Inspection history · 111
26 March 2026
Examination of Repairs · Drydock Exam · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8332429
21 November 2025
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8253249
3 March 2025
Deficiency Check · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8092487
25 November 2024
MARPOL Annex VI Survey · MARPOL Annex I Examination · MTSA/ISPS Verification · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8029687
24 October 2024
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8031514
3 June 2024
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7939024
22 January 2024
Deficiency Check · Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7852895
5 December 2023
Annual Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7818161
10 December 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7609593
3 October 2022
Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7570685
26 August 2022
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7544124
10 June 2022
Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7473832
31 May 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7464675
22 April 2022
Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7435988
16 March 2021
Internal Structural Exam · Administrative Inspection · Drydock Exam · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7157593
2 December 2020
MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7102105
15 April 2019
Drydock Exam · Annual Inspection · Examination of Repairs · Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6663551
31 January 2019
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6617834
27 November 2018
Administrative Inspection · In-Service Inspection · Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6588220
27 November 2018
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6593075
4 October 2018
Administrative Inspection · MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6555151
16 June 2018
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6448641
10 October 2017
Administrative Inspection · Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6284418
10 May 2016
Construction Oversight · Examination of Repairs · Administrative Inspection · Hull Examination · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5873872
19 January 2016
Damage Survey
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5799757
17 January 2016
Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5804316
28 July 2015
Annual Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5192251
12 July 2012
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4376451
7 June 2012
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4336711
29 September 2011
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4157272
29 March 2010
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3705015
4 March 2010
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3689856
28 July 2009
Drydock Extension · Administrative Inspection
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3626452
19 February 2009
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3414602
29 January 2008
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3132292
20 July 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3001868
9 July 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3001818
1 May 2007
Plan Review (Other than "T") · Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2888122
31 May 2006
Hull Examination · Load Line/Change of Employment · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2665973
10 January 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2564096
15 November 2005
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2539384
1 September 2005
Annual Inspection · MTSA Verification
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2481113
8 September 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2190129
7 September 2004
Hull Examination · MTSA Verification · Annual Inspection · Internal Structural Exam
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2169412
13 August 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2165306
30 June 2004
Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2116511
30 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1979460
17 December 2003
Type not recorded
No type recorded · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1965589
23 October 2003
Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1934646
8 July 2003
Deficiency Check · Annual Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1831510
20 March 2003
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1776173
1 October 2002
Administrative Inspection
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1682582
12 June 2002
Periodic Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1629619
28 March 2002
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1598532
26 July 2001
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1433865
6 June 2001
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1435216
24 May 2001
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1362149
7 August 2000
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1433707
10 April 2000
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1047176
14 March 2000
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 816645
12 January 2000
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1047990
31 October 1999
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 80899
1 August 1999
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 90003
1 August 1999
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1114856
26 July 1999
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1462008
4 June 1999
COI Inspection · Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1406488
30 April 1999
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1048837
28 August 1998
Type not recorded
No type recorded · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 537122
25 August 1998
Type not recorded
No type recorded · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 682725
18 August 1998
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1450269
14 August 1998
Type not recorded
No type recorded · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 136670
12 March 1998
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 786157
24 December 1997
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 784066
24 November 1997
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 781627
29 August 1997
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1450064
23 August 1997
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1434629
21 August 1997
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 171862
27 March 1997
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1430390
28 January 1997
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1102599
28 May 1996
Hull Examination · Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1084878
30 January 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 752497
27 January 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 200849
31 March 1995
Administrative
Administrative · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1144894
24 March 1995
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 856053
12 March 1994
Hull Examination · Re-Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1354860
3 February 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1163765
29 November 1993
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 848728
28 November 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 34122
25 March 1993
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 836710
2 March 1993
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1146361
5 February 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 682701
2 February 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 119782
6 August 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1264907
4 June 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 957399
6 April 1992
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1256112
4 September 1991
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 941204
6 June 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1235758
19 March 1991
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1220715
9 July 1990
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1221372
18 May 1990
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1240007
29 March 1990
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 983357
31 July 1989
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1043403
4 May 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1040939
30 March 1989
COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1206861
20 June 1988
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 895387
8 April 1988
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1352960
10 March 1987
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1019818
15 April 1986
Credit Drydock
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 993191
29 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1288958
7 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 984268
4 April 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1281390
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 November 2025
Resolved
Gears, couplings, flywheels, and all rotating machinery capable of injuring personnel must be provided with adequate covers or guards. Multiple guards on machinery damaged/corroded; STBD FWD winch cable drum, aux saltwater pump coupling, oil circulating pump, ect. 46 CFR 58.01-20
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2025
Resolved 2 December 2025
Resolution: Reviewed pictures attesting to repairs; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 November 2024
Resolved
Each individual bilge suction shall be fitted with a suitable bilge strainer having an open area of not less than 3 times that of the suction pipe. All bilge suctions had strainers removed. Replace and provide documentation attesting to installation.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 November 2024
Resolution: Received documentation that strainers were installed.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 5 December 2023
Resolved
For industrial vessels of 300 gross tons and over but less than 4,000 gross tons, contracted for prior to July 1, 1968, which carry in excess of 12 industrial personnel, existing structure arrangements and materials previously approved will be considered satisfactory so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. MI found structural wastage, openings, and holes along the entire machinery space boundary, a space protected by CO2 fixed extinguishing system.
46 CFR 92.07-90(b), 46 CFR 95.15-35(b)(c), Action Code 705: Until current contracted work is completed in Southwest Pass.
Action required: 705 - Other - as specified
Due 1 February 2024
Resolved 16 April 2024
Resolution: MI witnessed multiple areas with renewed metal correcting the wastage and holes in the machinery space. all sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 5 December 2023
Resolved
The inspection shall be such as to insure that the vessel, as regards the structure is in satisfactory condition and fit for the service for which it is intended. During the general walk-through MI discovered multiple holes in the superstructure of the vessel. Concerning holes and wastage was found on bulkhead to the machinery space, fuel vents, decking, ladder wells and stanchions supporting the 03 Portable Accommodation Module. Complete repairs to the satisfaction of the attending marine inspector at the next dry-dock, anticipated in OCT 2024.
46 CFR 91.25-10, Action Code: 705
Action required: 705 - Other - as specified
Due 5 December 2023
Resolved 16 April 2024
Resolution: MI conducted complete walk around vessel, deck, house, and PAMS. All wasted metal had been renewed.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 5 December 2023
Resolved
General arrangement plans showing for each deck the fire control stations, the various sections enclosed by fire-resisting bulkheads. When reviewing the fire control plan. Plan did not have markings for fire-resisting bulkheads. Revise plan to the satisfaction of the attending Marine Inspector at the next dry-dock, anticipated in OCT 2024.
46 CFR 97.36-1(a), Action Code: 705, Complete at dry-dock
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 5 December 2023
Resolved 25 April 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 November 2022
Resolved
Each power bilge pump must have the capacity to develop a suction velocity of no less than 400' per minute. Vessel was not able to draw suction from bilge pump in engineer plant.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 16 December 2022
Resolution: Vessel was able to draw suction from bilge pump in engineer plant.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 15 November 2022
Resolved
Fire pumps may be used for other purposes provided at least one of the required pumps is kept available for use on the fire system at all times. The #2 fire pump has excessive water leaking from the packing. Repair to the satisfaction of attending MI.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 16 December 2022
Resolution: Repair to #2 fire pump packing completed.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 15 November 2022
Resolved
Fire Main - All piping, valves and fittings shall meet subchapter F. Vessel had at least 02 soft patches applied to it. Renew piping to the satisfaction of the attending MI.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 December 2022
Resolved 16 December 2022
Resolution: Fire Main piping has been renewed.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 15 November 2022
Resolved
In spaces where the general emergency alarm signal cannot be heard over the background noise, there must be a red flashing light or rotating beacon. Bilge alarm and GE alarm light or beacon in generatior room are not working. Repair to the satisfaction of attending MI.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 16 December 2022
Resolution: Bilge & GE alarms tested satisfactory.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 15 November 2022
Resolved
All generator alarm bells shall be identified by red lettering at least 1/2" "GENERAL ALARM - WHEN BELL RINGS GO TO YOUR STATION." The beacon and bell in the gen room were not labeled. Replace to the satisfaction of attending MI.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 16 December 2022
Resolution: Beacon and bell in gen room have been labeled.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 November 2022
Resolved
Pressure vessels that are required to be stamped must have the following: manufacture's name and serial #, Coast Guard #, Coast Guard symbol, MAWP, Class, min design temp & water capacity in liters. The #2 air receiver in the gen room has a wasted data plate. Renew or replace to the satisfaction of attending MI.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 16 December 2022
Resolution: The #2 air receiver has been replaced.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 15 November 2022
Resolved
Class 1 doors are permitted within crew and working spaces wherever located if in the judgement of the OCMI the door is located where it will be closed at all times except when in use. Class 1 WTD located at frame 71 between the gen room and pump room cannot be closed. Repair to the satisfaction of the the attending MI.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 16 December 2022
Resolution: Class 1 WTD has been repaired and is able to close.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 November 2022
Resolved
Electrical equipment must be arranged as far as practicable to prevent mechanical damage to the equipment from dust, oil, steam or dripping liquids. The spring bearing cooler OVBD at frame 57 STBD side is leaking on top of a heater controller and another fuse/breaker panel or junction box. Repair to the satisfaction of the attending MI.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 16 December 2022
Resolution: Spring bearing cooler OVBD at frame 57 STBD side has been repaired and not leaking.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 November 2022
Resolved
Complete but simple instructions for the operation of the system must be located in a conspicuous place at or near all pull boxes, stop valve controls. Paint locker fire extinguishing instructions are weathered/faded; clean or replace.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 28 December 2022
Resolution: Fire extinguishing instructions have been renewed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 November 2022
Resolved
Within the accommodation and service area the following conditions shall apply:... Portable accommodation module (PAM) No. 1 has 02 improper electrical cable way penetrations through class A boundry.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 28 December 2022
Resolution: PAM No. 1 electrical cable way penetrations have been repaired.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 15 November 2022
Resolved
Barges with sleeping accommodations for more than six persons...shall have permanently exhibited for the guidance of the officer in charge of the vessel... Fire control plan has not been updated to reflect current safety controls (ie. smoke detection, general alarm, and ESD, etc.).
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 19 December 2022
Resolution: Fire control updated to reflect safety controls.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 31 May 2022
Resolved
No repairs or alterations affecting the safety of the vessel or its machinery shall be made unless applicable requirements in this chapter are met.
Vessel reported they found a 2" diameter hole in the starboard store room bilge (FR 26) near the forward transverse bulkhead. Vessel is authorized 01 time transit to emergency dry dock for permanent repairs. 46 CFR 2.01-15(a)
Action required: 60 - Rectify deficiencies prior to movement
Due 31 May 2022
Resolved 17 June 2022
Resolution: Vessel made repairs with an insert to the satisfaction of the Coast Guard.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 8 September 2021
Resolved
The general alarm system shall consist of electric vibrating bells and in certain cases flashing red lights located throughout passenger and crew's quarters, machinery spaces, and so long as to warn all occupants in an emergency.Vessels general alarm did not sound in Chief Engineer and Captains stateroom when exterior doors were in the closed position.
Old subchapter "J" 46 CFR 113.25-5(a)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2021
Resolution: Cleared by Sector NOLA MI's.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 8 September 2021
Resolved
Vessels on all routes 1600 GT's and over are required to have staorage batteries or diesel or gas turbine generator automatically or manual operated for a 12 hour operational period. Vessel crew was unable to start emergency generator for operational testing and to test alarms and shutdowns.
OLd "J" 46 CFR 112.05-5(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2021
Resolution: Cleared by Sector NOLA MI's.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 September 2021
Resolved
At each inspection for certification and at such other times as considered necessary the inspector shall determine that all fire-extinguishing equipment is in suitable condition and may require such test as are considered necessary to determine the condition of equipment. #3-5 fire hydrants had excessive leaking at the valve.
Old "I" 46 CFR 91.25-20(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 September 2021
Resolution: Tested hydrants under system pressure, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 September 2021
Resolved
Suitable guards shall be installed in way of exposed in dangerous places such as gears and machinery. Vessels dredge pump gears were exposed in machinery space posing a hazard to personnel.
Old " I" 46 CFR 92-25-15(a)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2021
Resolution: Cleared by Sector NOLA MI's.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 September 2021
Resolved
At each inspection for certification and at such other times as considered necessary the inspector shall determine that all fire-extinguishing equipment is in suitable condition and may require such test as are considered necessary to determine the condition of equipment. Vessels number 2 Fire/Service pump had excessive leaking at packing gland and leaking a large amount of water in bilge.
Old "I" 46 CFR 91.25-20(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 September 2021
Resolution: Packing renewed. Conducted operational test of fire pump.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 8 September 2021
Resolved
When a manually started emergency lighting and power system is installed, the circuits listed in 46CFR 112.15-5,(embarkation station, passenger quarters, crew quarters, public spaces, machinery spaces shall be arranged so that they may be energized from the emergency source of supply.
Vessel had emergency lighting throughout vessel that was inoperable and no lighting in machinery spaces.
Old "I" 46 CFR 112.15-15(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2021
Resolution: Installed more lighting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 September 2021
Resolved
No repairs or alterations affecting the safety of the vessel with regard to hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Vessel had an unapproved portable rental generator to replace missing required main generator. Vessel is required to submit plans for approval to use portable generator or replace original main generator.
Old "I"
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 October 2021
Resolved 25 April 2022
Resolution: Inspected instillation of new ABS approve generator. Def check Activity #7435988
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 September 2021
Resolved
Installation of all systems of electrical engineering or interior communication nature, together with the details of design, construction and installation shall be in accordance with the requirements of subchapter "J". Vessel had junction box fwd upper machinery space that had wires pulled out of box and wire runs above emergency fire pump are being chaffed due to broken stuffing tube.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2021
Resolution: Cleared by Sector NOLA MI's.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 8 September 2021
Resolved
No repairs or alterations affecting the safety of the vessel with regard to hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Vessel had a soft patch on pipe coming from the main seachest to vessels main generator and all other onboard engines.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 September 2021
Resolution: Section of piping was renewed.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 8 September 2021
Resolved
46 CFR 56.70 (c)
Where fuel tanks are installed below weather deck, arrangements shall be provided for operating all shutoff valves at the tank outside the compartment where its located. Remote fuel shutoff valves from day tanks inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2021
Resolution: Cleared by Sector NOLA MI's.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 September 2021
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150.
Lifebuoy lines were deteriorated.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2021
Resolution: Cleared by Sector NOLA MI's.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 September 2021
Resolved
At least one-half the total number of lifebuoys on the vessel must each be fitted with a self-igniting light approved under approval series 161.010. Lifebuoy lights did not work and were replaced with wrong battery.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2021
Resolution: Cleared by Sector NOLA MI's.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 September 2021
Resolved
Exhaust pipe installations must conform with requirements of ABYC P-1 and part 1 section 23 of NFPA 302. Exhaust lagging on ship service diesel generator was missing.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 8 September 2021
Resolved
There shall be at least two means of escape from all general areas accessible to the passengers if carried or where the crew may be quartered or employed. The emergency escape aft starboard side machinery space was seized and unable to be opened.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2021
Resolution: Cleared by Sector NOLA MI's.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 March 2021
Resolved
Fire hydrants shall be of sufficient number and located that any part of the vessel accessible to persons on board while the vessel is being navigated may be reached with at least 2 streams of water from separate outlets, one of which shall be from a single length of hose.
A single length of 50' hose could not reach the portable accommodation modules.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2021
Resolution: Installed 4 hydrants to reach each PAM.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 16 March 2021
Resolved
The use of low melting point materials must not be used in vital systems unless approved by MSC. Vessel has plastic piping used in the fire main system.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2021
Resolution: Removed PVC from firemain. Piped toilet water to freshwater system.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 16 March 2021
Resolved
No repairs or alterations affecting the safety of the vessel with regard to hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Vessels fire main supplies water to the accommodation modules. Produce approved fire main drawings showing this modification.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 15 September 2021
Resolution: Updated fire plan with new hydrants.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 2 December 2020
Resolved
All general alarm bells shall be identified by red lettering at least 1/2 inch high: "GENERAL ALARM-WHEN BELL RINGS GO TO YOUR STATION" General Alarm in vessel's galley does not have required markings.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2020
Resolved 7 December 2020
Resolution: Vessel provided appropriate markings to the satisfaction of the reviewing Marine Inspector.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 2 December 2020
Resolved
Alcohol testing devices need not be carried on board each vessel if obtaining the devices and conducting the required alcohol tests can be accomplished within 2 hours from the time of occurrence of the SMI. Vessel's on board alcohol testing strips expired in 2017. Vessel was unable to provide proof of available test kits within two hours.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2020
Resolved 7 December 2020
Resolution: Vessel provided alcohol testing devices as required.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 December 2020
Resolved
a) For all vessels of 4,000 gross tons and over contracted for prior to January 1, 1962, existing structure arrangements and materials previously approved will be considered satisfactory so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standard as the original construction. Major alterations and conversions shall be in compliance with the provisions of this subpart to the satisfaction of the Officer in Charge, Marine Inspection. Fire doors in the machinery space leading into the switch board do not latch lose, have missing mechanical latches and doors are rusted through. Fire boundary doors throughout vessel were also found not to latch properly.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2020
Resolved 31 July 2021
Resolution: New approved fire doors were installed and tested, all sat.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 2 December 2020
Resolved
Nameplates: Each tray shall be provided with a durable nameplate securely attached, bearing the manufacturer’s name or trade mark and type designation, the ampere-hour rating at a specific rate of discharge, and the specific gravity of the electrolyte. Date molded on the tray case will be acceptable in lieu of a nameplate.
No information on battery trays in the switchboard room.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2020
Resolved 7 December 2020
Resolution: Vessel provided nameplates as required, to the satisfaction of the reviewing Marine Inspector.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 2 December 2020
Resolved
Ventilation: all rooms, lockers, and boxes for storage batteries should be arranged or ventilated to avoid accumulation of flammable gas.
Poor ventilation in the stbd side switchboard room where the batteries and charger is located.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2020
Resolved 7 December 2020
Resolution: Vessel improved ventilation to the satisfaction of the reviewing Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 April 2019
Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of subchapter F (Marine Engineering) of this chapter. Vessel's Firemain piping had hole in it.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2019
Resolution: Repaired firemain piping and hydrotested to 1.5 PSI above MAWP. Test SAT!
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2019
Resolved
All electrical engineering details and installations shall be designed and installed in accordance with subchapter J (Electrical Engineering) of this chapter. Extention Cord was wired in electrical distribution panel.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2019
Resolution: Extention cord was removed and approved marine grade cable and recepticle was installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 April 2019
Resolved
Each generator prime mover must have an overspeed device that is independent of the normal operating governor and adjusted so that the speed cannot exceed the maximum rated speed by more than 15 percent. MI was unable to test overspeed device due to failure in overspeed device.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2019
Resolution: Tested all required overspeeds in accordance with regulatory requirements.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 April 2019
Resolved
No repairs or alterations affecting the safety of the
vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Vessel conducted repairs to CG approved Type II MSD.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2019
Resolution: Repairs were made by an approved facility. Test SAT
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 28 November 2018
Resolved
A survey, either general, or partial according to the circumstances shall be made every time an accident occurs. Following report of damage to fore-peak area, submit temporary repair proposal to MI. iaw 46CFR91.30-1(a)
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 28 November 2018
Resolution: Temporary repair conducted with welded box and cement patch to satisfaction of attending marine inspector.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 28 November 2018
Resolved
The survey shall be such to insure that the necessary repairs have been effectively made. Provide repair proposal and complete permanent repairs prior to credit drydock in 18Aug19. iaw 46CFR91.30-1(a)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 February 2019
Resolved 19 July 2019
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 10 October 2017
Resolved
Properly connect the hydrostatic release units to the inflatable liferafts.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2017
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 10 October 2017
Resolved
Replace all expired floatlight batteries
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 17 October 2017
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 October 2017
Resolved
Make operable port running light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 10 October 2017
Communications › Radio Communications › EPIRB
Issued 10 October 2017
Resolved
Properly mark EPIRB hydrostratic release unit with next service date.
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 12 October 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 10 October 2017
Resolved
Provide and install CO2 system instructions and diagram.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 26 October 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 10 October 2017
Resolved
Provide test report for all bilge CO2 system bilge nozzles.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 November 2017
Documentation › Markings/Placards › Warning Signs
Issued 10 October 2017
Resolved
Provide CO2 warning placard throughout machinery spaces protected by CO2.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 November 2017
Documentation › Markings/Placards › Oil Discharge Placard
Issued 10 October 2017
Resolved
Provide updated MARPOL placards in engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 16 October 2017
Electrical › Electrical Distribution System (service) › Wiring
Issued 10 October 2017
Resolved
Properly terminate dead-end wiring in junction box or remove.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 24 October 2017
Electrical › Electrical Distribution System (service) › Wiring
Issued 10 October 2017
Resolved
Remove permanent extension cords and power strips throughout vessel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 10 October 2017
Engineering › Sea-water System (primary cooling) › Pump
Issued 10 October 2017
Resolved
Make repairs to auxiliary generator cooling pump leaking shaft seal.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 10 November 2017
Engineering › Fuel Oil Service System › Hose
Issued 10 October 2017
Resolved
The auxiliary generator supply fuel hose may only be 30" in length. Provide and install hard pipe for section exceeding 30".
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 20 October 2017
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 19 January 2016
Resolved
Submit plan and complete permanent repairs on fuel tank #8 prior to placing fuel in and placing tank back into service.
Action required: 705 - Other - as specified
Resolved 8 September 2016
Engineering › Diesel Engine (auxiliary) › Bearing
Issued 14 September 2015
Resolved
Complete the final repairs to the main pedastal bearing at the next vessel drydocking on 29Aug2016. All oil to be kept wiped up and maintained on regualr rounds.
Condition: Improper Installation
Due 29 August 2016
Resolved 8 September 2016
Engineering › Compressed Air System (start air) › Control Gear
Issued 28 July 2015
Resolved
1. To be completed prior to 30July2015 and prior to vessel operating, Provide accurate pressure gauge at the air receivers to replace the one that the engineer states is not accurate. This is needed for testing of the 4 air receiver relief valves that were not inspected from Activity 5037750. Tests to be witnessed by the USCG.
Action required: 705 - Other - as specified
Due 15 August 2015
Resolved 30 July 2015
Fire Fighting › Means of Escape › Doorways
Issued 28 July 2015
Resolved
2. To be completed prior to 30July2015 and prior to vessel operating, Repair the sticking door on the port electrical room aft. Door jams closed. Have this door examined by a USCG marine inspector when repaired
Action required: 705 - Other - as specified
Due 15 August 2015
Resolved 30 July 2015
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 28 July 2015
Resolved
3. To be completed by 15Aug2015. Stbd side by the pump engine there is a electrical box inbetween the general alarm bell and the light that is missing cover, Replace the cover and have examined by a USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 15 August 2015
Resolved 30 July 2015
Electrical › Electric Supply System (service) › Cable
Issued 28 July 2015
Resolved
4. To be completed prior to 15Aug2015, Throughout the vessel, especially in the engineering spaces, remove all portable extension chords that have been installed and replace with proper cables and boxes they are too numerous to list all. Have examined by a USCG marine inspector.
Action required: 705 - Other - as specified
Due 30 August 2015
Resolved 14 September 2015
Accommodation/Occupational Safety › Heating › Electric Air Heating Equipment
Issued 28 July 2015
Resolved
5. To be completed by 15Aug2015, Prove all portable heaters meet 46CFR subchapter J part 111.83-7for the required manual reset overload
Action required: 705 - Other - as specified
Due 15 August 2015
Resolved 30 July 2015
Resolution: Portable heaters removed from vessel.
Electrical › Electric Supply System (service) › Cable
Issued 28 July 2015
Resolved
6. to be completed prior to 15Aug2015, Throughout the vessel and especially in the engineering spaces there are numerous areas where plastic wire ties are being used to hold up electrical cables in the overhead. Install proper metal bands to hold cables in overhead IAW IEEE 45 20.5 and 46CFR120.340 and have examined by a USCG marine inspector.
Action required: 705 - Other - as specified
Due 31 August 2015
Resolved 14 September 2015
Electrical › Electric Generation Source (service) › Panelboard
Issued 28 July 2015
Resolved
7. To be completed prior to 31 Aug 2015, Throughout the vessel check all electrical panel boxes to make sure all directories have the required correct information IAW 46CFR111.40-11. Have examined by USCG inspector when completed.
Action required: 705 - Other - as specified
Due 3 August 2015
Resolved 14 September 2015
Engineering › Diesel Engine (auxiliary) › Bearing
Issued 28 July 2015
Resolved
8. To be completed prior to 30July2015: In the engine room an unsatisfactory condition is present, a fire hazard excessive oil in bilges, excessive oil leaks being shielded by oil soaked sheets of cardboard, hoses, fittings, gaskets all need to be check for leaks and repaired. Bilges need to be emptied of oil and all oil residue cleaned from engine, deck bilges hoses and all equipment. To be i
Action required: 705 - Other - as specified
Due 30 July 2015
Resolved 30 July 2015
Lifesaving › Immersion Suits › Quantity
Issued 4 March 2010
Resolved
Crew/Industrial worker count reduced to 46 until 2 additional, proper working immersion suits are added to vsl safety equipment & approved/noted by attending M/I.
Action required: 705 - Other - as specified
Resolved 10 March 2011
Resolution: All 47 immersion suits on board were in good working order.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 4 March 2010
Resolved
Prove proper operation of overspeed & oil pressure shutdown of Cat inport generator to satisfaction of attending MI w/i 30 days.
Action required: 705 - Other - as specified
Due 8 April 2010
Resolved 12 March 2010
Resolution: Witnessed satisfactory test of Cat shutdowns.
Engineering › Pressure Vessel › Shell Plate
Issued 4 March 2010
Resolved
Prove proper visual inspection of air recievers and/or hydro.
Action required: 705 - Other - as specified
Due 8 April 2010
Resolved 9 March 2010
Resolution: Received conformation from Sec Jax that credit inspection was rcvd.
Accommodation/Occupational Safety › Sleeping Accommodations › Area Per Person
Issued 4 March 2010
Resolved
Overnight personnel accomodations & galley installations to be approved/inspectected to satisfaction of attending MI prior to allowing over night personnel.
Action required: 705 - Other - as specified
Resolved 29 August 2011
Resolution: Galley was rebuilt. Inspection complete.
Communications › Alarms/Indicators › General Alarm
Issued 19 February 2009
Resolved
Provide/install general alarm bell in both white portable quarters.
Action required: 705 - Other - as specified
Due 19 March 2009
Resolved 19 March 2009
Fire Fighting › Remote Fuel Shutoff › General
Issued 19 February 2009
Resolved
Demonstrate proper operation of all reach rods to CG marine inspector.
Action required: 705 - Other - as specified
Due 19 March 2009
Resolved 19 March 2009
Engineering › Bilge Water Management System › Piping
Issued 19 February 2009
Resolved
Repair/renew bilge suction pipe at manifold for pipe going to port aft storage.
Action required: 705 - Other - as specified
Due 19 March 2009
Resolved 19 March 2009
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 19 February 2009
Resolved
Install guard on stbd aft generator, over rotating wheel.
Action required: 705 - Other - as specified
Due 19 March 2009
Resolved 19 March 2009
Operations/Management › Pollution › Control of Discharge of Sewage
Issued 1 September 2005
Resolved
REPAIR HOLE IN AFT BULKHEAD OF THE SEWAGE TANK (MSD) - 33 CFR 159. Extended 835 to be completed at next d/d
Action required: 705 - Other - as specified
Resolved 27 January 2006
Resolution: Hole temp repaired. New MSD will be installed at next dry-dock. New system is onboard in shipping container.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 1 September 2005
Resolved
PRIOR TO INSTALLATION OF OWS: PROVIDE CG APPROVED PLANS FOR NEW INSTALLATION OF OWS SYSTEM AND ASSOCIATED PIPING, VALVES AND REQUIRED SECOND BILGE TANK.
Action required: 705 - Other - as specified
Due 31 May 2006
Resolved 1 May 2007
Resolution: Rcv''d copy of ABS plan approval letter and plan for installation of OWS system and oil residue tank.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 1 September 2005
Resolved
ACKNOWLEDGE CONTENT OF NVIC 01-05 FOR NON-TANK VESSEL RESPONSE PLAN (NTVRP) AND COMPANY TIMELINE FOR SUBMITTAL TO OBTAIN COAST GUARD INTERIM OPERATING AUTHORIZATION LETTER. Granted 3 month extension.
Due 6 January 2006
Resolved 27 January 2006
Resolution: Vessel not self-propelled.
Operations/Management › Pollution › Compliance with Transfer Procedures
Issued 1 September 2005
Resolved
PROVIDE AND POST LINE DIAGRAM OF PIPING REQUIRED BY 33 CFR 155.720 FOR FUEL OIL TRANSFER PROCEDURES PRIOR TO TRANSFERING NEXT FUEL.
Due 9 September 2005
Resolved 27 January 2006
Resolution: Observed diagram.
Engineering › Feedwater/Condensate Water System › Piping
Issued 1 September 2005
Resolved
AT NEXT SCHEDULED DRY-DOCK; RENEW VARIOUS SECTIONS OF PIPING THROUGHOUT VESSEL MACHINERY SPACES THAT HAVE TEMPORARY OR DOUBLER PATCHES ON THEM: AUX SALT WATER AT STBD SIDE FORWARD GENERATOR SPACE AND CONDENSER PORT FORWARD AND GENERATOR ROOM SUPPLY & DISCHARGE PIPING. 46 CFR 96.03-1.
Action required: 705 - Other - as specified
Due 31 May 2006
Resolved 12 December 2006
Resolution: Corrected.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 1 September 2005
Resolved
INSTALL ELECTRICAL JUNCTION BOX COVER ON #1 HIGH PRESURE AIR COMPRESSOR MOTOR. 46 CFR 96.05-1
Due 15 September 2005
Resolved 27 January 2006
Resolution: Observed cover.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 September 2005
Resolved
PROPERLY INSTALL POWER CORD WIRE FITTING IN AUXILIARY SEA WATER PUMP MOTOR HOUSING IN FORWARD HOLD. 46 CFR 96.05-1
Due 3 October 2005
Resolved 27 January 2006
Resolution: Observed proper installation.
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 1 September 2005
Resolved
DEMONSTRATE THE FOLLOWING TESTS OF ALL DIESEL PRIME MOVER ENGINES/GENERATOR SETS TO A CG MARINE INSPECTOR: REVERSE POWER FOR GENERATOR SETS, HIGH AND LOW LUBE OIL FOR ALL DIESEL ENGINES WITH ENGINE SHUTDOWN ON LOSS OF OIL PRESSURE, AND OVERSPEED TRIPS. 46 CFR 95.03-1 AND 46 CFR 96.05-1.
Due 15 September 2005
Resolved 27 January 2006
Resolution: Properly performed with the exception of the low lube oil test. low lube oil not required. Generators are not capbale of parellel operations.
Engineering › Bilge Water Management System › Pump
Issued 1 September 2005
Resolved
DEMONSTRATE MACHINERY SPACE REMOTE VENTILATION SHUDOWN, HIGH LEVEL BILGE ALARMS, AND OPERATION OF EMERGENCY GENERATOR. 46 CFR 96.03-1
Due 15 September 2005
Resolved 27 January 2006
Resolution: Properly performed with the exception of the emergency generator.
Accommodation/Occupational Safety › Sleeping Accommodations › Area Per Person
Issued 1 September 2005
Resolved
PROVE COAST GUARD APPROVAL FOR ACCOMMODATION MODULES OR REPLACE WITH COAST GUARD ACCEPTED MODULES. 46 CFR 91.55-5(h)
Due 15 September 2005
Resolved 27 January 2006
Resolution: Received approvals granted by MSO Mobile.
Operations/Management › Drills/Instruction › Fire
Issued 1 September 2005
Resolved
DEMONSTRATE EMERGENCY DRILLS TO THE SATISFACTION OF THE ATTENDING CG MARINE INSPECTOR FOLLOWING UPDATE OF STATION BILL DUTIES. 46 CFR 199.180(c)
Due 22 September 2005
Resolved 27 January 2006
Operations/Management › Drills/Instruction › Fire
Issued 1 September 2005
Resolved
DETERMINE IF FIRE SUITS AND SCBA'S ARE TO BE MAINTAINED FOR VESSEL AND PROVIDE FUNCTIONAL EQUIPMENT (OPERABLE FLASHLIGHTS, CHARGED, SPARES, STOWAGE LOCATIONS AND TRAINING SCBA AIR TANKS) PER 46 CFR 96.35
Due 9 September 2005
Resolved 6 October 2005
Resolution: Company Policy to have onboard. Special note for history entered.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 1 September 2005
Resolved
PROVIDE COPY OF UPDATED STATION BILL IDENTIFYING CORRECT DUTIES OF EACH EMERGENCY POSITION FOR FIRE DRILL AND MEANS TO IDENTIFY WHICH LIFERAFT STATION ALL PERSONS ON BOARD THE VESSEL ARE ASSIGNED TO ESTABLISHED DURING INITIAL FAMILURIZATION AND POSTED IN CREW AREA. PERFORM TRAINING/DRILL AFTER UPDATE. POST NEW STATION BILL. 46 CFR 199.80 AND 46 CFR 199.180
Due 15 September 2005
Resolved 27 January 2006
Resolution: Observed.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 1 September 2005
Resolved
PROVIDE RECORD OF LIFESAVING APPLIANCE AND FIRE EQUIPMENT MAINTENANCE REQUIRED BY 46 CFR 199.190 AND 46 CFR 97.15-60 (i.e. TESTING OF FIRE DETECTORS AND BATTERY CHANGE, FIRE HOSE, NOZZLES & STATIONS, FIRE SUITS AND SCBA'S, RING BUOYS, LIFE RAFTS, LIFE JACKETS, WORK VESTS, etc.) 46 CFR 95.01-5
Due 15 September 2005
Resolved 27 January 2006
Personnel › Training › Familiarization Training
Issued 1 September 2005
Resolved
PROVIDE DOCUMENTATION (RESUME') FOR RELIEF VSO THAT HE MEETS QUALIFICATIONS OF 33 CFR 104.215.
Due 9 September 2005
Resolved 27 January 2006
Resolution: Received document.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 1 September 2005
Resolved
PROVIDE WRITTEN TRAINING MATERIAL REQUIRED BY 46 CFR 199.180(a).
Action required: 705 - Other - as specified
Due 2 March 2006
Resolved 12 December 2006
Resolution: completed.
Operations/Management › Drills/Instruction › Not Conducted
Issued 1 September 2005
Resolved
DEMONSTRATE TRAINING REQUIRED BY APPENDIX 5 OF THE VESSEL'S SOPEP (OIL POLLUTION PLAN) HAS BEEN PERFORMED FOR THE CURRENT QUARTER. PROVIDE SCHEDULE OF ALL DRILLS AND TRAINING REQUIRED FOR VESSEL AND WHEN THEY ARE REQUIRED. IDENTIFY CURRENT REVISION BY COMPANY, DATE OF ANNUAL AUDIT, AND DATE OF REQUIRED EXERCISE.
Due 22 September 2005
Resolved 27 January 2006
Resolution: Observed training records. New 835 for audits.
Operations/Management › Pollution › Control of Garbage
Issued 1 September 2005
Resolved
PROVIDE GARBAGE PROGRAM REQUIRED BY 33 CFR 151.
Due 9 September 2005
Resolved 27 January 2006
Resolution: Observed program and logs.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 1 September 2005
Resolved
PROVIDE EXPIRATION DATES ON DISPOSABLE LIFERAFT HYDROSTATIC RELEASES AND MAINTENANCE RECORD REQUIRED BY 46 CFR 199.190 AND 46 CFR 199.190(h)
Due 9 September 2005
Resolved 27 January 2006
Resolution: Observed.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 1 September 2005
Resolved
RENEW RETROREFLECTIVE (SOLAS IDENTIFIED) TAPE ON RING BUOYS WHERE NO LONGER SERVICEABLE.
Due 15 September 2005
Resolved 27 January 2006
Resolution: Observed.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 1 September 2005
Resolved
PROVIDE 48 USCG APPROVED TYPE I LIFE JACKETS WITH VESSEL NAME, CG APPROVED LIGHTS, ACCEPTABLE SOLAS IDENTIFIED RETROREFLECTIVE TAPE, AND A WHISTLE.
Due 22 September 2005
Resolved 27 January 2006
Resolution: Observed.
Operations/Management › Pollution › Control of Garbage
Issued 1 September 2005
Resolved
.
Due 9 September 2005
Resolved 1 September 2005
Personnel › Training › Familiarization Training
Issued 1 September 2005
Resolved
.
Due 6 September 2005
Resolved 1 September 2005
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 1 September 2005
Resolved
CONDUCT ANNUAL AUDIT OF SOPEP.
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 29 January 2007
Resolution: completed
Electrical › Electric Generation Source (service) › Generator
Issued 1 September 2005
Resolved
MAKE PROPER NOTIFICATION TO LOCAL OCMI OF REMOVAL OF SHIP SERVICE/EMERGENCY GENERATOR.
Condition: Unknown
Due 2 February 2006
Resolved 10 February 2006
Resolution: Received ltr dated this date.
Electrical › Electric Generation Source (service) › Generator
Issued 1 September 2005
Resolved
DISCONTINUE USE OF PORTABLE GENERATOR CAT XQ400, UNTIL THE INSTALLATION HAS RECEIVED CG PLAN APPROVAL.
Action required: 705 - Other - as specified
Resolved 14 March 2007
Resolution: Rcv''d letter dtd Jan 25, 2007 from [name withheld] of GLAKES Dredge indicating this generator has been installed on that vessel in place of an existing genset. Considered replacement in kind.
Electrical › Electric Generation Source (service) › Generator
Issued 1 September 2005
Resolved
DEMONSTRATE AUTOMATIC SHUT DOWN OF EACH GENERATOR PRIME MOVER UPON LOSS OF LUBRICATING PRESSURE TO THE GENERATOR BEARINGS IF THE GENERATOR IS DIRECTLY COUPLED TO THE ENGINE.
Action required: 705 - Other - as specified
Due 2 March 2006
Resolved 12 December 2006
Resolution: Administratively closed. Issued in error, generator bearing is a sealed bearing without oil pressure feed.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Overspeed Device
Issued 7 September 2004
Resolved
Prove proper operation of overspeed safety device on auxiliary and ship service generators.
Action required: 705 - Other - as specified
Due 10 October 2004
Resolved 12 December 2006
Resolution: Completed tests of all applicable shutdowns and alarms.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 7 September 2004
Resolved
Prove operation of all safety devices on the #1 & #2 pump engines.
Action required: 705 - Other - as specified
Due 10 October 2004
Resolved 12 December 2006
Resolution: Tested all safety devices, noted not required by USCG or ABS regs.
Lifesaving › Hand Flares › Quantity
Issued 8 July 2003
Resolved
Prior to operation, provide 12 (USCG approved) parachute flares.
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 August 2003
Resolved 9 July 2003
Lifesaving
Issued 6 June 2001
Resolved
Conduct an emergency fire and boat drill to the satisfaction of the attending U.S. Coast Guard Marine Inspector, no later than June 22, 2001.
Condition: Unknown
Due 6 June 2001
Resolved 6 June 2001
Documentation
Issued 24 May 2001
Resolved
PROVIDE CORRECTIONS TO THE VESSEL'S STABILITY BOOK TO REFLECT THE ADDITION OF THE NEW PEDESTAL CRANE AND HYDRAULIC OIL TANK.
Condition: Unknown
Due 30 June 2001
Resolved 1 October 2002
Resolution: Calculations submitted iaw 46 CFR 173.005 that demonstrated hook load generated by new pedestal crane unit does not generate a maximum heeling moment large enough to require compliance w/ 46 CFR 173.020. Thus, stability book does not need to be updated.
Documentation
Issued 7 August 2000
Resolved
Log all oil transfers in the oil record book as per the instructions in front of the Oil Record Book. Each trasfer operation to be signed by the company appointed engineer. The person in charge required by the COI is to sign each completed page.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Documentation
Issued 7 August 2000
Resolved
Provide a waste management plan and garbage log. 46 CFR 151.55 and .57.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Electrical
Issued 7 August 2000
Resolved
Renew battery for emergency lights on messdeck._x001C_
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Fire Fighting
Issued 7 August 2000
Resolved
Renew smoke detector in the starboard aft crew berthing._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Engineering
Issued 7 August 2000
Resolved
Renew one (1) inch pvc piping for the high pressure tank to the control airregulator, generator room port side. Use schedule 80 steel pipe or other material that meets 46 CFR 56.60.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Engineering
Issued 7 August 2000
Resolved
Prove proper operation of the oily water separator.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Fire Fighting
Issued 7 August 2000
Resolved
Proved new bracket for the co2 fire extinguisher in way of Leaver Room starboard side.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Fire Fighting
Issued 7 August 2000
Resolved
Provide new bracket for CO2 fire extinguisher forward bulkhead outside of galley.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Electrical
Issued 7 August 2000
Resolved
At next drydock renew electrical kick pipes in way of the starboard stern spud gantry.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Lifesaving
Issued 7 August 2000
Resolved
Renew retro-reflective tape on six lifejackets.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Accommodation/Occupational Safety
Issued 7 August 2000
Resolved
Renew the wasted Type II Marine Sanitation Device.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Construction/Loadline
Issued 1 August 1999
Resolved
Make permanent repairs to #7 stbd fuel tank in way of deck knuckle. Crack approximately 2 inches long parallel to knuckle.
Condition: Unknown
Due 19 August 1999
Resolved 19 August 1999
Electrical
Issued 4 June 1999
Resolved
PROVIDE EMERGENCY LIGHTING AT EXIT FOR BOW HOLE.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Lifesaving
Issued 4 June 1999
Resolved
ENSURE ALL RING LIFE BUOY LIFE LINES ARE READY FOR RELEASE.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Engineering
Issued 4 June 1999
Resolved
PROVIDE CG APPROVED MONITOR FOR OWS.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Lifesaving
Issued 4 June 1999
Resolved
PROVIDE COPY OF LIFE RAFT SERVICE REPORTS.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Documentation
Issued 4 June 1999
Resolved
PROVIDE LAST 1998 MIS FORM FOR DRUG PROGRAM AUDIT.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Lifesaving
Issued 4 June 1999
Resolved
PROVIDE COPY OF COAST GUARD APPROVED PLANS INDICATING CURRENT LIFE SAVING ARRANGEMENTS.
Condition: Unknown
Due 1 June 2000
Resolved 20 March 2003
Resolution: Wait for final draft copies of fire plan for approval.
Lifesaving
Issued 4 June 1999
Resolved
RENEW BRACKETS FOR SELF ACTIVATING SMOKE SIGNALS.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Documentation
Issued 4 June 1999
Resolved
PROVIDE PROPER FCC DOCUMENTATION FOR VESSEL RADIO INSTALLATION.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Electrical
Issued 18 August 1998
Resolved
Renew batteries in all emergency lights as needed throughout the vessel
Condition: Unknown
Due 18 September 1998
Resolved 27 April 1999
Lifesaving
Issued 18 August 1998
Resolved
PROVIDE ON BOARD 12 HANDHELD FLARES
Condition: Unknown
Due 18 September 1998
Resolved 27 April 1999
Lifesaving
Issued 18 August 1998
Resolved
Provide on board a satisfactory ring buoys for starboard bridge wing and port side second deck.
Condition: Unknown
Due 18 September 1998
Resolved 27 April 1999
Lifesaving
Issued 18 August 1998
Resolved
Provide on board 48 Coast Guard approved with lights and whistles in a properly marked storage box
Condition: Unknown
Due 18 September 1998
Resolved 27 April 1999
Documentation
Issued 18 August 1998
Resolved
Provide on board ABS Loadline document with annual endorsement
Condition: Unknown
Due 18 September 1998
Resolved 27 April 1999
Engineering
Issued 24 November 1997
Resolved
PRIOR TO CONDUCTING DREDGING OPERATIONS INSTALL AND PROVE PROPER OPERATION OF COAST GUARD CERTIFIED OILY WATER SEPARATOR.
Condition: Unknown
Due 24 November 1997
Resolved 24 November 1997
Accommodation/Occupational Safety
Issued 29 August 1997
Resolved
MAKE PERMANENT REPAIRS TO LIFELINES. REPLACE BROKEN LIFELINE STANCHIONS.
Condition: Unknown
Due 29 August 1997
Resolved 29 August 1997
Construction/Loadline
Issued 29 August 1997
Resolved
MAKE PERMANENT REPAIRS TO TRUNION BLOCK & STBD PONTOON BEFORE NEXT OPERATION.
Condition: Unknown
Due 29 August 1997
Resolved 29 August 1997
Construction/Loadline
Issued 29 August 1997
Resolved
MAKE TEMPORARY REPAIRS IWO STBD TRUNION BLOCK & STBD PONTOON PRIOR TO TRANSIT TO REPAIR FACILITY.
Condition: Unknown
Due 3 September 1997
Resolved 3 September 1997
Lifesaving
Issued 23 August 1997
Resolved
PROCEED DIRECTLY TO STATEN ISLAND, NY AND MAKE VESSEL AVAILABLE FOR COAST GUARD INSPECTION BY [name withheld] VESSEL MAY NOT OPERATED AS CERTIFICATEDVESSEL UNTIL COMPLIANCE W/ABOVE REQUIREMENT ASND NLT 277MAR98.
Condition: Unknown
Due 23 August 1997
Resolved 23 August 1997
Lifesaving
Issued 23 August 1997
Resolved
PROPERLY INSTALL LIFERAFTS (2 TOTAL) PRIOR TO DEPARTING STATEN ISLAND, NY.
Condition: Unknown
Due 23 August 1997
Resolved 23 August 1997
Electrical
Issued 27 March 1997
Resolved
MAKE PERMANENT REPAIRS TO MOTOR CONTROLLER CENTER TO ITS ORIGINAL "UL" STANDARDS.
Condition: Unknown
Due 27 March 1997
Resolved 27 March 1997
Electrical
Issued 27 March 1997
Resolved
PLACE WARNING NOTICES ON EACH "JURY RIGGED" MOTOR CONTROLLER AT CONTROLLER CENTER.
Condition: Unknown
Due 30 May 1997
Resolved 7 May 1997
Lifesaving
Issued 24 March 1995
Resolved
PROVIDE DOCUMENTATION FOR ANNUAL SERVICING FOR PORT FORWARD LIFERAFT IAW 46 CFR 97.15-45(F).
Condition: Unknown
Due 24 March 1995
Resolved 24 March 1995
Construction/Loadline
Issued 29 November 1993
Resolved
MAKE VESSEL AVAILABLE FOR INSPECTION INCLUDING INTERNAL SPACES. VESSEL MUST PROCEED DIRECTLY TO NY, MAY NOT COMMENCE AND OPERATIONS, AND MAY NOT ENTER ANY OTHER PORT.
Condition: Unknown
Due 29 November 1993
Resolved 29 November 1993
Engineering
Issued 2 March 1993
Resolved
PROVE PROPER OPERATION OF ALL PRESSURE VESSEL RELIEF VALVES.
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993
Electrical
Issued 2 March 1993
Resolved
PROVE PROPER OPERATION OF MAIN GENERATOR ALARM PANEL.
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993
Engineering
Issued 2 March 1993
Resolved
PROVIDE FOR INSPECTION (INTERNAL) ALL PRESSURE VESSELS.
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993
Electrical
Issued 2 March 1993
Resolved
INSTALL AND PROVIDE FOR INSPECTION REMOTE START/STOP SWITCH OUTSIDE ENCLOSURE FOR ELECTRICAL CONTROL PANEL IAW 46 CFR 111.103.
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993
Engineering
Issued 4 June 1992
Resolved
RENEW ALL HOT WATER HEATER TEMP/RELIEF VALVES TO <100 PSI/210 DEGREES F UNITS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Electrical
Issued 4 June 1992
Resolved
INSTALL ILLUMINATION FOR LIFERAFT STORAGE AREAS IN ACCORDANCE WITH 46 CFR 94.50-15._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Electrical
Issued 4 June 1992
Resolved
RENEW GENERATOR WIRING SCHEMATIC NAME PLATE ON SWITCHBOARD FRONT TO REFLECTCURRENT MACHINERY/GENERATOR CONFIGURATION._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Navigation
Issued 4 June 1992
Resolved
REPLACE HOUSEHOLD LIGHT BULBS IN NAVIGATION LIGHTS WITH APPROVED TYPE BULBS, WHERE APPLICABLE._x001C_
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Accommodation/Occupational Safety
Issued 19 March 1991
Resolved
REPAIR AS ORIGINAL LUBE OIL VENT WHERE WASTED AND WASTE OIL VENT. REMOVE DRESSER COUPLINGS.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Accommodation/Occupational Safety
Issued 19 March 1991
Resolved
MAKE TEMPORARY REPAIR TO OVERHEAD OF PORT AND STARBOARD BERTHING MODULES ONUPPER DECK AFT.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Accommodation/Occupational Safety
Issued 19 March 1991
Resolved
REPAIR OR REPLACE BERTHING MODULE DOORS WHERE WASTED.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Electrical
Issued 19 March 1991
Resolved
CONDUCT TEST OF MACHINERY SPACE EMERGENCY LIGHTS.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Engineering
Issued 19 March 1991
Resolved
CONDUCT TEST OF OILY WATER SEPERATOR TO COMPLETE IOPP EXAM.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Electrical
Issued 19 March 1991
Resolved
CONDUCT TEST OF COLD PLANT GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Electrical
Issued 19 March 1991
Resolved
PROVIDE BATTERY BOXES 3 EA. FOR MACHINERY SPACE EMERGENCY LIGHTS AND COLD PLANT GENERATOR.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Electrical
Issued 19 March 1991
Resolved
REPAIR ELECTRICAL WIRING TO SOLENOID ON FWD BRIDGE DECK AIR COMPRESSOR MOTOR.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Engineering
Issued 19 March 1991
Resolved
SUBMIT PLANS FOR APPROVAL FOR INSTALLATION OF OIULY WATER SEPARATOR VIA [name withheld] TO THE MARINE SAFETY CANTER, WASHINGTON D.C.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Accommodation/Occupational Safety
Issued 19 March 1991
Resolved
PROVE PROPER OPERATION OF ALL AIR FLASK RELIEF VALVES.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Electrical
Issued 19 March 1991
Resolved
CONDUCT TEST OF GENERATORS REVERSE CURRENT RELAY.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Electrical
Issued 19 March 1991
Resolved
REPAIR MAIN GENERATOR (500KW) TACHOMETER.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Engineering
Issued 19 March 1991
Resolved
REMOVE PET COCKS FROM RACOR FILTERS ON ALL ENGINES AND REPLACE WITH PLUGS.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Engineering
Issued 19 March 1991
Resolved
INSTALL OILY WATER SEPARATOR.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Lifesaving
Issued 19 March 1991
Resolved
PROVIDE LIGHTS AND WHISTLES ON 7 CLASS 1 PFD'S. LIMIT ROUTE TO COASTWISE UNTIL ITEMS ARE PROVIDED.
Condition: Unknown
Due 19 March 1991
Resolved 19 March 1991
Fire Fighting
Issued 18 May 1990
Resolved
PROVIDE LIST OF MATERIAL AND FIRE EXTINGUISHER SYSTEM PLANS FOR PAINT LOCKER TO LOCAL MARINE SAFETY OFFICE OR MARINE SAFETY CENTER WASHINGTON, DCFOR THEIR REVIEW.
Condition: Unknown
Due 18 May 1990
Resolved 18 May 1990
Construction/Loadline
Issued 30 March 1989
Resolved
PROVIDE VENT COVER FORWARD QUARTERS HEAD STBD SIDE BELOW LEVER ROOM.
Condition: Unknown
Due 30 March 1989
Resolved 30 March 1989
Electrical
Issued 30 March 1989
Resolved
REMOVE DEADEND CABLE IN OVERHEAD OUTSIDE MARINE SEWAGE PROCESSING(MSD)SPACE
Condition: Unknown
Due 30 March 1989
Resolved 30 March 1989
Fire Fighting
Issued 30 March 1989
Resolved
UPDATE VESSELS FIRE SAFETY PLAN WITH INFORMATION REQUIRED BY 46 CFR 97.36-1AND SUBMIT TO A OCMI FOR REVIEW AND APPROVAL.
Condition: Unknown
Due 30 March 1989
Resolved 30 March 1989
Fire Fighting
Issued 30 March 1989
Resolved
POST COPIES OF THE FIRE PLAN IN A CONSPICIOUS PLACE.
Condition: Unknown
Due 30 March 1989
Resolved 30 March 1989
Lifesaving
Issued 30 March 1989
Resolved
MARK VESSELS NAME ON ALL PERSONAL FLOATATION DEVICES.
Condition: Unknown
Due 30 March 1989
Resolved 30 March 1989
Construction/Loadline
Issued 30 March 1989
Resolved
PROVIDE NEW WATERTIGHT DOOR TO SPUD ROOM STBD SIDE AFT.
Condition: Unknown
Due 30 March 1989
Resolved 30 March 1989
Navigation
Issued 8 April 1988
Resolved
PROVIDE NAVIGATION LIGHTS MEETING THE REQUIREMENTS OF COL REGS, U. L. 1104 AND 46 CFR 111.75-17.
Condition: Unknown
Due 8 April 1988
Resolved 8 April 1988
Fire Fighting
Issued 8 April 1988
Resolved
PROVIDE FIREHOSE MEETING THE REQUIREMENTS OF 46 CFR 95 10-10 (K) FOR TYPE OF THREADS, AND NOZZLES OF THE SAME THREAD TYPE. ALL FIREHOSE AND NOZZLES ARE TO BE OF THE SAME THREAD TYPE.
Condition: Unknown
Due 8 April 1988
Resolved 8 April 1988
Unknown
Issued 4 April 1984
Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO THE VESSEL ALASKA,DN283416
Condition: Unknown
Due 4 April 1984
Resolved 4 April 1984
Construction/Loadline
Issued 4 April 1984
Resolved
VESSEL MAY NOT BE USED UNTIL AFTER QUARTERS MODULES ARE REMOVED AND VESSEL IS RETURNED TO ORIGINAL CONDITION AT TIME OF LAST COI BY USCG.
Condition: Unknown
Due 4 April 1984
Resolved 4 April 1984