Records from 1991 to 2026. Most recent: inspection, 9 February 2026.
Inspection history · 84
9 February 2026
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 8308636
15 December 2017
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6325933
16 February 2017
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6227568
26 April 2016
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5872518
4 February 2015
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5142153
14 April 2014
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4833333
20 November 2013
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4757004
20 November 2013
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4757449
24 June 2013
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4631030
22 August 2012
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4418935
18 May 2012
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4317652
13 February 2012
Drydock Exam · Internal Structural Exam · COI Inspection · Cargo Tank Internal
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4243373
28 September 2011
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4166583
1 August 2011
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4101855
22 July 2011
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4090513
27 December 2010
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3916446
23 September 2010
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3917486
2 July 2010
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3783278
9 June 2010
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3762212
6 January 2010
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3659497
28 August 2009
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3579205
13 August 2009
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3622591
19 March 2009
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3436584
4 March 2009
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3427558
4 February 2009
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3412340
20 January 2009
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3396817
8 January 2009
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3390887
12 December 2008
Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3381305
3 September 2008
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3316903
29 August 2008
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3321609
20 August 2008
Periodic Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3304052
6 December 2007
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3110614
8 August 2007
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3054946
29 December 2006
Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2854566
2 September 2006
COI Inspection · Hull Examination · MTSA Verification · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2766467
27 July 2006
MTSA Verification · Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2564877
23 November 2005
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2539939
1 June 2005
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2375426
9 May 2005
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2351281
30 April 2005
Permit to Proceed
Administrative · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2346255
14 September 2004
MTSA Verification · Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2232945
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1986426
5 August 2003
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1859656
5 August 2003
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1901872
13 July 2003
Permit to Proceed
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1844800
13 July 2003
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1852745
18 March 2003
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1758858
4 June 2002
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1633439
22 August 2001
Hull Examination · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1453918
12 April 2001
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1064707
22 November 2000
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 448372
20 May 2000
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1052140
30 November 1999
Damage Survey
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 812510
2 May 1999
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1127140
11 March 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 94492
20 May 1998
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 794413
20 May 1998
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1126065
12 May 1998
Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1437404
11 May 1998
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 20817
2 January 1998
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1118727
24 December 1997
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 20371
24 December 1997
Permit to Proceed · Examination of Repairs · Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1436022
23 December 1997
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 10753
23 December 1997
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 18480
23 December 1997
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 224936
16 June 1997
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 774954
3 July 1996
COI Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1089588
9 June 1995
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 37190
26 May 1995
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 873189
17 May 1994
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 859659
30 July 1993
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1156759
28 May 1993
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 836505
13 April 1993
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 517492
21 May 1992
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1263595
11 March 1992
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 643177
29 February 1992
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1269247
28 February 1992
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 84679
28 February 1992
Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1266797
5 February 1992
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1255781
19 January 1992
Damage Survey
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 943641
18 January 1992
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 166308
25 September 1991
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 500845
6 September 1991
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1000655
24 June 1991
Hull Examination · Initial Construction-Excluding Oversight · Initial Certification
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1248917
Construction/Loadline › Hull › Double Hull
Issued 20 November 2013
Resolved
Vessel was damaged while attempting to moor. Damaged occurred on the starboard quarter rear rake. Extent of damage was a 3' split weld on the upper deck, 2' split weld on the starboard side of the upper deck. With 2 vertical cracks going down from the stern. one crack approx. 2 1/2' and the other 9"
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 20 December 2013
Resolved 26 November 2013
Resolution: All repairs completed to the satisfaction of the attending Marine Inspector.
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 22 August 2012
Resolved
Cargo Tank Vertical and Horizontal stiffiners wasted.
Action required: 705 - Other - as specified
Due 22 August 2012
Resolved 22 August 2012
Resolution: Examined (5) 14" X 5'' 6" vertical stiffeners and (1) 10'' X 2 foot 6" horizontal stiffener and (1) 43" X 2 foot 6" horizontal stiffeners in way of Cargo tank. Air tested for tightness.
Construction/Loadline › Structures › Trunk
Issued 18 May 2012
Resolved
O/O identified wastage to the #3 port cargo tank top/aft. Repair facility to cut out 18" x 18" plate and replace with insert.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 May 2012
Resolved 21 May 2012
Resolution: Examined final repair and witnessed air test - All SAT.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 28 September 2011
Resolved
Make permanent repair to stripping line on the main deck in the machinery area. Line is not to be used with temporary repair.
Action required: 705 - Other - as specified
Due 27 October 2011
Resolved 14 February 2012
Resolution: Repairs made to stripping line to the satisfaction of the attending Marine Inspector
Deck/Cargo › Cargo Stowage › General
Issued 22 July 2011
Resolved
There is a 2 foot fracture in the #1 port cargo tank top. A temporary repair has been made. Permanently repair prior to loading cargo.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 August 2011
Resolved 1 August 2011
Resolution: Vessel Crop/renew 2''x 2'' section of #1 cargo tank . Repair was air and soap tested to 1 lbs satisfactory.
Stability › Watertight Integrity › General
Issued 9 June 2010
Resolved
fracture in #3P void, #4S void and port sideshell of forepeak.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 July 2010
Resolution: Examined welds and witnessed satisfactory air test of a 3'' x 5.5'' x 1/2" bilge knuckle insert to the #3 port wing void and a 5.5'' x 8'' x 1/2" bilge knuckle insert to the #4 stbd wing void.
Construction/Loadline › Hull › Double Hull
Issued 4 February 2009
Resolved
Vessel reports 1/2" x 1/8" fracture in knuckle #2 stbd wing tank first frame after hatch.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 March 2009
Resolved 4 March 2009
Resolution: Conducted repair check. Examined welds and witnessed satisfactory air test of 5.5''x12''x1/2" section of transition knuckle in way of #1 and #2 stbd wing void, as well as a 2''x3''x3/8" section of the watertight bulkhead. Examined welds and witnessed sa
Construction/Loadline › Hull › Sheerstrake
Issued 8 January 2009
Resolved
Apply temporary repair to starboard/aft upper corner of stern rake to make watertight the 18 inch fracture in way of the deck to sideshell weld seam. Vessel allowed to transit to Houma, La. to discharge cargo, thence to Port Arthur, Tx to effect permanent repairs. Repairs to be made to the satisfaction of cognizant OCMI.
Condition: Unknown
Action required: 703 - Prior to bunkering operations
Resolved 20 January 2009
Resolution: Welded up corner wrapper. Air test of stern box, Sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 3 September 2008
Resolved
Issued deficiency for repair to stripping line. The repair is considered to be a long-term temporary repair and not a permanent repair. Permanent repair to stripping line to be completed prior to the next annual exam.
Condition: Unknown
Due 27 October 2009
Resolved 20 January 2009
Resolution: Replace piping with new. Air Test Sat
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 29 August 2008
Resolved
Pin hole leak in cargo stripping line near header pipe. Place temp patch on and proceed to shipyard in Port Author to effect permanent repairs to satisfaction of attending marine inspector prior to conducting cargo operations.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 September 2008
Resolution: Observed temporary repair to stripping line. Issued another deficiency to have permanent repairs completed prior to next annual inspection.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 20 August 2008
Resolved
Transfer Hose was not marked with the type of service it is intended for.
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 August 2008
Resolved 20 August 2008
Resolution: Vessel Operator stenciled hose service onto the hose.
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 20 August 2008
Resolved
Machinery Guard on cargo stripping pump was loose
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 August 2008
Resolved 20 August 2008
Resolution: Machinery Guard was reattached.
Construction/Loadline › Hull › Hull Plating
Issued 30 April 2005
Resolved
Vessel sustained an approx 1.5 inch crack on bilge knuckle in #2 port void. Temporary cement patch installed. Vessel issued PTP to go to Gonzales, Florida, discharge cargo, and then return to NOLA for permanent repairs.
Condition: Unknown
Due 30 May 2005
Resolved 12 May 2005
Resolution: Performed air test of repairs; all sat.
Construction/Loadline › Hull
Issued 13 July 2003
Resolved
ISSUED PERMIT TO PROCEED TO REPAIR AN APPROX 1 INCH BY 8 INCH PUNCTURE IN THE FORWARD RAKE, PORT AFT PORTION, TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR. LEGACY COMPONENT DESC: Hull Plating
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 August 2003
Resolved 5 August 2003
Resolution: Conducted repair check and air test port tow knee, bottom plating 1/2" X 34'' X 10; damaged internal framing, port transition knuckle 15'' X 3'' X 1/2", all sat.
Construction/Loadline › Hull › Bottom Plating
Issued 18 March 2003
Resolved
Port bow transitioin knuckle crushed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2003
Resolution: 4'' x 7'' x 1/2" transition knuckle insert.
Construction/Loadline
Issued 30 November 1999
Resolved
1. CROP OUT & RENEW APPROX 4'BY 7' BY 1/2" OF TRANSITIONAL KNUCKLE LOCATED ON STBD SIDE OF FORWARD RAKE 7 FEET AFT OF THE HEADLOG._x001C_ 2. CROP OUT & RENEW APPROX 18" BY 4' BY 1/2" OF TRANSITIONAL KNUCKLE LOCATED ON PORT SIDE OF FORWARD RAKE 12 FEET AFT OF THE HEADLOG.
Condition: Unknown
Due 2 December 1999
Resolved 3 December 1999
Construction/Loadline
Issued 12 May 1998
Resolved
REPAIR ALL DAMAGE TO THE BOW RAKE HEADLOG ON THE STBD CORNER. REPAIRS ARE TO BE MADE TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 12 May 1998
Resolved 12 May 1998
Construction/Loadline
Issued 24 December 1997
Resolved
PROCEED TO TEXAS CITY, TX TO OFFLOAD BARGE & PROCEED TO HOUSTON, TX FOR PERM REPAIRS. SURVEY BARGE BOW RAKE & MAKE ALL NECESARY REPAIRS. GAS FREE BARGE & MAKE READY FOR INTERNAL INSPECTION. REPAIRS TO BE COMPLETE PRIOR TOONLOADING NEXT CARGO, BUT NLT 05JAN98.
Condition: Unknown
Due 2 January 1998
Resolved 14 January 1998
Deck/Cargo
Issued 28 February 1992
Resolved
MAKE PERMENANT REPAIRS TO 8" FRACTURE LOCATED NO. 1 PORT CARGO TANK RAISED TRUNK FORWARD OUTBOARD, IN WAY OF HORIZONTAL WELD SEAM PRIOR TO DEPARTING THE PORT OF HOUSTON, TEXAS.
Condition: Unknown
Due 28 February 1992
Resolved 28 February 1992
Construction/Loadline
Issued 19 January 1992
Resolved
MAKE PERMANENT REPAIRS TO THE SET IN AND DAMAGED AREA OF STERN VOID.
Condition: Unknown
Due 19 January 1992
Resolved 19 January 1992
Documentation
Issued 24 June 1991
Resolved
PROVIDE CERTIFICATE OF FINANCIAL RESPONSIBILITY._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 24 June 1991
Resolved 24 June 1991
Construction/Loadline
Issued 24 June 1991
Resolved
COMPLETE PAINTING OF HULL MARKING AND WARNINGS AS REQUIRED. _x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 24 June 1991
Resolved 24 June 1991
Documentation
Issued 24 June 1991
Resolved
PROVIDE OIL TRANSFER PROCEDURES._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 24 June 1991
Resolved 24 June 1991
Deck/Cargo
Issued 24 June 1991
Resolved
COMPLETE INSTALLATION OF THE VAPOR RECOVERY SYSTEM IN ACCORDANCE WITH APPROVED PLANS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 24 June 1991
Resolved 24 June 1991