Records from 1993 to 2025. Most recent: inspection, 17 October 2025.
Documentation record
Registered dimensions (L × B × D)90.9 ft × 30.0 ft × 12.2 ft
Registered tonnagegross 193 / net 131
ITC dimensions (L × B × D)90.9 ft × 30.0 ft × 12.2 ft
ITC tonnagegross 236 / net 70
BuilderMARICO MARINE INDUSTRIES · BALDWIN, LA, UNITED STATES · built 1975
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portHOUMA, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 6 January 2026 · expires 31 January 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it236 - Convention (Subpart B), Gross Ton
193 - Regulatory (Subpart C or D), Gross Ton
70 - Convention (Subpart B), Net Ton
131 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 28
17 October 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8249927
2 October 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8247223
29 October 2024
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8026429
21 October 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8022119
19 October 2024
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8023449
5 July 2024
Administrative Inspection · Internal Structural Exam · Drydock Exam · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7949968
3 October 2023
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7802580
29 August 2023
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7781962
11 October 2022
Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7575257
24 June 2021
Administrative Inspection · Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7234501
14 May 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6414006
25 July 2017
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6221203
19 February 2016
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5832571
12 March 2015
MTSA/ISPS Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5091496
30 October 2012
Industry Initiated Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4488422
30 December 2011
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4217669
19 October 2009
Industry Initiated Exam · MTSA Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3617374
31 January 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3139677
19 December 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3130829
12 April 2006
Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2623340
22 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1973013
22 July 1996
Uninspected Towing Vessel
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1248453
13 September 1994
Inclining Experiment
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1409173
26 August 1994
Inclining Experiment
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 865642
26 September 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 178828
4 June 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 124277
17 March 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 74163
17 March 1993
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 504238
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 October 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions.
It was reported that a cooling water pipe for the main generators running through a fuel tank was damaged, causing contamination of fuel, and leading to a loss of power.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 November 2024
Resolution: Issued found to be untighten flange. Tightened flange and test ran, all sat.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 21 October 2024
Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. It was reported that the vessel sustained structural damage due to contact made with the barge in tow.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 November 2024
Resolution: Repairs completed, included into documents NDT report.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 21 October 2024
Resolved
Tugs, under 200 feet (61 meters) in length, shall have at least one anchor of one-half the tabular weight listed in the applicable standards. It was reported that the vessel currently unable to deploy its anchor.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 November 2024
Resolution: Received photo of anchor onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 October 2023
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be
fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. Vessels stbd side fuel shutoff valve failed to operate.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 October 2023
Resolved 5 October 2023
Resolution: Valve tested satisfactorily.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 October 2023
Resolved
A 40–B portable fire extinguisher must be located near the paint storage room or cabinet. Extinguisher found near the paint locker was a 10:B.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 4 October 2023
Resolved 4 October 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 October 2023
Resolved
Individual circuit breakers on switchboards and distribution panels must be labeled with a description of the loads they serve. Breaker panel in engine romm was not properly labeled.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 4 October 2023
Resolved 4 October 2023