Inspection history · 22
28 May 2026
Examination of Repairs · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8396022
1 October 2025
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8245004
11 June 2025
Examination of Repairs · Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8127528
7 October 2024
Annual Inspection · Deficiency Check · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8016350
19 October 2023
Deficiency Check · Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7810656
30 May 2023
Deficiency Check · Hull Examination · Drydock Exam · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7702250
8 March 2023
Administrative Inspection
Administrative · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7541092
11 October 2022
Deficiency Check · DAPI Audit · MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7572809
27 July 2022
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7517883
2 September 2021
MTSA Verification · Annual Inspection · Administrative Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7300417
15 October 2020
MTSA Verification · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7076449
13 July 2020
Internal Structural Exam · Examination of Repairs · Drydock Exam · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7006190
31 October 2019
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6846605
28 November 2018
Administrative Inspection · Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6611873
16 April 2018
Drydock Exam · Examination of Repairs · Internal Structural Exam · Plan Review (Other than "T") · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6392533
22 December 2017
Administrative Inspection
Administrative · Navigation Center · Activity 6327919
14 December 2017
Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6331582
3 December 2017
Type not recorded
No type recorded · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6330236
13 November 2017
Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6320553
31 January 2017
Deficiency Check · Administrative Inspection · Annual Inspection · MTSA Verification · Cargo Tank Internal
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6079779
1 February 2016
Administrative Inspection · Spot Check · Plan Review (Other than "T")
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5917720
8 January 2016
Type not recorded
No type recorded · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 5798331
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 7 October 2024
Resolved
The master is required to record the type of service in the vessel's logbook when the vessel's service has changed. No entry has been made when service has changed.
Action required: 10 - Deficiency Rectified
Resolved 7 October 2024
Resolution: vessel master educated to log change of service
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 October 2024
Resolved
Deadend wires were found in 01 deck AB stateroom. Remove wires or place them in J-box.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 November 2024
Resolved 14 October 2024
Resolution: wires placed in j-box
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 October 2024
Resolved
Water tight bulkhead has a penetration opening that is not plugged, thus the bulkhead is not watertight. Ensure bulkhead is watertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 November 2024
Resolved 14 October 2024
Resolution: penetration made watertight
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 19 October 2023
Resolved
Stowage height marked on port liferaft is 6 m. Height of liferaft stowage is greater than 6 m. Ensure liferaft is stowed properly or the liferaft is equipped with the proper sea painter length.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 November 2023
Resolved 13 November 2023
Resolution: Servicing facility extended painter line lenght to permit stowage at up to 10 m above waterline.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 19 October 2023
Resolved
Multiple space heaters found to be plugged in to extension cords. Ensure space heaters are plugged directly into outlets.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 November 2023
Resolved 29 November 2023
Resolution: Vsl rep verified extension cords removed
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 19 October 2023
Resolved
2S F/O tank small discharge containment was holed (wasted) on the outboard side. Make temp repairs until permanent repairs can be made at next scheduled drydock.
Action required: 705 - Other - as specified
Due 31 July 2025
Resolved 1 July 2025
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 19 October 2023
Resolved
Battery of EPIRB was expired. Vsl rep had battery renewed prior to completion of inspection. Cleared onsite.
Action required: 10 - Deficiency Rectified
Resolved 19 October 2023
Resolution: Battery renewed.
14 - Pollution Prevention › 148 - Ballast Water › Ballast water retention
Issued 30 May 2023
Resolved
Marine inspectors shall have rights of access to any place where work concerned with the piping is being performed. Vessel is replacing a section of ballast water piping. Submit plans for repair that include pressure testing of replaced section.
46 CFR 56.95-5
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 14 July 2023
Resolution: Pressure tested with shipyard. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 30 May 2023
Resolved
Except as provided in paragraph (c) of this section, OSVs must carry one or more liferafts with an aggregate capacity that will accommodate the total number of persons on board. The liferafts must be—
Stowed in a position providing for easy side-to-side transfer at a single open deck level; or
Additional liferafts must be provided to bring the total capacity available on each side to at least 100 percent of the total number of persons on board. Vessel required to carry 25 person liferaft on each side. one liferaft failed servicing and has been condemned. Replace liferaft to port side prior to departing Port of San Francisco COTP zone.
46 CFR 133.105(b)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 July 2023
Resolution: Leased liferaft installed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 8 March 2023
Resolved
Per regulations, vessel is required an additional properly licensed engineer. Provide proposal to meet manning requirements.
Action required: 705 - Other - as specified
Due 1 July 2024
Resolved 23 June 2025
Resolution: all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 October 2022
Resolved
Replace bubbling cooling water hose on both Generators.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2022
Resolved 7 November 2022
Resolution: replaced all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 11 October 2022
Resolved
Replace starboard side life raft with one that meets storage height requirements.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2022
Resolved 20 October 2022
Resolution: Servicing company mislabelled and relabelled correctly.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 October 2022
Resolved
cap off old line on starboard side blunkhead bow thruster engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2022
Resolved 20 October 2022
Resolution: capped
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 October 2022
Resolved
Install cap/plug in water drain valve in fuel filters for port and starboard mains.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2022
Resolved 20 October 2022
Resolution: installed
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 2 September 2021
Resolved
Each general alarm bell must be identified by red letters at least 13 millimeters ( 1/2 -inch) high that state the following: “GENERAL ALARM—WHEN BELL RINGS GO TO YOUR STATION.” Engine room is miss.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 10 September 2021
Resolution: Vessel has posted new signage
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 2 September 2021
Resolved
Install planner line to the float-free link ,connecting to the vessel in a float free arrangement.
Action required: 10 - Deficiency Rectified
Due 2 September 2021
Resolved 2 September 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 September 2021
Resolved
Install caps or plugs to prevent leakage for all Racor Fuel Filter in Engine room
Action required: 10 - Deficiency Rectified
Due 2 September 2021
Resolved 2 September 2021
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 2 September 2021
Resolved
Start and maintain all required Towing line/gear logs as per 33 CFR 164.74 prior to conducting an towing operation.
Action required: 705 - Other - as specified
Due 2 September 2021
Resolved 10 September 2021
Resolution: Rcvd report for completed inspection of towing gear with new record logs
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 2 September 2021
Resolved
remove all items blocking emergency exit door in galley
Action required: 10 - Deficiency Rectified
Due 2 September 2021
Resolved 2 September 2021
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 2 September 2021
Resolved
Reinstall lagging to prevent crew from touching hot surfaces
Action required: 10 - Deficiency Rectified
Due 2 September 2021
Resolved 2 September 2021
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 2 September 2021
Resolved
Correctly install heat detector over port generator to prevent damage to wiring and detector
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 10 September 2021
Resolution: Rcvd Pic for correctly installed heat decector
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 September 2021
Resolved
Install missing plugs in all electrical outlets in the galley and flute room to prevent electrical shock to crew members
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 6 October 2021
Resolution: All electrical outlets hae been pluged.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 2 September 2021
Resolved
Replaced remove fire boundary installation above the bow thruster engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 22 September 2021
Resolution: Installation has been replaced.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 2 September 2021
Resolved
Update vessel FCC Station license to show the correct Official number.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 10 September 2021
Resolution: vessel has updated FCC Station license online and is waiting on update one to arrive
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 2 September 2021
Resolved
Submit current ABS Stability Book date 2005 to MSC and request an new Stability Letter
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 10 September 2021
Resolution: rcvd ABS letter with stating that stability book shalled be noted on Load line to meet requirments of 46 CFR 170.120. Old USCG Stability letter to be removed and ABS letter to replace it.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 2 September 2021
Resolved
Provide fourth service for line throwing kit. Kit is missing one
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2021
Resolved 6 October 2021
Resolution: Vessel has rcvd four line.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 31 October 2019
Resolved
Mark the emergency exit for the stbd side of the engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 November 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 31 October 2019
Resolved
Install approved fitting on port gen where compression fitting is at next drydock.
Action required: 705 - Other - as specified
Due 30 July 2020
Resolved 18 August 2020
Resolution: Received photo of generator piping and statement of satisfactory operation.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 31 October 2019
Resolved
Provide evidence that sight glasses are approved or install approved sight glasses.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 April 2020
Resolution: Sight glasses were replaced with proper ones
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 31 October 2019
Resolved
Ensure e-light in steering gear room is operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 November 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 November 2018
Resolved
Provide evidence of satisfactory overspeed tests on generators that shows speed does not exceed 15% of maximum rated speed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2018
Resolved 16 January 2019
Resolution: Vessel rep submitted letter from [name withheld] attesting to overspeed.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 28 November 2018
Resolved
A placard with emergency broadcast instructions specific to the vessel must be posted next to all radiotelephone installations.
47CFR80.868
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2018
Resolved 25 January 2019
Resolution: Emergency Broadcast Placard was installed over the radio on the bridge.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 November 2018
Resolved
The self-igniting lights attached to the lifebuoys must meet CG approval 46CFR161.010 which includes a list of approved batteries on the canister of the light. Replaced the batteries with an approved type.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2018
Resolved 25 January 2019
Resolution: MI verified all batteries were approved and working properly.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 28 November 2018
Resolved
Provide a Coast Guard approved rescue boat for access during towing operations. Current skiff onboard is not CG-approved.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2018
Resolved 25 January 2019
Resolution: MI routed for approval to OCMI the use of D8 policy letter 11-98 for use of workboat as rescue boat on domestic route. OCMI granted approval.
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 28 November 2018
Resolved
No periodically unattended machinery space may exceed the noise level of 110 dB(A). Identify source of noise from rudder and repair as necessary.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2018
Resolved 16 January 2019
Resolution: MI received dive report and drydock supervisor from CA that bearings are tightened on rudder and as they wear the noise will reduce. 1/25/2019 MI conducted another steering test and found noise only present from 15- 30 degrees on port side.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 November 2018
Resolved
If additional lighting in the engine room is required, it must be hard wired into the vessel's electrical system, not a portable lamp.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2018
Resolved 25 January 2019
Resolution: MI verified light with electrical cord on E/R was removed.
Construction/Loadline › Structures › Deck Plating
Issued 14 December 2017
Resolved
Make permanent repair to stbdside main deck plating and mooring cleat between frames 97 and 98.
Action required: 705 - Other - as specified
Due 14 January 2018
Resolved 18 December 2017
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 13 November 2017
Resolved
Vessel needs to add exhaust lagging over the MDEs exhaust due to missing.
Action required: 705 - Other - as specified
Resolved 11 July 2018
Resolution: Exaust Blankets Installed.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (air intake)
Issued 13 November 2017
Resolved
Vessel has dresser couplings on their vital systems. Vessel must remove dresser couplings and install proper flex couplings.
Action required: 705 - Other - as specified
Resolved 11 August 2018
Resolution: Dresser Couplings Removed, Plan Approved Flanged Proco Braided Connectors Installed.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 31 January 2017
Resolved
Vessel had several discrepancies with the FCP-see narrative.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 15 June 2017
Resolution: [name withheld] conducted FCP review on the 15Jun and issued approval letter and stamped FCP on 21Jun.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 31 January 2017
Resolved
FCC certificate expired.
Due 2 March 2017
Resolved 24 February 2017
Resolution: Vessel had qualified FCC operator issue new certificates.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 31 January 2017
Resolved
Port fresh water tank access hatch in the bow thruster room is missing a threaded stud and is currently sealed with a wooden plug and sealant.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 20 July 2017
Resolution: Vessel replaced hatch cover to the satisfaction of [name withheld].
Construction/Loadline › Structures › Ventilators
Issued 31 January 2017
Resolved
Wasted air duct between bow thruster space and the air handler in the mess deck area. This is the bulkhead deck and required to be watertight.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 4 June 2018
Resolution: Airduct was replaced.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 31 January 2017
Resolved
Garden hose running through openings from the bow thruster room and engine room watertight bulkheads. Remove and seal bulkheads.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 20 July 2017
Resolution: [name withheld] clear deficiency.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 31 January 2017
Resolved
Distribution panels on fwd engine and stbd bulkhead below air receiver are not equipped with drip protection.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 21 June 2017
Resolution: Cleared by [name withheld].
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 31 January 2017
Resolved
Several discrepancies in the vessel's PSTPs-see narrative.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 21 June 2017
Resolution: Cleared this deficiency and issued 2 new CG-835s to make repairs to the #9P ballast tank.
Deck/Cargo › Ballast › Tank
Issued 31 January 2017
Resolved
The #9 stern ballast tank has frozen and bulged the tank into the steering compartment.Vessel must prepare tank for entry for attending MI at next dry-dock.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 15 June 2017
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 31 January 2017
Resolved
Vessel must replace all retro material.
Action required: 705 - Other - as specified
Due 2 March 2017
Resolved 22 February 2017
Resolution: [name withheld] verified retro on all lifejackets.
Accommodation/Occupational Safety › Ventilation › General
Issued 31 January 2017
Resolved
The remote ventilation shutdown for the engineroom ventilation is inoperable.
Action required: 705 - Other - as specified
Due 2 March 2017
Resolved 22 February 2017
Resolution: [name withheld] verified operation of shutdowns.