Records from 2016 to 2026. Most recent: inspection, 15 January 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 27
15 January 2026
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8296140
3 November 2025
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8264032
4 April 2025
Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8104805
11 December 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8045551
10 April 2024
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7892263
12 December 2023
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7838109
1 May 2023
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7678715
30 March 2023
Internal Structural Exam · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7659562
2 December 2022
Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7600430
10 August 2022
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7530890
7 June 2022
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7476562
19 April 2022
Deficiency Check · Annual Inspection · Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7430377
7 March 2022
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7407444
22 January 2021
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7127971
4 December 2020
Drydock Exam · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7105640
1 June 2020
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6965207
21 May 2020
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6955001
16 March 2019
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6938183
11 March 2019
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6639883
2 January 2019
Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6604681
24 April 2018
Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6397569
22 February 2018
Construction Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6359386
18 April 2017
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6126008
24 March 2017
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6199092
1 February 2017
Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6080241
18 February 2016
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5819866
11 February 2016
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5807958
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 April 2025
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Fuel oil leak on center main diesel engine. Corrected on the spot. (46 CFR 182.100)
Action required: 10 - Deficiency Rectified
Due 4 April 2025
Resolved 4 April 2025
Resolution: Tightened bolt, leak resolved; corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 April 2025
Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 2 inches high: "EMERGENCY EXIT, KEEP CLEAR", unless such markings are deemed unnecessary by the cognizant [name withheld] escape ladder in engine room missing lettering. (46 CFR 185.606)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2025
Resolved 9 April 2025
Resolution: Cleared by photo of added lettering to escape ladder.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 4 April 2025
Resolved
The stability letter must be posted under glass or other suitable transparent material, such that all pages are visible, at the operating station of the vessel. Last page of stability letter was not posted. (46 CFR 176.306)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2025
Resolved 9 April 2025
Resolution: Cleared by photo of posting last page of stability letter at operating station.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 4 April 2025
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible. Navigation charts on board are not the most up to date. (46 CFR 184.420(a)(1))
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2025
Resolved 9 April 2025
Resolution: Cleared by photo of purchased Navigation Paper charts, dated 4/3/2025.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 4 April 2025
Resolved
Each ring life buoy on a vessel must: (1) Be approved in accordance with 46 CFR 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.150. White life buoy on top deck missing approval number from sticker. (46 CFR 180.70(b)(1))
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2025
Resolved 16 April 2025
Resolution: Cleared by photo of new white ring buoy with approval number on sticker clearly visisble.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 4 April 2025
Resolved
Each life jacket, immersion suit, and ring life buoy must be marked in clearly legible block capital letters with the vessel's name. Two ring buoys missing letters in vessel's name; Orange ring buoy on fwd main deck, corrected on the spot. White ring buoy on top deck still missing letters. (46 CFR 185.604(b))
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2025
Resolved 16 April 2025
Resolution: Cleared by photo of new white ring buoy with vessel name.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 4 April 2025
Resolved
Electrical equipment exposed to corrosive environments must be of suitable construction and corrosion-resistant. Exposed extension cord from vent duct near port bow. Corrected on the spot. (46 CFR 183.210)
Action required: 10 - Deficiency Rectified
Due 4 April 2025
Resolved 4 April 2025
Resolution: Extension cord removed; corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 April 2025
Resolved
Each nozzle must be of corrosion-resistant material and be capable of being changed between a solid stream and a spray pattern. A nozzle [...] on a vessel of more than 65 ft in length, must (1) Be of a type approved in accordance with approval series 162.027; or (2) Be of a type recognized by the Commandant as being equivalent in performance. Stbd top deck firehose nozzle missing approval marking. (46 CFR 181.320(d))
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2025
Resolved 11 April 2025
Resolution: Witnessed operation of original CG approved nozzle installed. Minimal leaks; provides adequate pressure and efficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 April 2024
Resolved
46 CFR 54.15-10(a): All safety and relief valves for use on pressure vessels or piping systems shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the “maximum allowable working pressure” of the pressure vessel or piping system. The pressure relief valves were unable to be tested to ensure they relieved at the designed pressure.
Action required: 705 - Other - as specified
Due 17 April 2024
Resolved 17 April 2024
Resolution: Changed out pressure relief valves. Approved via photos by lead [name withheld] attached photos.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 22 April 2022
Resolved
Vessel operator is to verify the seaworthiness and watertight integrity of the bottom plate in way of the temporary repairs made under the MSD tank, the galley bilge void, and the storage void prior to getting underway with passengers until permanent repairs have been made. A record of these inspections shall be entered into the vessel's official logbook and shall be made available for inspection upon request by duly authorized representatives of the Coast Guard.
Action required: 705 - Other - as specified
Resolved 7 February 2023
Resolution: Completed credit dry dock
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 22 April 2022
Resolved
Vessel operator is to schedule a Coast Guard marine inspector to examine the bottom plate in way of the temporary repairs made under the MSD tank, the galley bilge void, and the storage void during the first week of every month until permanent repairs have been made.
Action required: 705 - Other - as specified
Resolved 7 February 2023
Resolution: Completed credit dry dock
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 22 April 2022
Resolved
Repairs to the hull that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] repairs to the wasted bottom plate identified during the vessel's annual inspection dated 19 April 2022, shall be made to the satisfaction of the OCMI no later than the next scheduled drydock, January 31, 2023.
Action required: 705 - Other - as specified
Resolved 7 February 2023
Resolution: Completed credit dry dock
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 19 April 2022
Resolved
Observed significant pitting in excess of 1/4 inch depth IWO bilge suction in galley bilge void, storage void and pitting located under MSD tank. Submit repair proposal to satisfaction of marine inspectors.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2022
Resolved 22 April 2022
Resolution: Inspected temporary repairs and briefed CID.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 19 April 2022
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: charts of large enough scale to make safe navigation posisble. Charts are outdated. 46CFR184.420(a)(i)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2022
Resolved 22 April 2022
Resolution: Vessel had onboard up to date nautical charts.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 April 2022
Resolved
Be approved in accordance with 160.050 in subchapter Q of this chapter, or other standard specified by the commandant. Each ring life buoy must be marked with Type II retroreflective material. Life buoy on bow needs to replace retroreflective tape.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2022
Resolved 22 April 2022
Resolution: RLB retro-reflective tape renewed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 January 2021
Resolved
46CFR177.600(a) :
Each distribution panel or switchboard must be totally enclosed and of the dead front type. Distribution panel A door off hinge and missing latch.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2021
Resolved 8 February 2021
Resolution: Distribution panel A hinge replaced and latch added.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 22 January 2021
Resolved
46CFR183.432(b):
Emergency lighting, must automatically actuate upon failure of the main lighting system. Emergency lighting did not actuate after disconnect of power.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2021
Resolved 8 February 2021
Resolution: Emergency lighting batteries replaced and did actuate after disconnect of power.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 May 2020
Resolved
Wiring joints and splices shall be mechanically secure and made in junction boxes. Found temporary connection pulled from the Power Oil Change Pump in the engine room
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 4 June 2020
Resolved 1 June 2020
Resolution: Operator secured temporary connection from the Power Oil Change Pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 May 2020
Resolved
Individual bilge suction line shall be provided with a check valve at some accessible point in the bilge line. Found that the check valve in the bilge system for the galley space was causing back flow.
Action required: 10 - Deficiency Rectified
Due 4 June 2020
Resolved 1 June 2020
Resolution: Operator repaired check valve and MI inspected check valve did not flow back into the gally space.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 21 May 2020
Resolved
As appropriate for the intended voyages, all vessels must carry adequate and up-to-date: (a) Charts, (b) Sailing directions, (c) Coast Pilots, (d) Light Lists, (e) Notice to Mariners, (f) Tide Tables, (g) Current Tables, (h) All other nautical publications necessary. The paper charts for the vessels AOR were out of date.
Action required: 10 - Deficiency Rectified
Due 21 June 2020
Resolved 1 June 2020
Resolution: Operator provided new charts for AOR, dated May 12,2020.
14 - Pollution Prevention › 145 - MARPOL Annex V › Other (MARPOL Annex V)
Issued 21 May 2020
Resolved
A vessel with installed toilet facilities must have a marine sanitation device that complies with 33 CFR part 59. Found the Marine Sanitation Device (MSD) overboard check valve, on starboard side, had excessive corrosion.
Action required: 10 - Deficiency Rectified
Due 21 June 2020
Resolved 1 June 2020
Resolution: Operator discovered chemicals dripping from an above cabinet was causing the corrosion on the check valve. Operator cleaned check valve of chemicals.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 May 2020
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Found distribution panel in the galley space had missing blank at the bottom of the panel.
Action required: 10 - Deficiency Rectified
Due 21 June 2020
Resolved 1 June 2020
Resolution: Operator secured distributon panel in galley space with a new blank in the bottom of the panel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 May 2020
Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5°C (150°F) must be suitably insulated where necessary to prevent injuries. Found lagging on the port side engine exhaust pipe loose and exposing the metal surface.
Action required: 10 - Deficiency Rectified
Due 21 June 2020
Resolved 21 May 2020
Resolution: owner/operator corrected issue on the spot
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 11 March 2019
Resolved
Found water level coolant gauge bracket on port main diesel engine broken. The gauge was held up by two zip ties.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2019
Resolved 16 March 2019
Resolution: Received pictures with gauge properly mounted using new bracket.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 11 March 2019
Resolved
Coast Pilot and Light List out of date
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2019
Resolved 16 March 2019
Resolution: Received picture of current light list and coast pilot on board.
Engineering › Bilge Water Management System › Pump
Issued 25 April 2018
Resolved
Vessel has temporary bilge pump installed. Vessel requried to replace engine driven bilge pump in kind and prove satisfactory operation to attending Coast Guard Marine Inspector within 7 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 May 2018
Resolved 1 May 2018
Resolution: Inspected vessels engine driven bilge pump, said pump was replaced in kind and was pumping 60 GPM sucessfully dewatering the forepeak and lazarette with no descrepancies.
Engineering › Bilge Water Management System › Pump
Issued 24 April 2018
Resolved
Vessels bilge pump drien off main engine is not pumping/failed. Prove proper operation of second power bilge pump prior to carrying passangers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2018
Resolved 25 April 2018
Resolution: Vessel used PVC pipe to tie temporary pump into manifold system. Vessel successfully dewatered forepeak using temporary pump. Cleared CG-835 with restriction of all crew members must have training on temporary pump and written procedures shall be placed n
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 24 April 2018
Resolved
Found two 1/4" holes in the bulkhead between the engine room and lazarette roughly 1/4" above the deck below center shaft log. Make temporary repairs and prove water tight to the satisfaction of the attending coast guard marine inspector. Temporary repairs will need to be permanent during next scheduled dry dock.46 CFR 171.114 old sub "T"
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2018
Resolved 25 April 2018
Resolution: Vessel repaired two 1/4" holes in the bulkhead between the engine room and lazarette using two bolts and 3M 5200. Vessel proved watertight through air lance. Vessel will make repairs during next scheduled dry dock.
Operations/Management › Drills/Instruction › Not Conducted
Issued 24 April 2018
Resolved
Vessel unable to complete required drills for annual inspection. Complete drills required for annual inspection to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2018
Resolved 25 April 2018
Resolution: Vessel got underway and conducted man overboard and steering drills; all sat. Vessel received training on man overboard drill on how to make improvements.
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 24 February 2018
Resolved
Installed and portable firegfighting equipment has not been serviced annually. Service firefighting equipment to the satisfaction of the attending CG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2018
Resolved 27 February 2018
Resolution: 27Feb18: [name withheld] and [name withheld] attended the vessel to verify servicing of firefighting equpment, vessel retains valid servicing certificates on board. CG-835 has been cleared.
Construction/Loadline › Hull › Longitudinal Frame
Issued 11 February 2016
Resolved
Repair 03 cracked welds forward of the sewage tank, port side.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 March 2016
Resolved 18 February 2016
Resolution: 03 cracked welds were repaired IAW NVIC 11-80.