Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
296 - Regulatory (Subpart C or D), Gross Ton
1020 - Convention (Subpart B), Gross Ton
201 - Regulatory (Subpart C or D), Net Ton
306 - Convention (Subpart B), Net Ton
Maury page id
psix-7096
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 26 October 2023Resolved
Gauges for aux. generator engine RPM must be fitted; no RPM guage installed on P/S or S/S generators.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 November 2023
Resolved 3 November 2023
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 March 2023Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Vessel reported the port generator is inoperable. Vessel plans to effect repairs of the inoperable generator in next port of call Dos Bocas, Mexico. Provide TPO report attesting to repair and suitability for intended service.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2023
Resolved 30 June 2023
Resolution: Temporary repair. Replaced inop generator with refurbished generator from another Crosby vessel with same capacity. Generator installed and tested to satisfaction of ABS. Permanent repair to be complete in 90 days.