Records from 2016 to 2025. Most recent: inspection, 8 May 2025.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 26 June 2025
Resolved
For inspection procedures of Lifesaving appliances and arrangements, see subchapter W. Each lifejacket must have a lifejacket light approved under approval series 161.112 securely attached to the front shoulder area of the lifejacket.
life jacket lights were expired.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 July 2025
Resolved 10 July 2025
Resolution: replaced the lights
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 26 June 2025
No resolution recorded
Each firehose on each hydrant must have a combination solid stream and water spray firehose nozzle approved under subpart 162.027 of this chapter.
2 Nozzles installed were plastic and not type approved.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 July 2025 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 June 2025
No resolution recorded
For inspection procedures of electrical engineering equipment and systems see subchapter J
If twist-on type of connectors are used, the connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration.(c) Twist-on type of connectors may not be used for making joints in cables, facilitating a conductor splice, or extending the length of a circuit.
Multiple wire splices and twist on connectors present in
crane cab.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 July 2025 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 26 June 2025
No resolution recorded
An inspection either general or partial depending upon the circumstances shall be made whenever any important repairs or alterations are undertaken.
Counter weight support structure was not repaired, repairs and marine inspector attendance required prior to use.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 26 June 2025
Resolved
A hydrostatic release unit used in a float-free arrangement must be approved under approval series 160.162.
Hydrostatic release was not marked.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 26 June 2025
Resolution: vessel rep marked hydrostatic release.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 May 2025
Resolved
For inspection procedures of electrical engineering equipment and systems see subchapter J
If twist-on type of connectors are used, the connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration.
Multiple connectors present on 3304 engine to include governor wiring and enclosure missing cover with oil present.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 July 2025
Resolved 10 July 2025
Resolution: cover installed and crimp type connectors placed on governor
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 11 March 2024
Resolved
Each life raft or group of life rafts must be arranged for float-free launching. Hydrostatic release is missing from life raft.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2024
Resolution: Hyrdostatic release installed.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 11 March 2024
Resolved
The lights and shapes specified in these Rules shall comply with the provisions of Annex I of these Rules (33 CFR part 84). The navigation lights are non operational.
33CFR83.20(e)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2024
Resolution: Nav lights working.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 11 March 2024
Resolved
The two means of escape shall be as remote as practicable so as to minimize the possibility of one incident blocking both escapes. Escape scuttle in the crane tun engineering space is inoperable.
46CFR92.10-10(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 April 2024
Resolution: New Scuttle installed.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 11 March 2024
Resolved
The two means of escape shall be as remote as practicable so as to minimize the possibility of one incident blocking both escapes. Escape scuttle to the fire pump/MSD space is wasted and not installed.
46CFR92.10-10(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 April 2024
Resolution: New Scuttle installed.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 11 March 2024
Resolved
Except as provided in paragraph (f) of this section, each opening in a watertight bulkhead must have a means to close it watertight. Crane tub/changing room has a 2 wire marine cable transit that is not watertight.
46CRF171.111(a)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2024
Resolution: Corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 11 March 2024
Resolved
mats or gratings, suitable for the specific switchboard voltage must be installed for personnel protection at the front and rear of the switchboard and must extend the entire length of, and be of sufficient width to suit, the operating space. Matting behind crane switch board was missing and folded and deteriorated in the front.
46CFR111.30-11
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2024
Resolved 28 March 2024
Resolution: Corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 11 March 2024
Resolved
At each inspection for certification and periodic inspection, the quarters, toilets, and washing spaces, galleys, serving pantries, lockers, etc., shall be examined by the inspector to be assured that they are in a sanitary condition. Vessel had gear adrift, loose items and severe lack of overall cleanliness in workspaces.
46CFR91.25(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2024
Resolution: Vessel cleaned enough to clear CG-835.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 March 2024
Resolved
All pressure vessels must be provided with protective devices. Air Compressor room, FWD air receiver relief valve did not re-seat.
46CFR54.15-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2024
Resolved 28 March 2024
Resolution: Corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 March 2024
Resolved
All pressure vessels must be provided with protective devices. Air Compressor room. AFT are compressor was inoperable and unable to test relief valve.
46CFR54.15-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2024
Resolved 27 March 2024
Resolution: New Relief valve installed and tested.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 March 2024
Resolved
The frame or support of each semi-portable fire extinguisher required by Table 95.50–10(a) must be welded or otherwise permanently attached to a bulkhead or deck. Fire extinguisher locations #6 and #30 have fire extinguishers unmounted.
46CFR95.50-20(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2024
Resolved 28 March 2024
Resolution: Installed & mounted correctly.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 11 March 2024
Resolved
Distress signals. Each vessel must— Carry not less than 12 rocket parachute flares approved under approval series 160.136. Flares on board expired.
46CFR199.60(c)(1)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2024
Resolved 27 March 2024
Resolution: New flares onboard.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 11 March 2024
Resolved
In general, compliance with the standards established by the American Bureau of Shipping. Engineering stores room bilge access showed signs of wastage. Descale and UT in 6" x 6" grid pattern.
46CFR92.01-10(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 April 2024
Resolved 28 March 2024
Resolution: U/T Shots came back acceptable.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 11 March 2024
Resolved
All vessels shall have efficient guard rails or bulwarks on decks and bridges. Hand rails on ladder to crane are wasted and not to cropped and renewed where marked.
46CFR92.25-5(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 April 2024
Resolved 27 March 2024
Resolution: Handrails welded.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 11 March 2024
Resolved
Lifebuoys. Each vessel must carry lifebuoys approved under approval series 160.150 as follows: Markings.
Each lifebuoy must be marked in block capital letters.
Port AFT lifebuoy is not marked.
46CFR199.70(c)(1)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 April 2024
Resolved 27 March 2024
Resolution: Life bouy marked.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 March 2024
No resolution recorded
Nothing in this subpart shall be construed as limiting the inspector from making such tests or inspections as he or she deems necessary to be assured of the safety and seaworthiness of the vessel. Scow and anchor winch foundations showed significant signs of wastage and found to be suspect.
Repair prior to operation.
46CFR91.25-50(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 11 March 2024
Resolved
Satisfactory means permanently attached, shall be provided for closing the openings of the air pipes. MSD vent does not have a means of closing.
46CFR42.15-50(a)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 11 April 2024
Resolved 27 March 2024
Resolution: Ball check valve installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 11 March 2024
Resolved
Satisfactory means permanently attached, shall be provided for closing the openings of the air pipes. Potable water vent was wasted.
46CFR42.15-50(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 April 2024
Resolved 27 March 2024
Resolution: Ball check valve installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 March 2024
Resolved
Non-Metallic flexible hose may only be used in lube oil, fuel oil and fluid power systems only where flexibility is required and in lengths not more then 30 inches. Vessel had approx 30 feet of flexible hose for lube oil permanently strapped to an electrical cable run in crane machinery space.
46CFR56.60-25(b)(4)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2024
Resolution: Ball check valve installed.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 16 February 2023
Resolved
Each fire pump must be capable of delivering water simultaneously from the two highest outlets at 50 psi. Vessels fire main pipes were found with pin holes. Replace/repair fire main piping and demonstrate proper operation. 43CFR95.10-5(c)
Action required: 17 - Rectify deficiencies prior to departure
Due 16 February 2023
Resolved 24 March 2023
Resolution: Pipes renewed on deck and hydro'd satisfactory.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 February 2023
Resolved
General construction of the vessel shall be such as to minimize fire hazards. Vessels generator fuel return line leaking at the check valve. Replace/repair valve. 46CFR92.05-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 March 2023
Resolved 24 March 2023
Resolution: Replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 16 February 2023
Resolved
Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places. Vessel missing louvre on vent fan. Replace louvre. 46CFR92.25-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 March 2023
Resolved 24 March 2023
Resolution: Cover installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 February 2023
Resolved
Enclosures for each motor controller must meet IEC 60092-201 standards. Tag line winch motor controller unable to lock and was not watertight. Replace/repair motor controller.
46CFR111.70-3(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 March 2023
Resolved 24 March 2023
Resolution: New motor controller box installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 February 2023
Resolved
Electric installations on vessels must ensure the protection of the crew from electrical hazards. Vessel had chaffed wired and unsecured heater IWA generator. Secure heater and replace wiring. 46CFR111.01(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 March 2023
Resolved 24 March 2023
Resolution: Heater was secured and newly wired.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 February 2023
Resolved
Approved hand portable fire extinguishers shall be installed on all vessels. Vessels #17 fire extinguisher not properly mounted. Mount extinguishers in approved brackets.
46CFR95.15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 March 2023
Resolved 24 March 2023
Resolution: Extinguisher mounted.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 16 February 2023
Resolved
No repairs or alterations affecting the safety of vessel with regard to the hull, machinery or equipment shall be mad with out the knowledge of the [name withheld] walkway deck entry to crane was found to be wasted. Submit repair proposal.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 March 2023
Resolved 24 March 2023
Resolution: New diamond plate deck around 2nd level of crane was replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 February 2022
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150 as follows.
Lifebuoys retroreflective tape was extremely faded; replace.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 March 2022
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 25 February 2022
Resolved
The lights prescribed in these Rules shall have an intensity as specified in Annex I, to these Rules so as to be visible from the following minimum ranges: (a) In a vessel of 50 meters or more in length: (ii) A sidelight, 3 miles.
Vessel's starboard sidelight was faded; replace.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 March 2022
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 25 February 2022
Resolved
Vessel has been moored for over 6 months. Defer MOB drill to when the vessel gets underway. Provide proof of drill to OCMI.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 June 2025
Resolution: Vessel no longer has a rescue boat, but maintains standby vessel, eliminating the need for MOB drill
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 16 December 2020
Resolved
Exhaust pipe. (1) Exhaust pipe installations must conform to the requirements of ABYC P-1 and part 1, section 23 of NFPA 302 (both incorporated by reference; see 46 CFR 58.03-1)
CAT 3606 has a major failure of the flex joint fron the turbo to the stack.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 16 December 2020
Resolution: Vessel replaced wasted flex joint
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 16 December 2020
Resolved
Operational readiness. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use.
Life raft shell is damaged.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 13 January 2021
Resolution: Vessel had life raft serviced.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 16 December 2020
Resolved
The purpose of this subpart is to establish requirements for oil spill response plans for nontank vessels. The development of a nontank vessel response plan prepares the vessel's crew and ship management to respond to an oil spill.
NTVRP states when operating in Charleston COTP zone oil spill removal equipment will be provided for Average Most Probable Discharge, provide list showing all required equipment is available. NTVRP has Sector Charleston contact number listed incorrectly, number should be [phone withheld]. NTVRP record of changes section has last change occurring 2013 and cover page has 2018 listed, ensure all changes are incorporated into plan on barge. Provide current USCG approval letter for NTVRP. QI notification was not conducted as required by plan, notification was conducted and logged in presence of USCG. Provide evidence corrective actions were taken to comply with the requirements of NTVRP's.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2021
Resolved 30 December 2020
Resolution: Vessel recieved the items specfied in the NTVRP.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 3 December 2020
Resolved
Each cargo vessel must carry an immersion suit approved under approval series 160.171 of an appropriate size for each person on board.
Immersion suit were not of appropriate size for crew is present.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 30 December 2020
Resolution: Vessel placed in service the corect size and number of immersion suits
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 3 December 2020
Resolved
Exhaust pipe. (1) Exhaust pipe installations must conform to the requirements of ABYC P-1 and part 1, section 23 of NFPA 302 (both incorporated by reference; see 46 CFR 58.03-1)
CAT 3408 has multiple exhaust leaks
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2021
Resolved 30 December 2020
Resolution: Replaced failed gaskets in the exhaust system.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 3 December 2020
Resolved
The applicable standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03-1), may be used as the standard for the design, construction, and testing of main and auxiliary machinery except as modified in this subchapter.
No proof of testing over-speed, Cooling water temp, Oil pressure was available
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2021
Resolved 13 January 2021
Resolution: CAT technician conducted required testing with satisfactory results
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 June 2020
Resolved
Safety or relief valves on pressure vessels. (1) If your vessel's Certificate of Inspection is renewed annually, the marine inspector must check the settings of the safety or relief valves on all pressure vessels, except cargo tanks, at each inspection for certification.
(2) If your vessel's Certificate of Inspection is renewed less often than annually, the marine inspector must check the settings of the safety or relief valves on all pressure vessels, except cargo tanks, twice every 5 years. No more than 3 years may elapse between any check and its immediate predecessor
Relief valves have not been tested.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2020
Resolved 4 June 2020
Resolution: Installed new certified relief valves
14 - Pollution Prevention › 142 - MARPOL Annex II › Other (MARPOL Annex II)
Issued 1 June 2020
Resolved
A vessel owner or operator required by §155.5035 to have a vessel response plan (VRP) must conduct exercises as necessary to ensure that the VRP will function in an emergency. Vessel owners or operators must include both announced and unannounced exercises; and A vessel owner or operator must comply with the VRP exercise requirements of 33 CFR 155.1060.
Missing quarterly QI drill, OSRO annual drill and triennial exercise.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2020
Resolved 21 June 2020
Resolution: Vessel rep provided proof of conducting drills as required.
14 - Pollution Prevention › 142 - MARPOL Annex II › Other (MARPOL Annex II)
Issued 1 June 2020
Resolved
he emergency means of shutdown required by §§154.550 and 155.780 of this chapter, as applicable, is in position and operable.
Fuel transfer pump shut down button was stuck with corrosion.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 1 June 2020
Resolution: Disassembled and cleaned the corrosion.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 1 June 2020
Resolved
The master or person in charge shall ensure that tables indicating the maximum safe working loads for the various working angles of the boom, where the boom is rated at varying capacities depending on the radius, and the maximum and minimum radius at which the boom may be safely used, are conspicuously posted near the controls and are visible to the operator when working the crane.
Was missing from crane operations location.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 1 June 2020
Resolution: Printed new loading information and placed in crane cab.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 26 May 2020
Resolved
MSD must be free of design defects such as rough or sharp edges that may cause bodily injuries or that would allow toxic substances to escape to the interior of the vessel.
MSD tank has holes in the cover and possible other repairs not per manufacturers approval.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2020
Resolved 3 September 2020
Resolution: Vessel installed new type II MSD mfg by FAST serial no 23381
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Lighting (Working spaces)
Issued 26 May 2020
Resolved
Sufficient illumination must be provided by the emergency lighting source under emergency conditions to effect damage control procedures and to provide for safe egress from each space.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2020
Resolved 4 June 2020
Resolution: Installed 2 new lights in the cargo hold.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 23 April 2019
Resolved
Liferafts shall be installed in a float free configuration. Liferaft was not installed to be float free.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 23 April 2019
Resolved 23 April 2019
Resolution: Marine inspectors assisted crew in correcting deficiency and provided training.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 April 2019
Resolved
Fire hazards shall be minimized. Main diesel generator turbo was found with excessive oil coating the turbo.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 April 2019
Resolved 29 April 2019
Resolution: Turbo cleaned, plug replaced, SSDG run w/o evidence of oil leakage.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 April 2019
Resolved
Fire hazards shall be minimized. Fuel transfer piping was found leaking.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 April 2019
Resolved 29 April 2019
Resolution: Piping was renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 April 2019
Resolved
Each SSDG must be protected by overspeed trip not to exceed 15% of the rated speed. SSDG shall not be used until overspeed is repaired to the sat of the CG MI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 April 2019
Resolved 29 April 2019
Resolution: Overspeed satisfactorily demonstrated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 April 2019
Resolved
Fire hazards shall be minimized. Fuel hose shall have chafing installed.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 23 April 2019
Resolved 29 April 2019
Resolution: Chaffing was installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 23 April 2019
Resolved
Battery charging spaces shall be equipped with intrinsically safe equipment. Battery closet was fitted with non-intrinsically safe receptacle. Do not use charging until rectified.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 April 2019
Resolved 29 April 2019
Resolution: Electrical outlet was moved to outside of the hazardous space.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 April 2019
Resolved
Pressure vessels shall be within corrosive limits. Pressure vessel in the MSD space is heavily corroded and presents a hazard. Repair or remove prior to using and within 7 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2019
Resolved 29 April 2019
Resolution: Pressure vessel was permanently removed from the vessel.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 23 April 2019
Resolved
Wiring on board shall be permanently installed. MSD and Shore tie lighting in the MSD space are not permanently installed.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2019
Resolved 29 April 2019
Resolution: Wiring was made permanent.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 16 August 2018
Resolved
The vessel is currently broadcasting (1) Improper IMO Number.
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 September 2018
Resolved 16 February 2023
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 28 June 2018
Resolved
Piping conveying vapors which temperatures exceed 150 degrees F shall be suitably insulated where necessary to preclude injury to personnel. SSDG exhaust manifold exposed to bare metal. 46 CFR 56.50-1(k)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 July 2018
Resolved 10 July 2018
Resolution: Lagging properly installed.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 7 June 2017
Resolved
Barge does not have survival craft onboard. Barge is required to carry survival craft in accordance with 46 CFR 199.640(a) for 10 industrial personnel. Install required survival craft in accordance with Subchapter W to the satisfaction of an attending Marine Inspector. Prior to installation of survival craft; while the barge is manned, a rescue vessel shall be standing by in accordance with COI
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 7 August 2017
Resolved 2 August 2017
Resolution: Vessel rep installed a 12 person liferaft on the stern of the dredge for route shown on COI. Inspected type, installation, & servicing; all sat.