Records from 2002 to 2023. Most recent: inspection, 11 August 2023.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · MADISONVILLE, LA, UNITED STATES · built 2002
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 18 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 35
11 August 2023
Internal Structural Exam · COI Inspection · Cargo Tank Internal
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7765818
21 September 2021
MTSA Verification · Examination of Repairs · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7309409
6 July 2020
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6991410
12 November 2019
Annual Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6853780
24 June 2019
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6724180
17 June 2019
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6716442
23 July 2018
Drydock Exam · Cargo Tank Internal · MTSA Verification · Examination of Repairs · Internal Structural Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6458230
27 December 2017
Type not recorded
No type recorded · Suspension & Revocation National Center of Expertise · Activity 6329488
24 June 2016
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5910612
22 May 2015
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5132013
5 May 2014
Administrative Inspection · MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4851169
3 March 2014
Damage Survey
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4809254
2 March 2014
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4811105
14 March 2012
Internal Structural Exam · COI Inspection · Drydock Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 4264465
10 December 2009
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3645985
13 May 2009
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3473645
4 April 2008
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3177713
25 February 2008
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3153050
22 February 2008
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3152020
21 March 2007
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2911025
16 February 2007
COI Inspection · Examination of Repairs · MTSA Verification · Internal Structural Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2871932
6 April 2006
Deficiency Check
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2618084
22 March 2006
Periodic Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 2607640
1 June 2005
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2377132
13 April 2005
Administrative Inspection · MTSA Verification
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 2333016
14 February 2005
Administrative Inspection
Administrative · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 2292465
14 September 2004
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2195742
8 June 2004
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2093342
30 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1984595
29 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978998
8 May 2003
Annual Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1789309
7 April 2003
Administrative Inspection
Administrative · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1769432
19 October 2002
Type not recorded
No type recorded · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 1698907
5 July 2002
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1641358
21 March 2002
Internal Structural Exam · Cargo Tank Internal · Initial Certification · Hull Examination · Initial Construction-Excluding Oversight
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1494412
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 11 August 2023
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 mm diameter and is at least 25.4 mm long. It must be located at the top of the flange face, midway between bolt holes, and in line with the bolt hole pattern.
The port vapor line flange was missing the required permanent stud. Make repairs to the satisfaction of the attending marine inspector prior to conducting cargo operations requiring use of the vapor system.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 August 2023
Resolved 28 September 2023
Resolution: Received, reviewed and accepted objective evidence that the stud was installed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 17 June 2019
Resolved
Vessel sustained damage due to an allision on the #6 port wing void. Bilge knuckle, side shell plating, transverse floor framing, and vertical framing were all damaged due to the impact. The following repairs are required to be made to the satisfaction of the attending marine inspector (MI):
1. #6P Wing Void - Make permanent repairs to the damaged bilge knuckle section. Damaged bilge knuckle is set in approximately 1.5 inches over a 19 inch section.
2. #6P Wing Void - Make permanent repairs to the damaged side shell plating. Damaged side shell plating is directly adjacent to the damaged bilge knuckle.
3. #6P Wing Void - Make permanent repairs to the damaged transverse floor framing (tank support framing). Damaged area is approximately 25 inches long starting at the side shell moving inboard. Includes the whole height of the transverse frame.
4. #6P Wing Void - Make permanent repairs to the damaged portion of the vertical chord framing directly attached to the side shell longitudinals. The damaged area includes the first 40 inches of the channel iron measured from the bottom going up.
5. #6S Wing Void - Make permanent repairs to the damaged section of the transverse floor framing. Damaged frame is directly ahead of the compartment's aft watertight bulkhead between the 3rd and 4th bottom longitudinal outboard of the center vertical keel. Damaged area is approximately 18 inches wide, 10 inches high, and deflected approximately 1 to 1.5 inches out of alignment.
Owner/Operator is reminded the requirements of 46 CFR 30.10-10 apply.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 June 2019
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 22 March 2006
Resolved
Repair gasket on No.1 Port Ulage Opening.
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 April 2006
Resolution: Found correct