Records from 2016 to 2026. Most recent: inspection, 8 May 2026.
Documentation record
Registered dimensions (L × B × D)65.0 ft × 24.0 ft × 7.0 ft
Registered tonnagegross 73 / net 58
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGULF CRAFT, INC. · PATTERSON, LA, UNITED STATES · built 1992
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 July 2026 · expires 31 August 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it73 - Simplified, Gross Ton
58 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 9
8 May 2026
Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8369286
31 March 2025
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8095217
17 February 2023
Internal Structural Exam · Examination of Repairs · Drydock Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7885777
30 August 2021
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7340212
14 April 2021
Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7166150
6 March 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6916270
2 April 2019
Examination of Repairs · Annual Inspection · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6654438
2 January 2018
Examination of Repairs · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6331337
30 September 2016
Deficiency Check · Examination of Repairs · Drydock Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6009889
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 March 2024
Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. the shutoff valve at the tank shall be operable from outside the tank compartment. Shutoff valve was found inoperable. Repair to the satisfaction of the attending MI.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 March 2024
Resolution: Received evidence of installing new shutoff valve.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 February 2023
Resolved
The ring life buoy shall be so placed as to be readily accessible .It shall be capable of being cast loose, shall not be permanently secured in any way, and shall have attached to it a line of at least 60 feet in length. The line on the ring buoy on board the vessel was not 60 feet. Line needs to be replaced to meet the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 April 2024
Resolved 29 March 2024
Resolution: Received evidence of them installing new line on ring buoy.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 April 2021
Resolved
46CFR182.05-1 - 60C - Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operationg at constant marine load under requirements without exceeding its designed limitations. Vessel's center main diesel engine was unable to start in the presence of inspector's.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 14 April 2021
Resolved 15 June 2021
Resolution: Witnessed satisfactory operation of center MDE.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 April 2021
Resolved
46CFR 182.25-1 - 60C - All vessels shall be provided with a satisfactory arrangement for draining any watertight compartments other than small buoyancy compartments, under all practical conditions. Vessel's installed bilge pump was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 14 April 2021
Resolved 15 June 2021
Resolution: Vessel replaced old bilge pump. Bilge pump operated satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 April 2021
Resolved
46CFR177.35-15 - 50C - Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. Operation of the bilge pump has nearby rotating machinery hazards (STBD MDE).
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 15 June 2021
Resolution: Vessel replaced old bilge pump with new pump that with remote operation at the console, which removed the hazard of nearby rotating machinery to the controls.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 14 April 2021
Resolved
46CFR177.10-5 - 50C - The general construction of the vessel shall be such as to minimize fire hazards insofar as practicable. Dogging device on watertight hatch from main deck to the engine room was broken rendering hatch unable to seal properly.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 15 June 2021
Resolution: Hatch closure device repaired/replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 April 2021
Resolved
46CFR183.01-15 - 60C - All electrical installation shall be to the satisfaction of the Officer in Charge, Marine Inspection. Vessel's starting batteries had 2 inches of standing water and oil mixture in tray holding batteries.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 15 June 2021
Resolution: Battery trays drained and cleaned.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 April 2019
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. Starter batteries for found drained and unable to start engines.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 19 April 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 2 April 2019
Resolved
Multiple leaks in engine room overhead. Water leaking onto engines and associated equipment. Bilges must be free and clear during inspection. Vessel restricted from operations until ready for inspection and proof of satisfactory operation of all machinery.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 April 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 April 2019
Resolved
A vessel must be provided with a main steering gear that is of adequate strength and capable of steering the vessel at all service speeds. Cotter pins and bolts found missing/loose on steering gear in lazarette.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 19 April 2019
Fire Fighting › Fire Pumps › Pressure
Issued 4 June 2018
Resolved
Fire pump not operable
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2018
Resolved 14 June 2018
Resolution: Replaced inpeller on pump and tested with satisfactory results.
Engineering › Bilge Water Management System › Manifold
Issued 4 June 2018
Resolved
Active leak in bilge manifold
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2018
Resolved 14 June 2018
Resolution: Corrected leaks by adjusting loose fittings on the manifold. System was tested for leaks with satisfactory results.
Engineering › Bilge Water Management System › Piping
Issued 4 June 2018
Resolved
Fwd compartment bilge line has flexible piping connecting steel pipe from bulkhead to bilge suction piping, flexible piping connection is required to have (2) clamps on each end.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2018
Resolved 14 June 2018
Resolution: Two hose clamps were installed on both sides of the flexible hose.
Navigation › Piloting/Steering › Notices to Navigation
Issued 4 June 2018
Resolved
Need updated notice to mariners
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2018
Resolved 14 June 2018
Resolution: Company provided up to date Notice to Mariners.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 4 June 2018
Resolved
Need tide/current tables applicable to route.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2018
Resolved 14 June 2018
Resolution: Company provided a current tide/current tables.
Engineering › Lubricating Oil Storage/Transfer System › Drain Tank
Issued 4 June 2018
Resolved
leaking sight glass on hydraulic tank; corrected on the spot.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 4 June 2018
Resolved 4 June 2018
Resolution: Corrected on the spot
Documentation › Certificates/Documents › Certificate of Inspection
Issued 4 June 2018
Resolved
Vessels COI anniversary date is Jan 6, conducted annual inspection on June 4, more than (3) months past anniversary date.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 4 June 2018
Resolved 14 June 2018
Resolution: Company personnel was made aware of the regulation and the importance of conducting the inspections on their vessels on time.