Records from 1999 to 2025. Most recent: inspection, 5 May 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the tow units, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 49
5 May 2025
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8129831
14 January 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8063856
1 May 2024
Administrative Inspection · COI Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7899700
2 August 2023
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7757025
9 June 2022
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7472293
19 May 2021
Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7200392
6 May 2020
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6949213
8 May 2019
COI Inspection · Internal Structural Exam · MTSA Verification · Examination of Repairs · Cargo Tank Internal · Drydock Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6655016
10 May 2018
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6416116
22 March 2018
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6376715
20 April 2017
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6126727
29 March 2016
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5842572
26 February 2016
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5822944
10 April 2015
Examination of Repairs · Administrative Inspection · Annual Inspection · Damage Survey · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5103839
23 March 2015
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5089837
23 March 2015
Administrative Inspection · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5090146
5 December 2014
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5036204
11 April 2014
Internal Structural Exam · Examination of Repairs · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4832672
3 July 2012
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4369873
4 June 2012
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4328425
22 March 2012
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4277982
15 June 2011
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4040652
26 April 2010
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3724537
9 March 2010
Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3693151
9 March 2010
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3697518
24 February 2010
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3681276
6 February 2010
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3677688
6 February 2010
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3682685
3 March 2009
Internal Structural Exam · MTSA Verification · COI Inspection · Examination of Repairs · Cargo Tank Internal · Hull Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3426564
3 April 2008
Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3175191
1 March 2007
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2878745
24 March 2006
Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2608750
23 March 2006
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2608942
22 February 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2590065
1 February 2006
Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2577708
18 January 2006
COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2567963
20 April 2005
MTSA Verification · Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2338599
31 March 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2034732
29 March 2004
Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2033066
5 February 2004
Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2001182
16 April 2003
Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1774692
13 February 2003
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1744188
8 April 2002
Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1602166
1 February 2001
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1457873
16 February 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1437666
1 November 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 434322
30 September 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 29572
21 April 1999
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 790825
8 February 1999
Initial Construction-Excluding Oversight · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1416769
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 19 May 2021
Resolved
Cargo pump relief valves shall be tested at least once each year. Safety relief valve has not been tested annually. Provide certification of an annual test to attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 May 2021
Resolution: Cargo pump relieve valve was tested. Report was provided.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 19 May 2021
Resolved
Cargo pump pressure gage shall be tested at least once a year. Cargo pump pressure gage was not tested annually. Provide certification of an annual test to the attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 May 2021
Resolution: Cargo pump pressure gauge was tested. Report was provided.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 19 May 2021
Resolved
Gears, couplings, flywheels, and all machinery capable of injuring personnel shall be provided with adequate covers or guards. The bottom side of the drive shaft for the cargo pump engine is exposed and high enough to create a hazard to personnel. Add a cover or guard on the entire underside of the drive shaft adequate to prevent personnel from contacting rotating parts to the satisfaction of the attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 May 2021
Resolution: A guard was placed underside of the drive shaft.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 19 May 2021
Resolved
Gears, couplings, flywheels, and all machinery capable of injuring personnel shall be provided with adequate covers or guards. The belts on the cargo pump engine were exposed creating a hazard to personnel. Add an adequate cover or guard to prevent personnel from contacting rotating belts to the satisfaction of the attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 May 2021
Resolution: A guard was replaced around the rotating belts.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 19 May 2021
Resolved
Each non-rising stem valve must be fitted with an indicator to show whether the valve is opened or closed. Supply and return valves on the cargo pump engine did not indicate whether the valves were opened or closed. Renew valves with either rising stem, ball valves, or other equivalent to the satisfaction of the attending USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 June 2021
Resolved 24 May 2021
Resolution: Valves were replaced with ball valves.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 19 May 2021
Resolved
Each hose must be marked with the name of the product for which the hose may be used or "OIL SERVICE", the Maximum Allowable Working Pressure (MAWP) and date of manufacture. All hoses found on board the SMITTY 18 were no marked as required. Mark cargo hoses as required to the satisfaction of the attending USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 24 May 2021
Resolution: 05 new hoses were purchased and placed on the barge. Hoses were marked properly amd tested. Proper documentaion attesting to the tests of the hoses was provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2021
Resolved
Main and auxiliary machinery and piping systems shall conform to Subchapter F of this chapter. An exhaust leak was found on the cargo pump engine. Repair or replace equipment as needed to prevent exhaust leakage to the satisfaction of the attending USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 24 May 2021
Resolution: The engine below were replaced. Witnessed satisfactory test of the cargo pump engine. No exhaust leaks were detected.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 19 May 2021
Resolved
Each valve shall be legibly marked with USCG approval number. The P/V valve on the cargo venting system was not marker with the approval number (Q-Spec). Mark the P/V valve as appropriate to the satisfaction of the attending USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 2 June 2021
Resolution: Received photograph of the PV stamped with the Coast Guard approval number.
Construction/Loadline › Hull › Side Shell
Issued 26 February 2016
Resolved
3 in X 2 in puncture port side at 6 ft draft line
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 March 2016
Resolved 28 February 2016
Resolution: Repairs completed & verified.
Construction/Loadline › Hull › Hull Plating
Issued 23 March 2015
Resolved
Vessel suffered a 26 foot long by 10 inch deep inset on the gunwhale on the #5 and #6 port wing voids. Vessel givien a PTP to Sector Mobile to discharge and affect repairs.
Action required: 705 - Other - as specified
Due 4 April 2015
Resolved 21 April 2015
Resolution: Cropped and renewed area with new steel plating. Soap and blow testing was conducted all new welds and repairs were found to be in satisfactory condition.
Construction/Loadline › Hull › Hull Plating
Issued 23 March 2015
Resolved
Vessl suffered an inset to the #6 port wing void approx 15 inches long by 4 inches deep on the gun whale. Crop and replace to the satisfaction of the attending MI.
Action required: 705 - Other - as specified
Due 4 April 2015
Resolved 21 April 2015
Resolution: Cropped and renewed area with new steel plating. Soap and blow testing was conducted all new welds and repairs were found to be in satisfactory condition.
Deck/Cargo › Towing › Chocks
Issued 23 March 2015
Resolved
Cleat on #6 port wing void damaged.
Action required: 705 - Other - as specified
Due 4 April 2015
Resolved 21 April 2015
Construction/Loadline › Hull › Hull Plating
Issued 9 March 2010
Resolved
Due to the events of 09Mar2010 that resulted in a hole above the waterline, the barge is allowed to offload all cargo at the L&L Dock in Venice. Upon completion of offloading, notify the DMI of the barge condition and intended repair yard.
Prior to conducting additional cargo operations, the barge along with a repair proposal must be presented for review/approval prior to affecting repairs.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 March 2010
Resolution: Repair to damaged area was completed. Conducted satisfactory air test.
Construction/Loadline › Hull › Double Hull
Issued 6 February 2010
Resolved
After lighterning vsl at LNL Docks 15, 16, & 17 in Port Fourchon, LA, proceed to shipyard for repairs of headlog damage that occured on 06FEB2010
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2010
Resolved 24 February 2010
Resolution: Conducted satisfactory visual inspection and air test of 4''x3'' insert on port side headlog and 2''x6'' insert of bottom plate on rake slope below headlog insert.
Operations/Management › Casualty Reporting/Post-Casualty Actions › Notice of Marine Casualty
Issued 24 March 2006
Resolved
As a result of the collision with the M/V TEXAS GAL on 23MAR06 and resultant damage, the vessel is directed to the ASCO dock to offload all cargo and all diesel from the cargo pump fuel tank resevior. Following CG inspection to validate vessel's seaworthiness, the vessel may proceed to a drydock located in [name withheld] area of responsibility to effect permanent repairs.
Action required: 705 - Other - as specified
Due 24 March 2006
Resolved 2 June 2006
Resolution: Vessel currently in drydock at Elmwood Shipyard in New Orleans'' AOR.
Construction/Loadline › Hull › Hull Plating
Issued 24 March 2006
Resolved
Gas-free vessel and effect permanent repairs to the stern void and #7 starboard void compartments. Repairs shall be made to the satisfaction of a CG Marine Inspector.
Action required: 705 - Other - as specified
Due 24 March 2006
Resolved 9 June 2006
Resolution: All repairs made and air test conducted to the satisfactory of attending MI''s.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 24 March 2006
Resolved
Gas-free cargo pump engine diesel fuel reservoir and effect permanent repairs to pinhole fracture in weld in way of tank-deck plating junction. Repairs shall be made to the satisfaction of a CG Marine Inspector.
Action required: 705 - Other - as specified
Due 24 March 2006
Resolved 9 June 2006
Resolution: Satisfactory repairs made and air test conducted to the satisfactory of attending MI''s.
Construction/Loadline › Hull › Side Shell
Issued 18 January 2006
Resolved
Sharp set-in port side #1 wing void near gunwale.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 February 2006
Resolution: Conducted visual inspection and air test on port side # 1 wing void gunwale. Inspection and air test satisfactory.
Construction/Loadline › Hull › Side Shell
Issued 18 January 2006
Resolved
Smooth set-in port side #5 wing void on gunwale.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 February 2006
Resolution: Conducted visual inspection and air test on port side # 5 wing void gunwale. Inspection and air test satisfactory.
Engineering › Diesel Engine (auxiliary)
Issued 29 March 2004
Resolved
Fix leaking fuel line.
Due 29 March 2004
Resolved 29 March 2004
Resolution: Leak corrected same day by mechanic.
Pollution Prevention/Response › Response Equipment
Issued 29 March 2004
Resolved
Barge is equiped with large aluminum containers with a hinged lid. Hinges were fractured but lid could still be removed if need be. Notified barge rep, he said he would fix them as soon as possible. LEGACY COMPONENT DESC: Containers
Due 29 March 2004
Resolved 29 March 2004
Resolution: Good repore w/ barge rep. No cg-835 issued.
Construction/Loadline › Hull
Issued 13 February 2003
Resolved
While vsl was docking, the barge struck an object that puntured the side shell. LEGACY COMPONENT DESC: Side Shell
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 13 February 2003
Resolution: Side shell was cut out and replaced.
Deck/Cargo › Vapor Control Systems
Issued 13 February 2003
Resolved
Vapor connections not properly marked. LEGACY COMPONENT DESC: Piping/Hoses
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 February 2003
Resolved 24 February 2003
Resolution: Company painted correct wording on piping.