Records from 2002 to 2026. Most recent: inspection, 20 May 2026.
Inspection history · 60
20 May 2026
Administrative Inspection · In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8377035
11 January 2026
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8294415
11 January 2026
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8296292
2 October 2025
Administrative Inspection · Deficiency Check · In-Service Inspection · Annual Inspection · ACP Annual Oversight
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8245213
23 June 2025
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8165468
9 June 2025
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8156726
18 May 2025
Bulk Liquid Transfer Monitor
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8138494
15 February 2025
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8079996
15 January 2025
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8063919
15 January 2025
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8077824
4 December 2024
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8042935
18 September 2024
Annual Inspection · Administrative Inspection · Deficiency Check · ACP Annual Oversight
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8005221
26 July 2024
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7967393
18 June 2024
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7937913
22 March 2024
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7883326
22 March 2024
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7884493
6 January 2024
Administrative Inspection · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7845846
19 November 2023
Administrative Inspection · Deficiency Check · Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7827058
19 November 2023
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7827431
2 November 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7821287
7 September 2023
ACP Annual Oversight · Administrative Inspection · In-Service Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7787309
27 January 2023
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7627917
7 January 2023
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7617999
1 January 2023
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7615078
24 December 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7612841
1 December 2022
MTSA/ISPS Verification · Administrative Inspection · ACP COI Oversight · ACP Additional Oversight – Risk Assessment · Re-Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7602933
28 November 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7600692
28 November 2022
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7607803
6 October 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7577395
11 May 2022
Annual Inspection · ACP Annual Oversight · Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7442593
12 March 2022
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7410553
12 March 2022
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7625794
11 March 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7410031
22 February 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7399595
8 September 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7307509
16 May 2021
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7198013
10 March 2021
Periodic Inspection · ACP Periodic Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7180477
16 June 2020
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6993404
2 June 2020
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6966195
3 February 2020
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6901424
5 December 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6867824
10 June 2019
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6709739
16 April 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6663674
22 January 2019
ACP Annual Oversight · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6613615
2 November 2018
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6579794
18 October 2018
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6563508
4 June 2018
Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6433934
6 April 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6386552
20 March 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6375078
19 December 2017
Administrative Inspection · ACP COI Oversight · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6327885
16 March 2017
MTSA/ISPS Verification · Annual Inspection · ACP Annual Oversight
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6122256
22 December 2016
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6061851
15 August 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5973353
7 June 2016
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5936866
3 May 2016
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5867904
29 April 2016
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5868705
28 April 2016
In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5864992
28 April 2016
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5874755
1 April 2016
Type not recorded
No type recorded · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 5845296
23 March 2016
MTSA/ISPS Verification · ACP Annual Oversight
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5838752
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 20 May 2026
Resolved
The master, owner, operator, agent, or person in charge
of a vessel equipped with ballast tanks that operates in
the waters of the United States must employ one of the
following ballast water management methods: (1) Install
and operate a ballast water management system (BWMS)that
has been approved by the Coast Guard under 46 CFR part
162.
Received report that BWTS was not operational due to a
defective power supply.
Provide copy of class report attesting that the BWTS is
fully operation once repairs have been made.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 May 2026
Resolution: Received ABS Report 7643308-A, stating they verifed the repair and witnessed operation test; found satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 January 2026
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel reported a loss of propulsion during outbound transit. Vessel must enact permanent repairs to the satisfaction of ABS.
74SOLAS20 I/11 (a)
Action required: 60 - Rectify deficiencies prior to movement
Due 11 January 2026
Resolved 11 January 2026
Resolution: Received Preliminary Report from ABS Clearing Deficiency.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 2 October 2025
Resolved
Fire extinguishing appliances shall be kept in good order and available for immediate use at all times during the voyage.
Marine Inspectors observed CO2 system for paint locker inoperable.
A report from the vessel's classification society attesting to the proper operation of the system is required to clear this deficiency.
74SOLAS II-2/15
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 October 2025
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 2 October 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations and ensure that the ship in all respects will remain fit to proceed to sea without danger to ship or persons on board.
Marine Inspectors observed damage to A-60 boundary (overhead) in inert gas room following installation of new inert gas system.
74SOLAS(20) I/11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2025
Resolved 3 October 2025
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 2 October 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations and ensure that the ship in all respects will remain fit to proceed to sea without danger to ship or persons on board.
Marine Inspectors observed inoperable pressure sensor on cargo tank 5C.
74SOLAS(20) I/11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2025
Resolved 3 October 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 January 2025
Resolved
Main and auxiliary machinery essential for the propulsion and safety of the ship shall be provided effective means for its operation and control.
During mooring the vessel was unable to be placed in astern propulsion. Troubleshoot and repair to the satisfaction of the RO.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 15 January 2025
Resolved 17 January 2025
Resolution: Received ABS Preliminary report stating repairs have been made and satisfactorily tested.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 18 September 2024
Resolved
The main inlets and outlets of all ventilation systems shall be capable of being closed from outside the space ventilated.
Battery room supply and exhaust dampers inoperable, EGL #3 ventilation damper/closure inoperable.
74SOLAS II-2/Reg 25(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2024
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 18 September 2024
Resolved
The construction of all doors and door frames in “A” class divisions shall provide resistance to fire and as well as the passage of smoke and flame equivalent of the bulkheads of which the doors are situated.
Crew laundry room door found with temporary repairs and holed in multiple places, self-closing function unable to close door without assistance.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2024
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 18 September 2024
Resolved
Ducts not less than .075 square meters in sectional area shall be constructed of steel or equivalent material.
Supply and exhaust ventilation ducts for paint locker adjacent to steering gear room holed/wasted. Ventilation ducting in incinerator room holed/wasted in multiple areas.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 18 September 2024
Resolved
The normal equipment of every lifeboat shall consist of:
(xii) a food ration, determined by administration, for each person the lifeboat is certified to carry.
Multiple food rations in both lifeboats found unsealed.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2024
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 18 September 2024
Resolved
The maintenance of the ship and its equipment shall be maintained to conform with the provisions of present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
Multiple pressure/vacuum valve bodies found wasted or cracked.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 March 2024
Resolved
All marine engineering details, such as boilers, pressure vessels, main and auxiliary machinery, piping, valves, and fittings, shall be designed, constructed, and installed in accordance with the provisions of this sub chapter.
While leaving the pier under tug assist, vessel lost propulsion.
Vessel is required to submit class/ABS report attesting to the cause of the propulsion loss, sat operational test, and repairs made to the main engine prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Due 22 March 2024
Resolved 22 March 2024
Resolution: Received ABS/class report attesting to the repairs and testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 November 2023
Resolved
Vessel reported a loss of propulsion due to a leak on the starting air cylinder on air starting system. Provide report from recognized organization providing analysis of the cause of failure and statement regarding fitness for service. Report from RO is due prior to departure of the vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 November 2023
Resolution: Received class report from ABS attestiong to satisfactory repairs and vessel is fit for service.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 13 September 2023
Resolved
Prior to carrying cargoes and operations that require IG - The inert gas system…shall satisfy the following condition:…alarms shall be provided to indicate: low water pressure to the scrubber, and automatic shut-downs of the system... The Inert Gas System (IGS) did not alarm or shut-down while conducting low water pressure test. Identify cause and repair or replace as necessary to ensure parameters are operational as required.
74 SOLAS (UnAmend) II-2/62(o)(v)
Condition: Invalid
Action required: 705 - Other - as specified
Due 13 November 2023
Resolved 25 September 2023
Resolution: Accepted as condition of ACS (ABS) Work Order 6042623
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 13 September 2023
Resolved
Where the cables are neither sheathed nor armoured and there might be a risk of fire in the event of an electrical fault, precautions shall be required by the Administration. Deck air pressure rcvr in the Aft Bosn Locker has an electrical condensate drain solenoid with a temp conductor (Extension cord plug connection).Remove or replace with approved wiring to eliminate hazard.
74 SOLAS (UnAmend) II-1/27(a)(iv)(2)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2023
Resolved 25 September 2023
Resolution: Accepted as condition of ACS (ABS) Work Order 6042623
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 13 September 2023
Resolved
Except in cargo spaces, ventilation ducts shall be constructed of the following materials: (i) Ducts not less than 0.075 square meters…shall be constructed of steel or other equivalent material. Bosn Locker vent screen is wasted in vicinity of port access door. Repair
74 SOLAS (UnAmend) II-2/25(d)(i)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2023
Resolved 25 September 2023
Resolution: Accepted as condition of ACS (ABS) Work Order 6042623
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 13 September 2023
Resolved
After any survey…no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. Stowage of spare 12-inch by 6-foot lengths of pipes in the overhead are strapped to permanently installed piping system secured to forward bulkhead in the Bosn Locker. Identify a safer means of securing and stowing spare pipes and implement procedure.
74 SOLAS (UnAmend) I/11
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2023
Resolved 25 September 2023
Resolution: Accepted as condition of ACS (ABS) Work Order 6042623
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 13 September 2023
Resolved
The hull, machinery and equipment…of a cargo ship shall be surveyed…to ensure that the arrangements, material, and scantlings…are in all respects satisfactory for the service for which the ship is intended. Deck air pressure receiver in Bosn Locker has a broken gauge and not accurately reading current pressure. Repair or replace to ensure accurate reading.
74 SOLAS (UnAmend) I/10
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2023
Resolved 25 September 2023
Resolution: Accepted as condition of ACS (ABS) Work Order 6042623
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 13 September 2023
Resolved
The hull, machinery and equipment…of a cargo ship shall be surveyed…to ensure that the arrangements, material, and scantlings…are in all respects satisfactory for the service for which the ship is intended. Relief valve on deck air pressure vessel does not have information to confirm current accurate setting or operation. Repair or replace and provide documentation to ensure proper testing and operation.
74 SOLAS (UnAmend) I/10
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2023
Resolved 25 September 2023
Resolution: Accepted as condition of ACS (ABS) Work Order 6042623
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 September 2023
Resolved
Each separate circuit shall be protected against short circuit…Two 220 volt-Panels with Ground Detection in the galley indicated possible ground fault. Identify cause and repair or replace equipment accordingly.
74 SOLAS (UnAmend) II-1 27(a)(vii)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2023
Resolved 25 September 2023
Resolution: Accepted as condition of ACS (ABS) Work Order 6042623
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 May 2022
Resolved
74 SOLAS (Unamended) II-2/15
50 A
In all new and existing ships, fire extinguishing appliances shall be kept in good working and available for immediate use at all times during the voyage. The Port Bow fire hydrant (#39) valve was seized closed during the test of the fire hydrants and hoses.
Action required: 10 - Deficiency Rectified
Due 11 May 2022
Resolved 11 May 2022
Resolution: Crew was able to open the seized valve.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 11 May 2022
Resolved
74 SOLAS (Unamended)
II-2/ 15
50 A
In all new and existing ships, fire-extinguishing appliances shall be kept in good order and available for immediate use at all times during the voyage. Identified Semi-portable CO2 fire extinguisher with hose reel located at the boiler flat has not been serviced since April of 2021.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 27 May 2022
Resolution: Received ABS finding number.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 11 May 2022
Resolved
74 SOLAS (Unamended)
II-2/ 37 (d)
50 A
The construction of all doors and door frames in "A" Class Divisions, with the means of securing the door when closed, shall provide resistance to fire as well as to the passage of smoke and flame as far as practicable equivalent to that of the bulkheads in which the doors are situated.
MI identified Class A door leading to engineroom would not latch properly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 27 May 2022
Resolution: Received ABS finding number.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 11 May 2022
Resolved
74 SOLAS (Unamended)
II-2/ 15
50 A
In all new and existing ships, fire-extinguishing appliances shall be kept in good order and available for immediate use at all times during the voyage.
Identified 80% of the fixed CO2 system bottles missing safety caps in the CO2 room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 27 May 2022
Resolution: Received ABS finding number.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022
Resolved
74 SOLAS (Unamended)
II-1/ 27 (a)(i)(1)
50 A
All electrical apparatus shall be so constructed and so installed that danger of injury in ordinary handling shall not exist. MI observed open ports on the backside of the ECR main console.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 27 May 2022
Resolution: Received ABS finding number
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 May 2022
Resolved
74 SOLAS (20) I/Reg. 11.a
50 A
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Identified two jacket water leaks on the emergency diesel generator on the manifold outlet.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 27 May 2022
Resolution: Received ABs finding number.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 11 May 2022
Resolved
74SOLAS(20)I/11.b
50 A
After any survey of the ship under regulations 7, 8, 9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the Administration. Ship’s inert gas system is not operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 27 May 2022
Resolution: Received ABS finding number
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 February 2022
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE
MAINTAINED TO ENSURE IT REMAINS FIT FOR SEA. THE
HYDRAULIC SYSTEM SERVING THE MOORING WINCHES AND ANCHOR
WINDLASS EXPERIENCED A FAILURE. PROVIDE REPORT FROM
RECOGNIZED ORGANIZATION PROVIDING ANALYSIS OF THE CAUSE
OF FAILURE AND STATEMENT REGARDING FITNESS FOR SERVICE.
REPORT FROM RO IS DUE PRIOR TO THE MOVEMENT OF THE
VESSEL.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 February 2020
Resolved
During the ACP annual inspection the vessel was unable to energize and prove operation of the vessel's IG system. The vessel shall prove operation to Class prior to use for vessel operations. 74 SOLAS II-2, 62
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 February 2020
Resolved 4 February 2020
Resolution: ABS issued a Condition of Class.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 February 2020
Resolved
The vessel was unable to demonstrat e the over-speed shut-down on the #3 SSDG. The engine showed an alarm at 816 RPM but upon tripping as an over-speed, the engine did not illlmediately shut-down. The vessel shall prove a satisfactory test of the SSDG over~speed t o Class. ABS Steel Rules (80) 35 . 21.2 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 February 2020
Resolved 4 February 2020
Resolution: ABS issued a Condition of Class.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 December 2019
Resolved
The vessel reported a loss of propulsion while transiting to berth. Stuck control air valve identified as cause of loss of propulsion. Make repairs and verify operation of main engine prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Due 5 December 2019
Resolved 5 December 2019
Resolution: See attached ABS report.
Engineering › Engine Controls (Electric/Electronic) › Actuator
Issued 22 December 2016
Resolved
Prove proper operation of Bridge engine control to satisfaction of class (ABS).
Action required: 705 - Other - as specified
Resolved 23 December 2016