Records from 2002 to 2025. Most recent: inspection, 11 March 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · MADISONVILLE, LA, UNITED STATES · built 2002
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 15 January 2026 · expires 28 February 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 32
11 March 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8093345
3 February 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7634523
6 September 2022
COI Inspection · Drydock Exam · Cargo Tank Internal · Examination of Repairs · MTSA Verification · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7534608
5 August 2021
Bulk Liquid Transfer Monitor
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7277738
6 January 2021
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7117709
12 January 2020
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6888726
8 January 2020
Administrative Inspection · Periodic Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6885337
7 January 2019
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6605069
4 December 2017
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6317474
4 October 2016
MTSA Verification · Internal Structural Exam · Examination of Repairs · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6014651
21 March 2016
Examination of Repairs · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5834653
24 March 2015
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5090208
19 March 2015
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5087038
20 May 2014
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4872123
10 December 2013
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4766234
27 July 2013
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4668002
29 March 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4274721
8 December 2011
Cargo Tank Internal · Drydock Exam · COI Inspection · MTSA Verification · Examination of Repairs · Administrative Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4196785
1 February 2011
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3937375
23 November 2010
Periodic Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3894052
21 September 2009
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3599715
29 September 2008
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3334620
31 August 2007
MTSA Verification · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3042035
19 February 2007
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2874228
18 February 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2875900
2 November 2006
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2811421
14 November 2005
MTSA Verification · Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2531514
18 May 2005
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2383696
20 November 2004
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2244837
29 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1979076
10 November 2003
Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1946417
30 August 2002
Internal Structural Exam · Hull Examination · Cargo Tank Internal · Initial Certification · Initial Construction-Excluding Oversight
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1666935
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 9 January 2020
Resolved
Emergency shutdown for cargo pump prime mover shall be located at the midpoint or 100ft, whichever is more practical. Prime mover failed to shutdown when cable is pulled. Vessel shall repair/replace prior to any cargo discharge operations to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 January 2020
Resolved 12 January 2020
Resolution: Received technician report from third party, Davis Diesel, for successful repair and testing of emergency shut-down.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 19 March 2015
Resolved
Pin Holes were discovered in #1P and #1S cargo trunk in way of closed gauging sight glass. Vessel must make temp repairs. Vessel is authorized to proceed to Lake Charles to discharge cargo. Vessel must make premanent repairs to the satisfaction of the attending CG Marine Inspector. 46CFR32.60-1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 24 March 2015
Resolution: Witnessed successfult air test on Cargo Tanks with no deficiencies noted. Gaskets were replaced in sight glasses and new packing installed on hatches and in valves.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 19 March 2015
Resolved
Gasket material/glass wiper in #1P cargo tank closed guaging sight glass is leaking. Vessel must make permanent repairs to the satisfaction of the attending CG Marine Inspector. 46CFR32.60-1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 24 March 2015
Resolution: Witnessed successfult air test on Cargo Tanks with no deficiencies noted. Gaskets were replaced in sight glasses and new packing installed on hatches and in valves.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 19 February 2007
Resolved
Collision Bulkhead IWO #1 Port Wing Void and Rake Void was found buckled during a topside walk and damage survey. Damage was not related to grounding. Damage had been labeled on bulkhead since 2004. With no penetrations or fractures, IWO hull, bulkhead, or cargo tank, & trip brackets remained intact, repairs are to be made at next scheduled ISE.
Action required: 705 - Other - as specified
Due 30 August 2007
Resolved 31 August 2007
Resolution: Witnessed satisfactory repair to fwd bulkhead of #1 port wing void during ISE.