials › Linings
Issued 20 January 2015
Resolved
Paint lockers shall be constructed of steel or shall be wholly lined with metal. The paint locker on-board has several wasted holes. Repair or replace paint locker.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 February 2015
Resolved 20 February 2015
Resolution: Vessel rep submitted photo documentation of the repair to the paint locker.
Lifesaving › Inflatable Liferafts › Float Free
Issued 28 October 2013
Resolved
Vessel must demonstrate proper installation of inflatable life raft.
Due 11 November 2013
Resolved 12 November 2013
Resolution: Verified the proper installation of the life raft.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 28 October 2013
Resolved
Vessel must replace aft nav light and remove associated unapproved wiring.
Due 11 November 2013
Resolved 2 December 2013
Resolution: Vessel replaced aft navigation light with a Solar Powered portable light. Operation test satisfactory.
Pollution Prevention/Response › Response Equipment › Containers
Issued 28 October 2013
Resolved
Vessek must install drip sampler for taking bunker delivery samples. Extended due date from 16DEC to 27DEC.
Action required: 705 - Other - as specified
Due 27 December 2013
Resolved 18 February 2014
Resolution: Vessel provided photo documentation of drip sampler installed onboard.
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 28 October 2013
Resolved
Vessel must install permanent wiring on discharge pump for deck day tank.
Due 16 December 2013
Resolved 10 December 2013
Resolution: After researching information for the fuel pump, it is shown that it meets the marine industrial requirements for pumping fuel. Temporary extension cord was removed and secured.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 28 October 2013
Resolved
Vessel is prohibited from using 03 air receiver in generator room due to exceeding the requirements of of hydrostatically testing the pressure vessels twice in 5 years. Pressure vessels must be de-pressurized and removed from service until tested @ 125% MAWP.
Due 4 December 2013
Resolved 12 November 2013
Resolution: Witnessed the hydrostatic testing of three air receivers at a test pressure of 263. test results satisfactory.
Construction/Loadline › Hull › Bracket
Issued 17 October 2012
Resolved
Tankl 6 Center: Aft bay, corner of stern bulkhead on stbd side, tripping brackets #4 and #7 up from bottom. Excessively wasted, renew as original. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 24 January 2013
Resolution: Attended vessel, examined satisfactory repairs.
Construction/Loadline › Hull › Bracket
Issued 17 October 2012
Resolved
Tank 6 Center: Aft bay, corner of stern bulkhead on port side, tripping brackets # 4 and #5 up from bottom. Excessively wasted; renew as original. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 24 January 2013
Resolution: Attended vsl, examined satisfactory repairs.
Construction/Loadline › Hull › Stiffener
Issued 17 October 2012
Resolved
Tank 6 Center: Fwd bay, 3rd longitudinal from port, near aft bulkhead. Flange on longitudinal stiffener wasted approx. 1.5". Crop and renew as original. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 24 January 2013
Resolution: Attended vessel, examined satisfactory repairs.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 17 October 2012
Resolved
Tank 6 Center: Bulkhead between FWD and middle bays, port side; approx. 48"x14" insert only welded on aft side. Weld fwd side of the insert. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 27 March 2013
Resolution: Received ABS class survey attesting to satisfactory repairs.
Construction/Loadline › Hull › Weld
Issued 17 October 2012
Resolved
Tank 1 STBD Cracked weld on top of diagonal, IWO middle transverse of tank, one stanchion from center bulkhead. Reweld. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 24 January 2013
Resolution: Attended vessel, examined satisfactory repairs.
Construction/Loadline › Hull › Girder
Issued 17 October 2012
Resolved
1 STBD Wasted sections of diagonal and transverse beams, middle transverse of tank, between 1 and 2 stanchions from center bulkhead. Crop and renew as original. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 27 March 2013
Resolution: Received ABS class report attesting to satisfactory repairs.
Construction/Loadline › Hull › Weld
Issued 17 October 2012
Resolved
1 STBD Centerline longitudinal bottom plating seam needs pick up weld. Longitudinal location: between 5 and 6 keel blocks from the turn of the rake. Length of pick up: approx 16". Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 27 March 2013
Resolution: Received ABS class report attesting to satisfactory repairs.
Construction/Loadline › Hull › Weld
Issued 17 October 2012
Resolved
Centerline longitudinal bottom plating seam needs pick up weld. Longitudinal location: between 7 and 8 keel blocks from the turn of the rake. Length of pick up: approx 24". Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 24 January 2013
Resolution: Received photos of pick up welds, all sat.
Construction/Loadline › Hull › Weld
Issued 17 October 2012
Resolved
Centerline longitudinal bottom plating seam needs pick up weld. Longitudinal location: between 10 and 11 keel blocks from the turn of the rake. Length of pick up: approx 18". Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 24 January 2013
Resolution: Received photos of pick up welds, all sat.
Construction/Loadline › Hull › Weld
Issued 17 October 2012
Resolved
Transverse bottom weld seam, between 11 and 12 keel blocks from the turn of the rake, approx. 48" on either side of the centerline longitudinal bottom weld seam; needs a pickup weld. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 24 January 2013
Resolution: Received photos of pick up welds, all sat.
Construction/Loadline › Hull › Hull Plating
Issued 17 October 2012
Resolved
Tank 2 Port: Severe inset, 3rd long from port side shell, 2nd transverse beam from fwd bulkhead. Item to be addressed by ABS; Require documentation from ABS to clear. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 27 March 2013
Resolution: Received class report attesting to proper repairs.
Construction/Loadline › Hull › Hull Plating
Issued 17 October 2012
Resolved
FWD rake inset, near turn of rake, approx near center line as marked on hull. Item to be addressed by ABS; require documentation from ABS to clear. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 27 March 2013
Resolution: Received ABS class report attesting to proper repairs.
Construction/Loadline › Hull › Hull Plating
Issued 17 October 2012
Resolved
Provide steel gauging IWO lower rub rail and aft fender system. Renew prior to credit ISE/DD.
Action required: 705 - Other - as specified
Resolved 27 March 2013
Resolution: Received ABS class report, vessel is in compliance with rule thickness.
Construction/Loadline › Hull › Hull Plating
Issued 15 November 2011
Resolved
Based on damage report provided this afternoon, of the incident that took place on 11NOV11 at Mays Shipyard. The Chesapeake 1000 is denied movement till an ABS damage survey is performed and the report is submitted to the satisfaction of U.S. Coast Guard Sector New York.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 21 November 2011
Resolved 24 February 2016
Resolution: ABS Class Report.
Construction/Loadline › Hull › Side Shell
Issued 16 June 2010
Resolved
Barge rep is to provide ABS Surveyor results for all internal tank inspections, and is to keep CG abreast of all welding performances (back gouge, fit-up, air tests)
Action required: 705 - Other - as specified
Resolved 7 December 2010
Resolution: Received ABS class report (June-Oct). Air test was conducted on 12OCT10
Construction/Loadline › Hull › Longitudinal Frame
Issued 16 June 2010
Resolved
Provide gauging reports to Coast Guard via ABS Surveyor
Action required: 705 - Other - as specified
Resolved 7 October 2010
Resolution: Received ABS gauging report via email.
Documentation › Certificates/Documents › Annex VI Statement of Voluntary Compliance
Issued 16 June 2010
Resolved
Vessel is limited to domestic voyages until vessel is in compliance with MARPOL Annex VI
Action required: 705 - Other - as specified
Resolved 9 March 2011
Documentation › Certificates/Documents › Annex VI Statement of Voluntary Compliance
Issued 16 June 2010
Resolved
Provide USCG marine inspector all ABS reports from June 2010-October 2010, for vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 December 2010
Resolution: Received ABS class report (June-Oct10).
Communications › Radio Communications › EPIRB
Issued 8 September 2008
Resolved
Replace/repair EPIRB antenna.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 11 September 2008
Resolution: Barge replace replace antenna while onboard. Def Cleared
Engineering › Generator (propulsion/auxiliary-electric) › Outlet Box
Issued 8 September 2008
Resolved
Demonstrate over speed, Low lube oil, and high water temp shutdown for 350KW generator.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 3 November 2008
Resolution: Observed satisfactory over speed, low lube oil and high water temp shutdowns for 350KW gensets.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 8 September 2008
Resolved
Conduct hydrostatic test of 03 large air receivers.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 3 November 2008
Resolution: Conducted satisfactory hydrostatic tests of 03 air receivers.
Engineering › Generator (propulsion/auxiliary-electric) › Switch
Issued 8 September 2008
Resolved
Replace tachometer for 350 KW genset.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 3 November 2008
Resolution: Tachometer was replaced and operated satisfactory.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 27 July 2006
Resolved
Replace bulkhead in generator room prior to commercial operations.
Action required: 705 - Other - as specified
Resolved 21 August 2006
Resolution: Vessel replaced bulkhead in generator room.
Engineering › Fuel Oil Service System › Hose
Issued 27 July 2006
Resolved
Hoist room engine, replace fuel oil service hoses as discussed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 21 August 2006
Resolution: Vessel replaced fuel oil service hoses on Hoist room engine.
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (hydraulic)
Issued 27 July 2006
Resolved
Repair transmission sensor as discussed.
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 21 August 2006
Resolution: Vessel replaced transmission sensor on hoist engine.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 27 July 2006
Resolved
Install lagging on hoist engine as discussed.
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 21 August 2006
Resolution: Vessel installed lagging on hoist engine.
Engineering › Fuel Oil Service System › Hose
Issued 27 July 2006
Resolved
Generator room engine, replace fuel oil service hoses as discussed.
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 21 August 2006
Resolution: Vessel replaced fuel oil service hoses on the generator room engine.
Electrical › Lighting (service) › Lighting Fixture
Issued 27 July 2006
Resolved
Provide proper operation of Vessel's stern light.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 21 August 2006
Resolution: Vessel''s Stern Light is operating properly.
Engineering › Fuel Oil Service System › Hose
Issued 27 July 2006
Resolved
Replace fuel hose that services hoist room heater.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 21 August 2006
Resolution: Vessel replaced fuel hose which services hoist room heater.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 27 July 2006
Resolved
Install blank over hole on paint locker.
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 21 August 2006
Resolution: Vessel installed blank over the hole in the paint locker.
Engineering › Compressed Air System (control) › Valve
Issued 27 July 2006
Resolved
Provide proper operation of vessel's pressure relief valves.
Action required: 705 - Other - as specified
Due 27 August 2006
Resolved 21 August 2006
Resolution: Vessel tested pressure relief valves satisfactory.
Electrical › Electric Generation Source (service) › Generator
Issued 27 July 2006
Resolved
Provide proper operation of the vessels generator.
Action required: 705 - Other - as specified
Resolved 21 August 2006
Resolution: Vessel''s generator is operating according to the manufacture’s specifications
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 October 2005
Resolved
Install suitable guard on deck winch, starboard side, aft. (46 CFR 92.25-15)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 November 2005
Resolved 21 November 2005
Resolution: Found guard on deck winch satisfactory.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 28 October 2005
Resolved
Mark life jacket storage locker IAW 46 CFR 199.178.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 October 2005
Resolved 28 October 2005
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 28 October 2005
Resolved
Remove obstruction (welding equipment) from in front of life jacket storage locker. (46 CFR 199.190)
Action required: 17 - Rectify deficiencies prior to departure
Due 28 October 2005
Resolved 28 October 2005
Documentation › Markings/Placards › Lifejacket Placard
Issued 28 October 2005
Resolved
Post life jacket donning placard in a conspicuous location on main deck. (46 CFR 199.80)
Action required: 705 - Other - as specified
Due 28 November 2005
Resolved 21 November 2005
Resolution: Life jacket donning placard was posted.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 28 October 2005
Resolved
Provide means for securing overboard discharge valve on Type II MSD IAW 33 CFR 159.7.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 28 October 2005
Resolved 28 October 2005
Stability › Watertight Integrity › General
Issued 28 October 2005
Resolved
Clean, lubricate, and adjust all dogging devices on all watertight doors above the margin line. (46 CFR 171.122)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 November 2005
Resolved 21 November 2005
Resolution: Watertight dooris were found clean, lubricated, and adjusted.
Engineering › Diesel Engine (auxiliary) › Cylinder Head
Issued 28 October 2005
Resolved
Repair oil leaks on forward winch auxiliary diesel engine, replace oil soaked exhaust manifold insulation, and install insulation on exposed exhaust pipes. (46 CFR 58.01-20)
Action required: 17 - Rectify deficiencies prior to departure
Due 28 October 2005
Resolved 28 October 2005
Electrical › Electric Generation Source (service) › Generator
Issued 18 August 2004
Resolved
Corrected short circuited lite bulb fixture.
Condition: Unknown
Due 25 August 2004
Resolved 18 August 2004
Engineering › Diesel Engine (auxiliary)
Issued 25 July 2003
Resolved
NY01: Repair cracked glass on oil pressure gauge (main diesel generator).
Condition: Unknown
Due 25 August 2003
Resolved 29 August 2003
Engineering › Diesel Engine (auxiliary)
Issued 25 July 2003
Resolved
NY02: Repair cracked glass on water temperature gauge (main diesel generator).
Condition: Unknown
Due 25 August 2003
Resolved 29 August 2003
Lifesaving › Buoyant Smoke Signals
Issued 25 July 2003
Resolved
NY04: Replace both P & S smoke buoys.
Condition: Unknown
Due 25 August 2003
Resolved 29 August 2003
Deck/Cargo › Cargo Transfer (solid)
Issued 25 July 2003
Resolved
NY05: Port crane-safe working load not posted clearly. Must be marked with safe working load.
Condition: Placed in Improper Service
Due 25 August 2003
Resolved 29 August 2003
Engineering › Diesel Engine (auxiliary)
Issued 25 July 2003
Resolved
NY06: Prove proper testing of main diesel generator to attending marine inspector. Test to include overspeed trip, low lube oil cut-off, high cooling water temp, ect.
Due 25 August 2003
Resolved 29 August 2003
Lifesaving › Inflatable Liferafts
Issued 25 July 2003
Resolved
NY07: Mount liferaft upon return from servicing.
Condition: Improper/Lack of Maintenance
Due 25 August 2003
Resolved 29 August 2003
Pollution Prevention/Response › Prevention Equipment
Issued 7 January 2003
Resolved
Vessel 500 gallon fuel tank located aft of engineering space and forward of the crane is missing fixed containment 33 CFR 155.320. LEGACY COMPONENT DESC: Fixed Containment
Condition: Unknown
Action required: 705 - Other - as specified
Due 7 February 2003
Resolved 7 January 2003
Resolution: Vessel meets requirements. Inspection notes enclosed.
Accommodation/Occupational Safety › Occupational Safety
Issued 7 January 2003
Resolved
Starboard aft railing possesses a bent center course. LEGACY COMPONENT DESC: Railings
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 February 2003
Resolved 15 January 2003
Resolution: Railings repaired to the satisfaction of attending MI.
Engineering › Fuel Oil Storage/Transfer System
Issued 7 January 2003
Resolved
Hydraulic and lube oil drums in cradles located on portside of house are not properly lashed. LEGACY COMPONENT DESC: Lube oil drums on deck
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 January 2003
Resolved 15 January 2003
Resolution: Drums properly lashed to the satisfaction of attending MI.
Engineering › Compressed Air System (control)
Issued 7 January 2003
Resolved
Remove improperly installed trailerable air compressor on deck. LEGACY COMPONENT DESC: Trailerable air compressor
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 January 2003
Resolved 15 January 2003
Resolution: Trailer removed to the satisfaction of attending MI.
Documentation › Certificates/Documents
Issued 7 January 2003
Resolved
Vessel was missing a valid International loadline certificate. LEGACY COMPONENT DESC: International Load Line Certificate
Action required: 705 - Other - as specified
Due 15 January 2003
Resolved 15 January 2003
Resolution: Current loadline certificate onbaord as required.
Documentation › Certificates/Documents
Issued 7 January 2003
Resolved
Vessel is classed by ABS and is missing a valid class document. LEGACY COMPONENT DESC: Classification Certificate
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 January 2003
Resolved 15 January 2003
Resolution: Vesel not required to be classed. Witnessed ABS database which revealled 31Jul03 Hull suurvey date. Advised Captain to obtain certificate and file with other vessel document as soon as it is received from class.
Accommodation/Occupational Safety › Sleeping Accommodations
Issued 7 January 2003
Resolved
Vessel's accomodation space contains unsecured lockers/cabinets. LEGACY COMPONENT DESC: Locker
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 February 2003
Resolved 15 January 2003
Resolution: Lockers secured to the satisfaction of attending MI.
Accommodation/Occupational Safety › Sleeping Accommodations
Issued 7 January 2003
Resolved
Properly secure racks (Bunks) where intentionally cut. LEGACY COMPONENT DESC: Berth
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 February 2003
Resolved 15 January 2003
Resolution: Properly secured to the satisfaction of attending MI.
Accommodation/Occupational Safety › Ventilation
Issued 7 January 2003
Resolved
Repair vent in accom. space escape hatch to secure as designed. LEGACY COMPONENT DESC: Escape hatch
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 February 2003
Resolved 15 January 2003
Resolution: Hatch repaired and operable to the satisfaction of attending MI.
Accommodation/Occupational Safety › Refrigeration (air conditioning)
Issued 7 January 2003
Resolved
Make air conditioning unit weather tight. LEGACY COMPONENT DESC: Unit
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 February 2003
Resolved 15 January 2003
Resolution: Cover installed to the satisfaction of attending MI.
Construction/Loadline › Penetrations › Gasket
Issued 7 January 2003
Resolved
Ballast tank hatch cover gasket retaining ring wasted. Repair at next drydock or sooner if leaking. Affected tanks 2 P&S, 5 P&S, and 6 P&S. LEGACY COMPONENT DESC: Gasket
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2005
Resolved 18 August 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 7 January 2003
Resolved
Accomodation space emergency escape was locked with a padlock and blocked by a bench outside. LEGACY COMPONENT DESC: Exits locked and blocked
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 January 2003
Resolved 7 January 2003
Resolution: Bench and lock removed. Advised crew to keep exits clear while onboard.
Engineering › Pressure Vessel
Issued 7 January 2003
Resolved
Vessel's (4) unfired pressure vessel's were over one year over due for inspection. Make ready for inspection by 15Jan03. USCG to witness hydrostatic testing for each unit. LEGACY COMPONENT DESC: Inspection
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 January 2003
Resolved 15 January 2003
Resolution: Witnessed hydrostatic testing of (4) unfired pressure vessel''s as required. CG-858 issued giving credit for test.
Engineering › Diesel Engine (auxiliary)
Issued 7 January 2003
Resolved
Test 150 kW generator overspeed trip/shut-down. Crew lacked knowledge to conduct test properly. Test to be conducted by a qualified person with USCG witness. LEGACY COMPONENT DESC: Governor
Action required: 705 - Other - as specified
Due 15 January 2003
Resolved 15 January 2003
Resolution: Witnessed overspeed trip test of 150 kW generator. All sat.
Documentation › Logs/Records
Issued 7 January 2003
Resolved
Provide unaltered copies of unofficial logbook to prove vessel operation beyond 90 day window for annual inspection. LEGACY COMPONENT DESC: Logbook/Record (unofficial)
Action required: 705 - Other - as specified
Due 15 January 2003
Resolved 15 January 2003
Resolution: Obtained copies and will forward to IO''s.
Documentation › Certificates/Documents
Issued 24 April 2002
Resolved
Vsl is restricted to operations inside the boundary line until vsl receives a valid Load Line Certificate. LEGACY COMPONENT DESC: International Load Line Certificate
Condition: Improper/Lack of Maintenance
Due 8 July 2002
Resolved 8 July 2002
Resolution: Vessel obtained an Internation Load Line certificate from ABS. This Interim certificate expires 07 Dec 02.
Lifesaving
Issued 31 July 2001
Resolved
Hydrostatic release for the liferaft is outdated.
Condition: Unknown
Due 3 August 2001
Resolved 19 September 2001
Unknown
Issued 15 December 2000
Resolved
PROVE SATISFACTORY OPERATION OF #1 AND #2 AIR RECEIVER SAFETY RELIEF VALVES.
Condition: Unknown
Due 15 December 2000
Resolved 22 March 2001
Lifesaving
Issued 15 December 2000
Resolved
INSTALL/PROVIDE RESCUE BOAT OR PROVIDE PROPOSAL FOR SUITABLE ALTERNATIVE TOOCMI NEW YORK
Condition: Unknown
Due 29 December 2000
Resolved 22 March 2001
Electrical
Issued 15 December 2000
Resolved
PERMANENTLY REPAIR, PROVE DEAD AT BOTH ENDS OR INSTALL JUNCTION BOX TO DEADEND WIRES UNDER CRANE CAB.
Condition: Unknown
Due 15 January 2001
Resolved 22 March 2001
Documentation
Issued 4 January 2000
Resolved
PROVIDE COPY OF DAPI CONTRACT,COMPANY POLICY AND POST 1800 PHONE NUMBER FORSAME.
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Engineering
Issued 4 January 2000
Resolved
INSTALL LAGGING ON CRANE ENGINE EXHUAST PIPING.
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Accommodation/Occupational Safety
Issued 4 January 2000
Resolved
INSTALL A GUARD RAIL IWO THE CRANE ENGINE AND THE BOOM CRANE WIRE SPOOL. SAFETY HAZARD.
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Electrical
Issued 4 January 2000
Resolved
REPAIR/REPLACE MAIN OIL SEAL ON AFT GENERATOR.
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Electrical
Issued 4 January 2000
Resolved
REPAIR GROUNDS ON 120 AND 440 VAC PANEL IN ENGINEROOM.
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Electrical
Issued 4 January 2000
Resolved
SECURE FORWARD NAV LIGHT BATTERY BOX AND INSTALL A COVER ON SAME.
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Engineering
Issued 4 January 2000
Resolved
INSTALL LAGGING ON AFT GENERATOR EXHUAST PIPING.
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Deck/Cargo
Issued 4 January 2000
Resolved
PROVIDE AND COMPLETE A CARGO HANDLING EQUIPMENT INSPECTION LOG IN ACCORDANCE WITH 46 CFR 91.37-70
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Lifesaving
Issued 4 January 2000
Resolved
REPAIR/ REPLACE STBD SIDE RING BUOY LIGHT.
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Fire Fighting
Issued 15 December 1998
Resolved
Provide 1 portable fire extinguisher in vicinity of flammable liquid lockeraccess to satisfaction of attending marine inspector.
Condition: Unknown
Due 15 January 1999
Resolved 23 December 1998
Electrical
Issued 15 December 1998
Resolved
Prove proper operation of navigation light battery charging system to satisfaction of attending marine inspector.
Condition: Unknown
Due 15 January 1999
Resolved 15 January 1999
Fire Fighting
Issued 15 December 1998
Resolved
Properly mount extinguisher in crane operation house, to satisfaction of attending mariner inspector.
Condition: Unknown
Due 15 January 1999
Resolved 23 December 1998
Lifesaving
Issued 15 December 1998
Resolved
Provide self-igniting smoke signals for 2 ring bouys IAW 46 CFR 199.70(a)(3)(iii).
Condition: Unknown
Due 22 January 1999
Resolved 15 January 1999
Electrical
Issued 15 December 1998
Resolved
Remove dead end wiring in ballast room, port side.
Condition: Unknown
Due 15 January 1999
Resolved 15 January 1999
Lifesaving
Issued 15 December 1998
Resolved
Properly mark three un-stenciled ring bouys.
Condition: Unknown
Due 15 January 1999
Resolved 23 December 1998
Lifesaving
Issued 15 December 1998
Resolved
Provide 406 MHz/CAT I EPIRB aboard vessel, properly mounted and registered with NOAA, IAW 46 CFR 199.510. Vessel restricted to Coastwise route until corrected.
Condition: Unknown
Due 22 January 1999
Resolved 15 January 1999
Lifesaving
Issued 15 December 1998
Resolved
Provide rescue boat aboard vessel IAW 46 CFR 199.262 and prove proper operation/launching to satisfaction of attending marine inspector. Vessel restricted to Coastwise route until corrected.
Condition: Unknown
Due 22 February 1999
Resolved 22 January 1999
Lifesaving
Issued 15 December 1998
Resolved
Remove inoperative/hanging HVAC unit from bottom of crane operation house.
Condition: Unknown
Due 15 January 1999
Resolved 15 January 1999
Deck/Cargo
Issued 15 December 1998
Resolved
Prove proper operation of all mooring/anchor winches to satisfaction of attending marine inspector.
Condition: Unknown
Due 15 January 1999
Resolved 23 December 1998
Lifesaving
Issued 15 December 1998
Resolved
Remove from vessel flammable gas bottle, stbd side, midships.
Condition: Unknown
Due 15 January 1999
Resolved 23 December 1998
Lifesaving
Issued 15 December 1998
Resolved
Remove paint/flammable liquids from backup generator room and stbd storage house. Place in flammable storage locker._x001C_
Condition: Unknown
Due 15 January 1999
Resolved 23 December 1998
Lifesaving
Issued 15 December 1998
Resolved
Remove both independent motor/pump/spool units from vessel OR provide satisfactory evidence that these two units do not adversely affect/change vessel's satability data.
Condition: Unknown
Due 15 December 1998
Resolved 15 December 1998
Documentation
Issued 15 December 1998
Resolved
Provide copy of valid Loadline Certificate. Vessel restricted to Lakes, Bays & Sounds route until corrected.
Condition: Unknown
Due 15 January 1999
Resolved 23 December 1998
Lifesaving
Issued 15 December 1998
Resolved
Prove proper operation of air reciever relief valves for reciever in _x001C_ 1) Winch room and_x001C_ 2) #2 reciever in generator room.
Condition: Unknown
Due 15 January 1999
Resolved 15 January 1999
Fire Fighting
Issued 15 December 1998
Resolved
Provide proof of annual servicing for all portable fire extinguishers.
Condition: Unknown
Due 15 January 1999
Resolved 23 December 1998
Electrical
Issued 15 December 1998
Resolved
Secure batteries for backup generator to satisfaction of attending Marine Inspector.
Condition: Unknown
Due 15 January 1999
Resolved 23 December 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#2 STBD TANK; V/WELD #4 SIDE SHELL LONGITUDINAL, MIDWAY IN BAY 4, STBD SIDE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#5 PORT TANK; CROP/RENEW TRIPING BRACKETS 3,4,5,6 IN LAST BAY, PORT SIDE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Documentation
Issued 16 May 1997
Resolved
PROVIDE INTERNATIONAL LOADLINE REFLECTING MANNED OPERATIONS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
COMPLETE NUMEROUS PICKUP WELDS ON HULL. CLASS REPORT FOR COMPLETION OF WORK WILL BE ACCEPTED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#2 STBD TANK; V/WELD #3 SIDE SHELL LONGITUDINAL, MIDWAY IN BAY 4, STBD SIDE.
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#6 PORT TANK; CROP/RENEW TRIPING BRACKETS 4,5,6 IN 6TH BAY, PORT SIDE & REPLACE BENT METAL IWO TRIPS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
REPAIR/PATCH HOLE IN RUB RAIL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#3 STBD TANK; V/WELD #7 SIDE SHELL LONGITUDINAL IWO #2 VERTICAL FRAME ON STBD SIDE, 3RD BAY.
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#5 PORT TANK; CROP/RENEW TRIPING BRACKETS 2,3,4,5 IN LAST BAY, PORT SIDE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#4 PORT TANK; V/WELD #6 SIDE SHELL LONGITUDINAL IWO VERTICAL STIFFINER, LAST BAY, PORT SIDE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#2 PORT TANK; V/WELD #2 & #3 SIDE SHELL LONGITUDINAL IN 4TH BAY, PORT SIDE.
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#2 PORT TANK; CROP/RENEW TRIPPING BRACKETS 1,2,3 IN 4TH BAY, PORT SIDE.
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 16 May 1997
Resolved
#1 PORT TANK; CROP/RENEW TRIPPING BRACKET IN BAY #2, PORT SIDE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1997
Resolved 12 January 1998
Construction/Loadline
Issued 2 January 1997
Resolved
Crane is not to be used until class report is received by this office stating that the crane is fit for use as certified._x001C_ Amended 03JAN97 as per ABS report dated 02JAN97 the vessels 1000 ton crane shall be derated to 750 tons until permanent repairs completed to ABS sat.
Condition: Unknown
Due 2 January 1997
Resolved 2 January 1997
Construction/Loadline
Issued 19 December 1996
Resolved
# 1 CENTER TANK: V/W #9 VERTICAL STIFFNER IWO FWD BLKHD.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#1 CENTER TANK, BAY #1: C/R #7 VERTICAL STIFFNER APRROX. 8" X 5'.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 STBD, BAY 2: V/W SSL #2,3,4,5,6 IWO DWVF #2
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 STBD, BAY 3: V/W SSL #2,3 ON BOTH SIDES IWO DWVF #1
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#6 PORT, BAY 6: V/W SSL #6 ON BOTH SIDES IWO #3 DWVF.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#6 PORT, BAY 6: V/W SSL #3, 4, 5, 7 IWO #3 DWVF (IN LAST COMPARTMENT BEFOREAFT BLKHD).
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 PORT, BAY 2: V/W APPROX. 4 1/2 FT OF SSL #5,6,7 ON BOTH SIDES OF DWVF #2.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 PORT, BAY 3: V/W SSL #2, 5, 6, 7 ON BOTH SIDES IWO DWVF #3.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 PORT, BAY 3: C/R APPROX. 4 1/2 FT OF SSL #3, 4 IWO DWVF #3.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 PORT, BAY 1: C/R VSL #2,3,4 APPROX. 4 1/2, IWO DWVF #1.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 PORT, BAY 1: V/W SSL #5-8 IWO DWVF #1.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 PORT, BAY 2: C/R APPROX 4 1/2 FT. OF SSL #2,3,4 IWO DWVF #2.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Documentation
Issued 19 December 1996
Resolved
PROVIDE AN APPROVED SHIPBOARD OIL POLLUTION EMERGENCY PLAN (SOPEP). UNTIL THE SOPEP IS APPROVED BY COAST GUARD HEADQUARTERS, NO OIL IN ANY FORM MAY BE CARRIED ONBOARD.
Condition: Unknown
Due 31 January 1997
Resolved 6 February 1997
Deck/Cargo
Issued 19 December 1996
Resolved
INSTALL COVER & SHIELD TO CARGO WINCH CONTROLLER AROUND COMUTATOR.
Condition: Unknown
Due 20 January 1997
Resolved 6 February 1997
Electrical
Issued 19 December 1996
Resolved
DEMONSTRATE PROPER OPERATION OF 440 VOLT AND 11O VOLT GROUND INDICATOR LIGHTS.
Condition: Unknown
Due 20 January 1997
Resolved 6 February 1997
Electrical
Issued 19 December 1996
Resolved
INSTALL APPROVED BREAKER BOX AND INTERLOCK FOR SHIP SERVICE GENERATOR BREAKERS.
Condition: Unknown
Due 20 January 1997
Resolved 6 February 1997
Electrical
Issued 19 December 1996
Resolved
PROPERLY INSTALL AND WIRE BATTERY CHARGER FOR AIR COMPRESSOR USING APPROVEDMARINE TYPE BATTERY CHARGER.
Condition: Unknown
Due 20 January 1997
Resolved 6 February 1997
Electrical
Issued 19 December 1996
Resolved
PROPERLY INSTALL AND WIRE APPROVED BATTERY CHARGER BY MAIN SWITHBOARD (EMERGENCY LIGHTING AND RADIO).
Condition: Unknown
Due 20 January 1997
Resolved 6 February 1997
Electrical
Issued 19 December 1996
Resolved
LIST INDEX TO BREAKER BOX IN GALLEY.
Condition: Unknown
Due 20 January 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#1 PORT, BAY #1: C/R APPROX 3' OF #4 BL IWO #3 VERTICAL STIFFNER.
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#1 PORT, BAY 1: C/R #3 VERTICAL STIFFNER (APPROX 2'X3') IWO FWD BULKHEAD & BL #4
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#1 STBD: V/W SSL #2 IWO DWVF #3.
Condition: Unknown
Due 6 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 STBD, BAY 3: C/R APPROX. 4 1/2 FT OF SSL #4 IWO DWVF #1
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 STBD BAY 1: V/W SSL #1,2,6 ON BOTH SIDES IWO DWVF #3
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 STBD, BAY 1: C/R APPROX 4 1/2' OF SSL #3 & 4 IWO DWVF #3
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#2 STBD, BAY 1: V/W SSL #5, 6 IWO DWVF #3
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#1 STBD: C/R APRROX. 2' OF #4 DWVF
Condition: Unknown
Due 20 February 1997
Resolved 6 February 1997
Construction/Loadline
Issued 19 December 1996
Resolved
#6 STBD, BAY 1: V/W ON BOTH SIDES SSL #6 IWO DWVF #1.
Condition: Unknown
Due 6 February 1997
Resolved 6 February 1997
Fire Fighting
Issued 1 August 1994
Resolved
PROVIDE DOCUMENTATION/EVIDENCE OF ANNUAL SERVING OF FIRE EXTINQUISHERS.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Engineering
Issued 1 August 1994
Resolved
CONDUCT HYDRO/INTERNAL EXAM OF AIR RECEIVERS AND RELIEF VALVES TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Lifesaving
Issued 1 August 1994
Resolved
PROVIDE DOCUMENTATION/EVIDENCE OF ANNUAL SERVICING OF LIFERAFT.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Lifesaving
Issued 27 May 1987
Resolved
PROVIDE 5 EXPOSURE SUITS.
Condition: Unknown
Due 27 May 1987
Resolved 27 May 1987
Deck/Cargo
Issued 27 May 1987
Resolved
PROVIDE APPROVED PLANS FOR NEW CRANE INSTALLATION PRIOR TO PLACING VESSEL IN SERVICE.
Condition: Unknown
Due 27 May 1987
Resolved 27 May 1987
Construction/Loadline
Issued 27 May 1987
Resolved
RENEW DAMAGED SHELL AND BOTTOM PLATING.
Condition: Unknown
Due 27 May 1987
Resolved 27 May 1987
Deck/Cargo
Issued 27 May 1987
Resolved
CONDUCT REQUIRED TESTING OF CRANE TO SATISFACTION OF THE COGNIZANT OCMI ANDABS PRIOR TO PLACING IN SERVICE.
Condition: Unknown
Due 27 May 1987
Resolved 27 May 1987
Documentation
Issued 27 May 1987
Resolved
PROVIDE NEW TRIM AND STABILITY BOOKLET PRIOR TO PLACING VESSEL IN SERVICE.
Condition: Unknown
Due 27 May 1987
Resolved 27 May 1987
Unknown
Issued 27 May 1987
Resolved
PROVIDE APPROVED PLANS FOR DIESEL FUEL TANK MODIFICATIONS.
Condition: Unknown
Due 27 May 1987
Resolved 27 May 1987
Construction/Loadline
Issued 28 January 1987
Resolved
MAKE PERMENANT REPAIRS TO NON-WATERTIGHT BULKHEADS AND BOTTOM LONGITUDINAL BRACKETS IN # 6S TANK.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Documentation
Issued 23 July 1986
Resolved
PROVIDE VALID CERTIFICATE OF FINANCIAL RESPONSIBILITY TO REPLACE TEMPORARY COFR.
Condition: Unknown
Due 23 July 1986
Resolved 23 July 1986
Electrical
Issued 23 July 1986
Resolved
PROVDE SATISFACTORY OPERATION OF OVERSPEED TRIP ON MAIN GENERATOR.
Condition: Unknown
Due 23 July 1986
Resolved 23 July 1986