Records from 2007 to 2024. Most recent: inspection, 8 March 2024.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2007
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 5 November 2025 · expires 31 December 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
8 March 2024
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7897730
24 January 2023
COI Inspection · Examination of Repairs · Internal Structural Exam · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7626474
30 December 2020
Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7117791
2 March 2020
Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6916782
5 August 2019
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6852463
22 February 2019
Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6630836
10 January 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6608500
27 December 2017
Type not recorded
No type recorded · Suspension & Revocation National Center of Expertise · Activity 6329488
12 December 2017
Cargo Tank Internal · MTSA Verification · Drydock Exam · Examination of Repairs · Internal Structural Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6323396
14 February 2017
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6088352
11 March 2016
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5831368
16 February 2016
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5817274
3 April 2015
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5097738
26 November 2014
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5030850
28 March 2014
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4823393
14 February 2012
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4242151
7 July 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3788582
23 February 2010
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3681708
12 February 2009
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3414623
12 December 2007
Internal Structural Exam · Cargo Tank Internal · MTSA Verification · Initial Certification · Initial Construction-Excluding Oversight · Hull Examination
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3114189
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 25 January 2021
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 0.5 inch diameter and is at least 1 inch long. It must be located at the top of the flange face, midway between bolt holes, and in line with the bolt hole pattern. The port side vapor connection has a static insulator mounted, blocking access to the required stud. Remove static insulator to comply with stated site prior to loading cargo through port side or making any connection to port side vapor connection on/or before February 25, 2021.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 February 2021
Resolved 25 January 2021
Resolution: Received photographic evidence sufficient to clear deficiency.
Engineering › Steam System (auxiliary) › Valve, Relief
Issued 16 February 2016
Resolved
Test or Renew Steam piping safety relief valve, and hydro piping over 3 inch nominal size per 46 CFR 61.15-5 prior to using steam system for cargo operations.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 March 2016
Resolved 11 March 2016
Resolution: Owner rep renewed relief valve, and hydro tested all steam piping over 3".
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 12 December 2007
Resolved
Vessel owner shall prove that cargo pump engine units are in complete compliance with 46 CFR 111.105-31(l).
Action required: 705 - Other - as specified
Due 1 August 2008
Resolved 10 January 2013
Resolution: Cargo pump engine units are in complete compliance with 46 CFR 111.105-31(l).