Records from 2002 to 2023. Most recent: inspection, 20 May 2023.
Documentation record
Registered dimensions (L × B × D)240.0 ft × 42.0 ft × 12.0 ft
Registered tonnagegross 1,016 / net 1,016
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · MADISONVILLE, LA, UNITED STATES · built 2002
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 16 September 2025 · expires 30 September 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1016 - Simplified, Gross Ton
1016 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 39
20 May 2023
Administrative Inspection · Deficiency Check · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7692906
28 June 2022
Internal Structural Exam · Drydock Exam · Cargo Tank Internal · Administrative Inspection · COI Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7489473
2 June 2017
COI Inspection · Examination of Repairs · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6163528
8 July 2016
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5934024
29 June 2016
Administrative Inspection · Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5924488
3 May 2016
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5868227
13 July 2015
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5178801
7 July 2015
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5176899
23 April 2015
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5106783
12 May 2014
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4853214
9 March 2014
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4813132
31 May 2012
Drydock Exam · COI Inspection · Internal Structural Exam · MTSA Verification · Cargo Tank Internal
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4329512
11 April 2012
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4284777
11 April 2012
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4286007
28 March 2012
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4274408
19 January 2012
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4227613
19 January 2012
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4228763
30 September 2011
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4156214
12 August 2010
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3822061
11 August 2010
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3822093
6 August 2010
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3819714
22 August 2008
MTSA Verification · Annual Inspection · Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3305890
21 August 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3305057
20 August 2008
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3305072
28 May 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3226531
15 May 2008
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3207239
1 May 2008
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3197375
28 September 2007
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3068228
11 June 2007
Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2958430
12 January 2007
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2854851
2 November 2006
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2815496
23 October 2006
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2806632
1 November 2005
Periodic Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2526204
14 April 2005
MTSA Verification
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2334003
5 November 2004
MTSA Verification · Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2235476
5 March 2004
Administrative Inspection
Administrative · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2020432
12 December 2003
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1962056
8 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1961033
23 October 2002
Initial Certification · Internal Structural Exam · Cargo Tank Internal · Hull Examination · Construction Oversight
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1693360
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 20 May 2023
Resolved
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society.
While fleeted at Pelican Fleet in Houston, TX, the CBC 7032 sustained damage to the cargo tank top from a collision with the CBC 7031 resulting in a 1.5" x 14" x 18" inset on the raised trunk of 3S Cargo tank. The vessel is authorized a one time discharge and shall proceed directly to a cleaning and repair facility to make permanent repairs. The repairs shall be made to the satisfaction of a Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 June 2023
Resolution: Company cropped and renewed 30" x 3'-0" x 3/8" portion of shaped coaming. Conducted a visual exam of all repairs and witnessed air test at 1.0 PSI. Test satisfactory.
Construction/Loadline › Hull › Side Shell
Issued 29 June 2016
Resolved
Vessel is authorized one time discharge of cargo within the Houston COTP zone prior to permanent repairs to the fractures and insets in the #2, 3, and 4 port wing voids.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 July 2016
Resolved 8 July 2016
Resolution: Coast Guard Sector Houston Galveston witnessed repairs to the fractures and insets in the #2, #3, and #4 port wing voids to the satisfaction of the attending marine inspectors.
Construction/Loadline › Hull › Weld
Issued 20 August 2008
Resolved
O/O could not verify structural integrity of starboard stern void after marine casualty.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 August 2008