Records from 2006 to 2026. Most recent: inspection, 15 January 2026.
Inspection history · 51
15 January 2026
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8297054
30 July 2025
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8198397
20 March 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8096937
13 November 2024
Deficiency Check · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8034442
25 September 2024
Internal Structural Exam · Drydock Extension
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8008520
8 February 2024
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7862070
29 December 2022
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7614056
22 March 2022
Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7416283
7 January 2021
MTSA Verification · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7120964
11 February 2020
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6906710
5 September 2019
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6804329
23 April 2019
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6668427
3 January 2019
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6604911
29 December 2017
COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6330016
17 February 2017
Examination of Repairs · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6091878
3 January 2017
Cargo Tank Internal · Annual Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6064843
19 November 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6044263
21 April 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5864535
21 January 2016
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5801223
21 April 2015
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5109563
5 January 2015
MTSA Verification · Deficiency Check · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5048138
14 October 2014
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5004585
9 September 2014
Internal Structural Exam · Drydock Exam · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4978672
9 September 2014
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4984096
28 March 2014
Plan Review (Other than "T")
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4824690
12 March 2014
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4814572
7 January 2014
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4778801
7 January 2014
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4782758
2 October 2012
Excursion Permit · Load Line/Change of Employment
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4454877
24 March 2012
Load Line/Change of Employment · Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4275563
27 January 2012
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4233263
9 December 2011
Deficiency Check · COI Inspection · MARPOL Annex I Examination · Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4206410
2 December 2011
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4202018
21 November 2011
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4193301
25 June 2011
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4056352
16 December 2010
Annual Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3914288
15 June 2010
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3767561
17 January 2010
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3665388
4 January 2010
Internal Structural Exam · MTSA Verification · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3662184
17 January 2009
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3395933
19 December 2008
Annual Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3378808
22 November 2008
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3381360
19 July 2008
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3274718
28 June 2008
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3274807
5 May 2008
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3199540
28 January 2008
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3137928
18 November 2007
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3109310
11 July 2007
MARPOL Annex II Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2990850
13 June 2007
Administrative Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2960639
8 February 2007
MARPOL Annex I Examination · Construction Oversight · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2868671
20 December 2006
Cargo Tank Internal · Internal Structural Exam · MTSA Verification · Hull Examination · Initial Certification
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 2840409
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 20 March 2025
Resolved
All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter...It was found that the starboard side aft cargo pump was completely removed. Rectify prior to cargo operations using the starboard side aft cargo pump system.
46 CFR 32.35-1
46 CFR 58.10-5(a)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 30 July 2025
Resolution: Received letter confirming the installation and operational condition of new cargo pump.
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 22 March 2022
Resolved
All tank vessels, except unmanned barges, contracted for after July 1, 1969, shall have efficient guard rails or bulwarks on decks and bridges. Replace guard rail cables where missing, and tighten loose guard rail cables.
46 CFR 32.02-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 April 2022
Resolved 4 April 2022
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 11 February 2020
Resolved
Gears, couplings, flywheels and all machinery capable of injuring personnel shall be provided with adequate covers or guards. All 3 cargo pump engines and both generators were found with exposed, uncovered rotary belts that are potentially a hazard to anyone operating the machinery.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2020
Resolved 8 January 2021
Resolution: Rotary guards have been installed
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 11 February 2020
Resolved
The sidelights of a vessels 20 meters or more in length shall be fitted with matt black inboard screens. Sidelights on vessel were found without matt black inboard screens.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2020
Resolved 17 March 2020
Resolution: Matte black inboard screens installed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 30 September 2019
Resolved
C/R 03 insets as marked by chalk on the bottom shell plating.
C/R 01 inset as marked by chalk on side shell at sheer strake plate on the STBD side fwd of beam.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 October 2019
Resolved 18 October 2019
Resolution: All items are cleared.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 January 2019
Resolved
Electrical installations on vessels must ensure the protection of passengers, crew, other persons, and the vessel from electrical hazards.
The grounded distribution system on the 120V system has a ground fault in the machinery space.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 January 2019
Resolution: Deficiency rectified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 January 2019
Resolved
Electrical installations on vessels must ensure the protection of passengers, crew, other persons, and the vessel from electrical hazards.
The ground detection lights on the grounded distribution system inside the house are not working.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 January 2019
Resolution: Deficiency rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 January 2019
Resolved
A tank vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have on board an emergency means to enable the PIC of a transfer operation to stop the flow of oil or hazardous material.
The Port side prime mover was not able to be shutdown through the Emergency Shutdown procedure. Remove prime move from service until deficiency has been rectified.
Action required: 705 - Other - as specified
Due 15 February 2019
Resolved 13 February 2019
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 January 2019
Resolved
The High Level Alarm must be identified with legend "HIGH LEVEL ALARM" in black letters, 2 inches high on a white background.
There was no High Level ALARM Stenciled.
Action required: 705 - Other - as specified
Due 15 February 2019
Resolved 13 February 2019
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 January 2019
Resolved
The Tank Overfill Alarm must be identified with legend "TANK OVERFILL ALARM" in black letters, 2 inches high on a white background.
There was no TANK OVERFILL ALARM stenciled.
Action required: 705 - Other - as specified
Due 15 February 2019
Resolved 13 February 2019
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 29 December 2017
Resolved
Cargo pump must have remote manual shutdown. FWD STBD pump remote shutdown inop.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 January 2018
Resolved 22 January 2018
Resolution: Witnessed cargo pump engine operation.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 29 December 2017
Resolved
STBD nav lights inop.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 29 December 2017
Resolution: Received photos of operable port light.
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 January 2017
Resolved
Repair all wroklist items noted on the 04JAN17 ISE prior to credit drydock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 September 2019
Resolved 18 October 2019
Resolution: Def Cleared.
Construction/Loadline › Hull › Transverse Frame
Issued 4 January 2017
Resolved
#6 Stbd Void, #3 Frame (from fwd). C/R crushed bottom web frame and twisted side shell channel to above the #3 SSL, as marked. V/W cracked welds IWO #3, #5, #6, #7, #8 SSL, as marked.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 4 February 2017
Resolved 17 February 2017
Resolution: Crushed bottom web frame and side shell channel were cropped and renewed as ordered. All broken welds on sideshell longitudinals were properly rewelded.
Electrical › Electric Supply System (service) › Battery Installation
Issued 19 March 2015
Resolved
Each battery tray must be chocked with wood strips or their equivalent to prevent movement. 46CFR111.15-5(d)
Action required: 705 - Other - as specified
Due 9 April 2015
Resolved 9 April 2015
Resolution: Blocks have been placed into the battery box preventing unnecessary movement.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 19 March 2015
Resolved
A vessel's hull must not carry current as a conductor except for the systems listed in 46CFR111.05-11. Vessel has a ground on the 240volt distribution system.
Action required: 705 - Other - as specified
Due 9 April 2015
Resolved 9 April 2015
Resolution: Recieved a letter from certified electrician stating that there was no ground.
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 March 2015
Resolved
Wire must be component insulated. The exhaust fan and associated wiring above the range has suffered heat/fire damage. Repair fan and associated wiring. Tag out fan until deficiency is cleared. 46CFR111.60-11(b).
Action required: 705 - Other - as specified
Due 9 April 2015
Resolved 9 April 2015
Resolution: Exhaust fan was replaced.
Engineering › Diesel Engine (auxiliary) › Crankcase
Issued 19 March 2015
Resolved
If the periodic inspection reveals deficiencies in your vessel's maintenance, you must make any or all repairs or improvements within the time specified by the [name withheld] generator engines require maintenance to reapir engine oil leaks and clean up excessive oil buildup on the radiators. 46CFR31.10-17(b)(3)
Action required: 705 - Other - as specified
Due 9 April 2015
Resolved 9 April 2015
Resolution: repairs were made to affected areas, all sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 19 March 2015
Resolved
Each hose assembly used for transferring oil or hazardous material must be marked as required in 46CFR154.500. The hose connected to the diesel fuel tank is not properly marked.
Action required: 705 - Other - as specified
Due 9 April 2015
Resolved 9 April 2015
Resolution: Lines were stenciled properly.
Deck/Cargo › Cargo Heating › General
Issued 19 March 2015
Resolved
Operational tests and checks of all safety relief valves must be conducted by the owner, chief engineer, or person in charge at the periodic inspection. Tests of safety relief valves on the thermal fluid heater have not been conducted. 46CFR61.30-20
Action required: 705 - Other - as specified
Due 24 April 2015
Resolved 15 April 2015
Resolution: Received paperwork of operational tests and checks were conducted on the safety valves.
Deck/Cargo › Cargo Heating › General
Issued 19 March 2015
Resolved
For visual inspection of the thermal fluid heater, access plates and manholes shall be removed as required by the marine inspector and the heater and combustion chambers shall be thoroughly cooled and cleaned. The thermal fluid heater was not prepared for internal visual inspection at the periodic inspection. 46CFR61.30-5
Action required: 705 - Other - as specified
Due 24 April 2015
Resolved 21 April 2015
Resolution: Conducted internal thermal fluid heater inspection with manufacturer quality inspector. found 0 deficiency.
Construction/Loadline › Hull › Hull Plating
Issued 9 September 2014
Resolved
Vessel shall not conduct cargo operations until attending marine inspector has verified that repairs have been made to side shell plating and internal structural framing of the 4th and 5th void on the port side, due to damage sustained on 09SEP14.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 21 September 2014
Resolution: [name withheld], attended vessel for the purpose of conducting an air test inspection. Air test was conducted on the #4 and #5 port side void tanks. Pressure gauge read 1.5 Psi on both tanks. Test satisfactory
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 October 2012
Resolved
Prove proper operation of NAV Lights before departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 October 2012
Resolution: NAV Lights were serviced, and found to be working upon testing.
Construction/Loadline › Hull › Weld
Issued 1 October 2012
Resolved
Repair cracked weld in #3 starboard side ballast wing tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 October 2012
Resolution: Weld was repaired, and found to be satisfactory.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 4 January 2010
Resolved
Clean and replace cracked welds on #1, #2, and # 5 longitudinals on the second to last frame forward in the # 5 port wing tank (void).
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 20 December 2011
Resolved 9 December 2011
Resolution: Weld repairs inspected
Deck/Cargo › Cargo Heating › General
Issued 4 January 2010
Resolved
Show proper operation and knowledge of thermal fluid heater.
Action required: 705 - Other - as specified
Due 4 February 2010
Resolved 12 January 2010
Resolution: Company and crew showed familiarization and proper operation of thermal fluid heater.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 28 January 2008
Resolved
Prove proper operation of the #3 Port high level alarm prior to loading cargo in the #3 Port tank.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 January 2008
Resolution: Proved proper operation of the # 3 Port high level alarm.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 June 2007
Resolved
Cargo pump prime movers do not meet 46 CFR 111.105-31 and were not approved as per 46 CFR 11.105-7. Cargo operations is not permitted until compliance has been met.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 January 2010
Resolution: Prime Movers have proven to be intrinsically safe and accepted by attending Marine Inspectors.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 June 2007
Resolved
Barge is restricted to carriage of grade E cargoes only. Open cup flashpoint of not less than 150deg F/140deg F closed cup flashpoint.
Condition: Improper Installation
Action required: 703 - Prior to bunkering operations
Resolved 12 January 2010
Resolution: Amended COI to reflect the restrictions to the operation of machinery and thermal fluid heater with certain cargoes.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 20 December 2006
Resolved
Provide proof of Vessel Response Plan (VRP) approved by Coast Guard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2007
Resolution: VRP approval granted by HQ.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 20 December 2006
Resolved
Provide cargo transfer procedures as required by 33 CFR 155.720.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 March 2007
Resolution: Received/reviewed copy of transfer procedures; verified that document meets requirements of 33CFR155.720.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 20 December 2006
Resolved
Provide proof of cargo pump engine wiring harness and alternator meeting 46 CFR 111.105-31(i) , NEC Class 1/Division 1 as per USCG D8(m) policy letter 02-05 NLT 31AUG07.
Action required: 705 - Other - as specified
Due 31 August 2009
Resolved 12 January 2010
Resolution: Using Safety Alert 09-08, ensured cargo pump primary movers in the cargo deck areas have proven to be intrinsically safe.