MAURY USCG vessel records Sign in
← All vessels

BOSTONIAN

BOSTONIAN is a 2003 passenger vessel (inspected). The Coast Guard has recorded 51 inspections since 2003, most recently in June 2025, along with 100 deficiencies — 1 with no resolution recorded — and 10 casualty investigations between 2004 and 2008.

Records from 2003 to 2025. Most recent: inspection, 3 June 2025.

Built
2003
Last inspected
3 June 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDQ3256
638240
Flag
UNITED STATES
367591960, 368415140
Maury page id
psix-638240

Inspections, by type

…with no type recorded14
…past their stated due date1
Years with a record 19 calendar years (2003–2025)
The 51 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)53.3 ft × 18.7 ft × 8.5 ft
Registered tonnagegross 33 / net 26
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDERECKTOR SHIPYARDS CONN LLC · BRIDGEPORT, CT, UNITED STATES · built 2003
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationTwin Hull
Hailing portBOSTON, MA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 27 March 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it33 - Simplified, Gross Ton
26 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDQ3256MMSI 368415140 · active · compulsorily equipped · granted 22 April 2025, expires 22 April 2035
WDP8113MMSI 367591960 · active · compulsorily equipped · granted 17 September 2024, expires 17 September 2034 · licensed under a name not among this hull’s recorded names (not shown)
WDB4849MMSI 366903060 · expired · compulsorily equipped · granted 26 July 2003, cancelled 28 September 2013
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 6

Inspection history · 51

3 June 2025 COI Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8148146
8 April 2025 Hull Examination · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8104968
12 September 2024 Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8000667
6 September 2023 Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7785845
9 June 2023 Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7709892
4 October 2022 Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7571047
19 October 2021 Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7335672
17 June 2021 Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7255084
9 December 2020 Administrative Inspection · Plan Review "T" Boat · COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7108795
27 June 2019 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6731987
17 April 2017 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6126442
8 October 2015 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5738265
3 August 2015 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5204819
28 October 2014 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5013361
10 July 2012 Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4389306
1 September 2011 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4137580
29 September 2010 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3859637
6 October 2008 Damage Survey · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3339417
5 October 2008 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3339336
4 August 2008 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3288733
1 November 2007 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3093826
28 June 2007 Plan Review "T" Boat
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2976577
20 July 2006 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2725527
13 July 2006 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2711837
13 July 2006 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2715832
23 May 2006 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2657191
10 May 2006 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2665868
10 May 2006 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2716090
9 February 2006 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2582283
9 February 2006 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2582332
6 December 2005 Plan Review "T" Boat · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2553982
22 November 2005 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2539528
22 November 2005 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2547674
11 November 2005 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2532821
18 August 2005 Deficiency Check · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 2466961
8 August 2005 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2455888
5 August 2005 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2452382
27 July 2005 Annual Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2441519
19 July 2005 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2432423
5 May 2005 Plan Review "T" Boat
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2349799
28 March 2005 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2322057
19 November 2004 Damage Survey · In-Service Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2244790
19 November 2004 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2245883
10 November 2004 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2238867
20 September 2004 Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2200012
29 August 2004 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2180843
29 June 2004 Internal Structural Exam · Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 2115290
19 December 2003 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1967299
19 December 2003 Deficiency Check · Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1968014
13 August 2003 Deficiency Check · In-Service Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1874768
13 March 2003 Construction Oversight · Initial Certification
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1756750

Deficiency record · 100

07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 June 2025 No resolution recorded
Controls and valves for operation of fixed gas fire extinguishing system must be located outside the space protected by the system. The is a pressure control switches for machinery shutdown and ventilation closures are located inside the engine rooms. Relocate the pressure switch outside the protected space no later then 31DEC2025, to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 31 December 2025 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 3 June 2025 Resolved
For each alternating current generator, a means for measuring frequency must also be provided. There is no frequency meter for the generator. Install one to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 June 2025
Resolved 4 June 2025
Resolution: Operator installed a frequency meter
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 June 2025 Resolved
The frame or support of each semi-portable fire extinguisher permitted by paragraph (a) of this section must be welded or otherwise permanently attached to a bulkhead or deck. The support for a fire extinguisher in the main deck passenger compartment is broken, repair/replace bracket to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 June 2025
Resolved 4 June 2025
Resolution: Operator replaced fire extinguisher bracket
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 12 September 2024 Resolved
Complete but simple instructions for the operation of a fixed gas fire extinguishing system must be located in a conspicuous place at or near each pull box and stop valve control and in the space where the extinguishing agent cylinders are stored. If the storage cylinders are separate from the protected space, the instructions must also include a schematic diagram of the system and instructions detailing alternate methods of releasing the extinguishing agent should the local manual release or stop valve controls fail to operate... MI Observed missing instructions and schematic diagram for fixed gas extinguishing system.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 September 2024
Resolved 29 January 2025
Resolution: vessel rep provided email with picture evidence of instructions.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 12 September 2024 Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level...MI identified bilge high level alarm system to be inoperable.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 September 2024
Resolved 16 September 2024
Resolution: Vessel crew identified loose wiring connection within bilge level alarm display panel. Vessel crew secured connection resulting in full system operation.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 9 December 2020 Resolved
46 CFR 184.610 (a) each vessel must be equipped with a public address system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 December 2020
Resolved 2 April 2021
Resolution: Recieved video from vessel operator clearing deficiency.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 December 2020 Resolved
46 CFR 185.602 VSL did not have hull markings applied awaiting paint job.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 December 2020
Resolved 2 April 2021
Resolution: Marine inspector attending homeport of vessel witnessed satisfactory markings afixed to the vessel.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 December 2020 Resolved
46 CFR 183.340 (4) Cable and wiring be installed with metal supports spaced not more than 24 inches apart.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2020
Resolved 26 February 2021
Resolution: Vessel opeator provided pictures of repairs.
Construction/Loadline › Penetrations › Valve Flange
Issued 10 July 2012 Resolved
PF01 - Repair or replace starboard side keel cooler valve as discussed. Prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 1 August 2012
Resolution: Vessel replaced starboard side keel cooler valve.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 6 October 2008 Resolved
Provide technician's report for steering gear system. **PTCP**
Action required: 705 - Other - as specified
Resolved 8 October 2008
Resolution: Report received by Sec NY on 08OCT08.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 6 October 2008 Resolved
Make vessel available for sea trials in the presence of a Marine Inspector prior to carrying passengers. **PTCP**
Action required: 705 - Other - as specified
Resolved 8 October 2008
Resolution: Attending Marine Inspectors witnessed satisfactory operation of vessel''s steering gear system.
Lifesaving › Lifebuoys › Serviceable
Issued 1 November 2007 Resolved
Make lifebuoy's light float line 3-6 feet long.
Action required: 705 - Other - as specified
Due 15 November 2007
Resolved 5 November 2007
Engineering › Bilge Water Management System › Pump
Issued 1 November 2007 Resolved
Provide for portable bilge pump in way of void space foward of collision bulkhead in accordance with 46 CFR 182.510(a).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 November 2007
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 1 November 2007 Resolved
Provide for (lazertte space) bonding strap in way of fuel fill.
Action required: 705 - Other - as specified
Due 15 November 2007
Resolved 5 November 2007
Stability › Watertight Integrity › General
Issued 1 November 2007 Resolved
Repair exposed hole in way of 2/3 void space water tight bulkhead.
Action required: 705 - Other - as specified
Due 15 November 2007
Resolved 5 November 2007
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 1 November 2007 Resolved
Provide proof of servicing of expired hydrostatic release in way of the inflatable liferafts. Vessel is restricted to rivers routes until expired hydrostatic release is corrected.
Action required: 705 - Other - as specified
Due 1 December 2007
Resolved 6 November 2007
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (hydraulic)
Issued 13 July 2006 Resolved
Vsl reported loss of stbd main engine while transiting.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 July 2006
Construction/Loadline › Hull › Bottom Plating
Issued 13 July 2006 Resolved
Vsl lost propulsion while transiting. Conduct sea trials to the sat of the attending CG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 July 2006
Engineering › Steering Gear System › Valve
Issued 10 May 2006 Resolved
Prove proper operation of vsl's steering system. Provide tech report and analysis of cause of casualty. Conduct sea trials to the sat of the attending CG MI.
Action required: 705 - Other - as specified
Resolved 11 May 2006
Resolution: eceived documentation attesting to the sat completion of all defs. According to tech report, the steering gear / potentiometer assembly had fallen away from the tiller resulting in a loss of steering. The entire unit was removed and replaced, and the b
Operations/Management › Drills/Instruction › Not Conducted
Issued 9 February 2006 Resolved
Conduct sea trials to the satisfaction of the attending CG MI.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 February 2006
Resolution: Received copy of tech report, and casual analysis from Engineer on Duty and Port Captain of NYWT. The cause of the split rudders was due to a faulty potentiometer. This piece of equipment was replaced and the vsl was sea trialed.
Engineering › Steering Gear System › Rudder
Issued 9 February 2006 Resolved
Make repairs to any damaged sections of steering system to the satisfaction of the attending CG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 February 2006
Resolution: Received copy of tech report, and casual analysis from Engineer on Duty and Port Captain of NYWT. The cause of the split rudders was due to a faulty potentiometer. This piece of equipment was replaced and the vsl was sea trialed.
Operations/Management › Casualty Reporting/Post-Casualty Actions › Report of Potential Vessel Casualty
Issued 9 February 2006 Resolved
Provide tech report explaining split rudder and reduction in steering reported on 09Feb06.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 February 2006
Resolution: Received copy of tech report, and casual analysis from Engineer on Duty and Port Captain of NYWT. The cause of the split rudders was due to a faulty potentiometer. This piece of equipment was replaced, and the vsl was sea trialed.
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 22 November 2005 Resolved
Vessel's starboard main engine blew a piston through the engine block. Vessel must make proper repairs and prove proper operation of starboard main engine to the satisfaction of an attending marine inspector prior to the carriage of passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 November 2005
Resolved 30 January 2006
Resolution: Vessel changed out engines at Derecktor''''s shipyard. Witnessed operational test of engine and conducted sea trails- all sat.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 22 November 2005 Resolved
Develop and implement preventative maintenence program.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 4 April 2006
Resolution: Company-wide program created for daily maintenance procedures.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 11 November 2005 Resolved
Make S/S ER ready for inspection.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2005
Resolution: Conducted satisfactory inspection of ER.
Engineering › Bilge Water Management System › Pump
Issued 11 November 2005 Resolved
Prove proper operation of bilge pump.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2005
Resolution: Sat operation.
Fire Fighting › Fire Pumps › Capacity
Issued 11 November 2005 Resolved
Prove proper operation of fire pump.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2005
Resolution: Fire pump sat. operation.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 11 November 2005 Resolved
Provide valid COD.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2005
Resolution: Provided.
Navigation › Piloting/Steering › US Coast Pilot
Issued 11 November 2005 Resolved
Provide updated nav pubs.
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Pubs updated.
Engineering › Bilge Water Management System › Hose
Issued 11 November 2005 Resolved
Provide serviceable hand pump w/ hose long enough to reach all spaces.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2005
Resolution: New pump hose provided.
Stability › Watertight Integrity › General
Issued 11 November 2005 Resolved
Make compartment behind bridge consol watertight.
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Watertight integrity verified.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 11 November 2005 Resolved
Clean oil out of ER bilge
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Cleaned.
Engineering › Lubricating Oil Service System › Inlet
Issued 11 November 2005 Resolved
Properly secure oil dip stick piping bracket in P/S ER.
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Secured.
Engineering › Sea-water System (primary cooling) › Piping
Issued 11 November 2005 Resolved
Replace raw water cooling hose on P/S engine.
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Replaced.
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 November 2005 Resolved
Properly secure tank sensor system box.
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Secured.
Construction/Loadline › Structures › Door
Issued 11 November 2005 Resolved
Make repairs to stbd cabin door closure
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Repaired.
Lifesaving › Hand Flares › Expired
Issued 11 November 2005 Resolved
Replace distress flares.
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Replaced.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 11 November 2005 Resolved
Rebolt rescue platform to deck railing on P/S, currently not bolted.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2005
Resolution: Secured.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 11 November 2005 Resolved
Make port ER exhaust piping available for inspection.
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Satisfactory inspection conducted.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 11 November 2005 Resolved
Investigate cause of coolant leak in P/S laz.
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: Coolant leak fixed.
Fire Fighting › Fire Hoses › Number
Issued 11 November 2005 Resolved
Provide validation of all fire hoses for all vsl.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2005
Resolution: Provided new fire hoses.
Stability › Watertight Integrity › General
Issued 11 November 2005 Resolved
Properly secure all hatches w/ securing devices exposed to weather deck.
Condition: Unknown
Due 17 November 2005
Resolved 21 November 2005
Resolution: New wires w/ permanent hooks installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 November 2005 Resolved
Properly reconnect bilge alarm in #2 void S/S.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2005
Resolution: Repaired.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 11 November 2005 Resolved
Develop and implement a Preventive Maintenance System.
Condition: Improper/Lack of Maintenance
Due 14 December 2005
Resolved 19 January 2006
Resolution: Moved to other case.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 18 August 2005 Resolved
Renew expired hydrostatic release on liferaft.
Condition: Improper/Lack of Maintenance
Due 19 August 2005
Resolved 30 January 2006
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 18 August 2005 Resolved
Replace & test missing local rudder angle indicator meter port side. Prove proper operation of port & stbd local indicators at controllers prior to operating with passengers.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 August 2005
Resolved 2 September 2005
Resolution: Corrected Same.
Documentation › Certificates/Documents › FCC SSL
Issued 27 July 2005 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 1 August 2005
Resolved 5 August 2005
Resolution: Received fax of valid Station License.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 27 July 2005 Resolved
Provide proof to USCG that nav pubs have been ordered- Coast Pilot [name withheld], Chart 1, Tides & Tidal Current Tables.
Condition: Unknown
Due 1 August 2005
Resolved 5 August 2005
Resolution: Faxed receipt of purchase.
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 November 2004 Resolved
Submit permanent repair proposal to the New York Officer in Charge, Marine Inspection (NY OCMI), regarding the fracture in the cooling water inlet elbow and subsequent water intrusion discovered in the starboard engine room.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 November 2004
Resolved 23 November 2004
Resolution: NY Water Taxi proposed to install stainless steel elbows, 3 of which had already been installed on the Mickey Murphy, [name withheld] and Curt Berger.
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 19 November 2004 Resolved
Upon approval of NY01 by NY OCMI, make permanent repairs to vessel in accordance with repair proposal.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 November 2004
Resolved 23 November 2004
Resolution: Witnessed new stainless steel elbows on both the port and starboard MDE cooling lines. Conducted 30 minute operational test of both engines in Upper New York Bay.
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 November 2004 Resolved
Submit documentaion for each vessel in the fleet describing the types of elbow installed in engine cooling line.
Due 23 November 2004
Resolved 23 November 2004
Resolution: [name withheld] provided information that 4 vsls have stainless steel and 2 have aluminum.
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 November 2004 Resolved
For those vessels with aluminum elbows, inspect and provide a repair proposal to the CG. Repair extended to 01 December for the [name withheld] and Ed Rogowski.
Due 1 December 2004
Resolved 1 December 2004
Resolution: Vsl rep had stainless steel elbows installed to replace aluminum ones on the [name withheld] and Schuyler Meyer Jr.
Construction/Loadline › Hull › Longitudinal Frame
Issued 19 November 2004 Resolved
Provide repair proposal for cracked underdeck frame IWO shell plate in #1 port watertight compartment.
Due 15 January 2005
Resolved 30 August 2005
Resolution: Proposal accepted.
Construction/Loadline › Hull › Weld
Issued 19 November 2004 Resolved
Properly weld the unwelded stiffeners as marked IVO of the aft bulkhead of #1 port watertight compartment.
Due 15 January 2005
Resolved 23 August 2005
Resolution: Completed.
Construction/Loadline › Hull › Weld
Issued 19 November 2004 Resolved
Properly vee and reweld to remove porosity IWO sheerstrake at weld connecting hull plate to main deck in port lazarette.
Due 15 January 2005
Resolved 26 August 2005
Resolution: Completed.
Construction/Loadline › Hull › Stiffener
Issued 19 November 2004 Resolved
Properly weld the unwelded steering mount IVO shell plating in Port Lazarette.
Due 15 January 2005
Resolved 26 August 2005
Resolution: Completed.
Engineering › Bilge Water Management System › Strainer
Issued 19 November 2004 Resolved
Remove duct tape on bilge piping and permanently repair piping.
Due 10 December 2004
Resolved 15 December 2004
Resolution: Duct tape removed; no evidence of damage to piping, no repair needed.
Construction/Loadline › Hull › Transverse Frame
Issued 19 November 2004 Resolved
Submit repair proposal to CG for vertical Deep Web Frame for hydraulic ram sheered at "A" strake in the port lazarette.
Due 15 January 2005
Resolved 25 August 2005
Resolution: Resolved.
Construction/Loadline › Hull › Hull Plating
Issued 19 November 2004 Resolved
Submit repair proposal to CG to remove backing strips located in port and starboard lazarette hull plating.
Due 15 January 2005
Resolved 18 August 2005
Resolution: Previously approved repair.
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 November 2004 Resolved
Remove dead end wire in #1 starboard watertight compartment.
Due 10 December 2004
Resolved 15 December 2004
Resolution: The dead end wire was removed.
Construction/Loadline › Hull › Stiffener
Issued 19 November 2004 Resolved
Reweld missing weld underneath the length of #4 SSL inboard side from the top in the #2 starboard watertight compartment.
Due 10 December 2004
Resolved 23 August 2005
Resolution: Completed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 19 November 2004 Resolved
Make forward bulkhead watertight in #2 starboard compartment.
Due 10 December 2004
Resolved 15 December 2004
Resolution: Cable opening made watertight with marine epoxy.
Construction/Loadline › Hull › Bracket
Issued 19 November 2004 Resolved
Crop and Renew crack weld IWO rudder arm support post on outboard sideshell as marked in the starboard lazarette.
Due 15 January 2005
Resolved 26 August 2005
Resolution: Completed.
Construction/Loadline › Hull › Bracket
Issued 19 November 2004 Resolved
Crop and renew bent/torn tripping brackets (#2 and #3) outboard IWO of the stern in the starboard lazarette.
Due 15 January 2005
Resolved 25 August 2005
Resolution: Repaired.
Stability › Watertight Integrity › General
Issued 19 November 2004 Resolved
Install hatch securing devices as required by 46 CFR 179.360(b)(2).
Due 10 December 2004
Resolved 15 December 2004
Resolution: Hatch securing cables were reattached to hatch covers.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 19 November 2004 Resolved
Clean all bilges in order to remove water, oily mixtures and loose metallic fittings.
Due 10 December 2004
Resolved 15 December 2004
Resolution: Bilges clean and dry.
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 November 2004 Resolved
Provide permanent repair proposal for the corroded aluminum fitting leading to the rubber hose for the shaft seal. Rcvd repair proposal (12/2/04); new pipe installed (12/16/04); still need hose barb welded onto aluminum pipe.
Due 22 December 2004
Resolved 15 March 2005
Resolution: In follow up conversation with NYWT port engineer [name withheld], confirmed that the approved modifications were completed, and galvanic corrosion potential eliminated.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 20 September 2004 Resolved
Fixed CO2 System Time Delay needs to be tested by reputable agency. Also, provide proper documentation for weight check of the CO2 Bottles for System.
Due 5 October 2004
Resolved 5 October 2004
Resolution: Fixed CO2 System tested as necessary.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 20 September 2004 Resolved
Trash line for existing Fixed CO2 System not in place.
Condition: Unknown
Due 15 October 2004
Resolved 15 October 2004
Resolution: Trash Line Installed as Necessary.
Engineering › Generator (propulsion/auxiliary-electric) › Cable
Issued 20 September 2004 Resolved
Manual Emergency Fuel Shut-off Pull Cable binding at pull site. Prove proper operation of same.
Due 5 October 2004
Resolved 5 October 2004
Resolution: Emergency Fuel Shut-Off Cabling Freed as Necessary.
Operations/Management › Pollution › Control of Discharge of Oil
Issued 20 September 2004 Resolved
Remove Oily Water from bilges below MDE's.
Due 5 October 2004
Resolved 5 October 2004
Resolution: Oily Water Mixture Removed from Bilges.
Electrical › Electric Generation Source (service) › Conductor
Issued 20 September 2004 Resolved
Properly Terminate/Remove Alternator Wires on both MDE's.
Due 15 October 2004
Resolved 15 October 2004
Resolution: Wires Terminated as Necessary.
Engineering › Freshwater System (jacketwater cooling) › Storage Tank
Issued 20 September 2004 Resolved
Properly Cap Coolant Overflow Resevoir.
Due 5 October 2004
Resolved 29 September 2004
Resolution: Properly Capped same.
Electrical › Electrical Distribution System (service) › Cable
Issued 20 September 2004 Resolved
Properly Terminate/Remove Dead End cabling at F/O Fill point.
Due 5 October 2004
Resolved 5 October 2004
Resolution: Dead End cabling Removed as Necessary.
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 20 September 2004 Resolved
Post Instructions for Crew on how to Operate the Bilge Pumping System as a Secondary Fire Fighting Pump.
Due 5 October 2004
Resolved 5 October 2004
Resolution: Instructions for Crew Posted as Necessary.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 29 June 2004 Resolved
Provide proof of current servicing of all portable fire extinguishers (NO SAIL).
Condition: Improper/Lack of Maintenance
Due 22 July 2004
Resolved 27 July 2004
Resolution: Complete.
Lifesaving › Inflatable Liferafts › Servicing
Issued 29 June 2004 Resolved
Provide proof of current servicing of liferaft.
Condition: Improper/Lack of Maintenance
Due 22 July 2004
Resolved 18 August 2005
Resolution: Liferaft serviced.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 29 June 2004 Resolved
Repaint draft markings as needed.
Due 22 July 2004
Resolved 20 July 2004
Resolution: Complete.
Construction/Loadline › Hull › Stiffener
Issued 29 June 2004 Resolved
Repair bow deck and framing.
Condition: Damaged By Earlier Event
Due 22 July 2004
Resolved 27 July 2004
Resolution: Complete.
Construction/Loadline › Structures › Scuttle
Issued 29 June 2004 Resolved
Pump out water from stbd forepeak and hose test deck scuttle.
Condition: Unknown
Due 22 July 2004
Resolved 27 July 2004
Resolution: Complete & conducted sat. chalk test.
Engineering › Fuel Oil Service System › Piping
Issued 29 June 2004 Resolved
Locate & repair fuel leaks in stbd/port fuel voids and conduct in-water system test. (NO SAIL)
Condition: Unknown
Due 22 July 2004
Resolved 27 July 2004
Resolution: Running test sat.
Construction/Loadline › Structures › Scuttle
Issued 29 June 2004 Resolved
Attach captive device to stbd lazerrette scuttle.
Condition: Unknown
Due 22 July 2004
Resolved 27 July 2004
Resolution: Completed.
Construction/Loadline › Hull
Issued 19 December 2003 Resolved
Submit permanent repair proposal to New York Officer In Charge, Marine Inspection (NYCMI), regarding fracture and subsequent water intrusion discovered in starboard lazarette. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2003
Construction/Loadline › Hull
Issued 19 December 2003 Resolved
Upon approval of NY01, by NYCMI, make permanent repairs to vessel in accordance with repair proposal. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2003
Engineering › Bilge Water Management System
Issued 13 August 2003 Resolved
Provide proof that installed bilge pump can pump 25 GPM required by 46 CFR 182.520 through the installed 1" pipe.
Due 20 August 2003
Resolved 23 September 2003
Electrical › Electrical Distribution System (service)
Issued 13 August 2003 Resolved
Provide proof of approval for electrical outlet on extension cord installed in bar area. LEGACY COMPONENT DESC: Wiring
Due 20 August 2003
Resolved 16 October 2003
Resolution: Electrical outlet and extension cord was removed from bar area.
Lifesaving › Lifejacket/PFD (General)
Issued 13 August 2003 Resolved
Properly stow a % of children's life jackets on upper deck and label location. LEGACY COMPONENT DESC: Storage
Due 27 August 2003
Resolved 16 October 2003
Resolution: Children lifejackets properly stowed and labeled on upper deck.
Engineering › Bilge Water Management System
Issued 13 August 2003 Resolved
Provide hose for hand pump long enough to allow pump to discharge over the side.
Due 27 August 2003
Resolved 23 September 2003
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 13 August 2003 Resolved
Provide two B-II CO2 fire extingushers for the aft deck.
Due 20 August 2003
Resolved 16 October 2003
Resolution: Two B-II extinguishers are mounted at for the aft deck.
Construction/Loadline › Penetrations
Issued 13 March 2003 Resolved
Plug hole in bulkhead #9 for unused penetration. LEGACY COMPONENT DESC: Pipe Flange
Due 6 September 2003
Resolved 22 October 2003
Documentation › Certificates/Documents
Issued 13 March 2003 Resolved
Post COI & Stability Ltr.
Due 6 September 2003
Resolved 22 October 2003
Lifesaving › Hand Flares
Issued 13 March 2003 Resolved
Provide required flares for L,B & S route. LEGACY COMPONENT DESC: Quantity
Due 6 September 2003
Resolved 22 October 2003
Navigation › Piloting/Steering
Issued 13 March 2003 Resolved
Provide required charts and publications
Due 6 September 2003
Resolved 22 October 2003
Accommodation/Occupational Safety › Medical/First Aid
Issued 13 March 2003 Resolved
Provide first aid kit LEGACY COMPONENT DESC: Medicine Chest
Due 6 September 2003
Resolved 22 October 2003
Navigation › Piloting/Steering
Issued 13 March 2003 Resolved
Provide compass deviation table LEGACY COMPONENT DESC: Compass Deviation Table
Due 6 September 2003
Resolved 22 October 2003
Engineering › Bilge Water Management System
Issued 13 March 2003 Resolved
Prove proper operation of Strb engine room high water alarm LEGACY COMPONENT DESC: Alarm
Due 6 September 2003
Resolved 22 October 2003
Documentation › Logs/Records
Issued 13 March 2003 Resolved
Provide bridge and training log. LEGACY COMPONENT DESC: Logbook/Record (unofficial)
Due 6 September 2003
Resolved 22 October 2003
Documentation › Markings/Placards
Issued 13 March 2003 Resolved
Provide emg broadcast instructions and emg instructions
Due 6 September 2003
Resolved 22 October 2003
Engineering › Sea-water System (primary cooling)
Issued 13 March 2003 Resolved
Provide handles for the P&S MDE sea chests. LEGACY COMPONENT DESC: Piping
Due 6 September 2003
Resolved 22 October 2003
Operations/Management › Drills/Instruction
Issued 13 March 2003 Resolved
Complete fire and MOB drills LEGACY COMPONENT DESC: MOB/Fire
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 August 2003
Resolved 22 October 2003

Casualty record · 10

10 November 2004Routine · role: Involved in a Marine Casualty · activity 2238867
28 March 2005Routine · role: Involved in a Marine Casualty · activity 2322057
15 August 2005Routine · role: Involved in a Marine Casualty · activity 2593987
22 November 2005Routine · role: Involved in a Marine Casualty · activity 2547674
9 February 2006Routine · role: Involved in a Marine Casualty · activity 2582332
10 May 2006Routine · role: Involved in a Marine Casualty · activity 2665868
13 July 2006Routine · role: Involved in a Marine Casualty · activity 2715832
20 July 2006Routine · role: Involved in a Marine Casualty · activity 2725527
12 August 2007Routine · role: Involved in a Marine Casualty · activity 3028878
5 October 2008Routine · role: Involved in a Marine Casualty · 1 injured · activity 3339336
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 2

SCHUYLER MEYER JR (2004–2008), SCHYLER MEYER JR (2005–2007). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.