Records from 1982 to 2023. Most recent: inspection, 7 October 2023.
Inspection history · 129
7 October 2023
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7836616
27 June 2022
Administrative Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7489226
9 September 2021
Administrative Inspection · Examination of Repairs · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7308164
29 August 2021
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7306706
12 November 2020
Deficiency Check · Examination of Repairs · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7093803
11 September 2020
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7056088
14 August 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7035420
19 August 2019
SIP Initial Entry · Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6788724
20 May 2019
MTSA Verification · Internal Structural Exam · Cargo Tank Internal · COI Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6688862
16 August 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6496620
21 June 2017
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6180455
21 July 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5945734
19 June 2015
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5154804
16 September 2014
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4983772
21 July 2014
Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4924777
23 December 2013
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4774189
6 August 2013
Examination of Repairs · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4669450
23 July 2012
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4372996
19 August 2011
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4113246
12 July 2010
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3789999
11 May 2010
Examination of Repairs · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3729986
22 September 2009
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3600545
3 October 2008
Hull Examination · Examination of Repairs · Internal Structural Exam · Cargo Tank Internal · Administrative Inspection · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3333078
3 March 2008
Damage Survey · Administrative Inspection · Annual Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3157578
2 March 2007
Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2880753
29 August 2006
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2763088
26 June 2006
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2692352
30 May 2006
Administrative Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2664370
6 February 2006
MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2580164
22 February 2005
Annual Inspection · MTSA Verification
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2296666
15 January 2004
Annual Inspection · Internal Structural Exam
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1985967
8 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1961074
1 April 2003
Annual Inspection
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1765971
22 February 2002
Annual Inspection
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1488354
15 May 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 522804
22 February 2001
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1430984
5 December 2000
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 284935
21 March 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1468123
25 February 1999
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1434796
6 August 1997
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 782619
1 April 1996
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 389735
1 April 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1435740
12 March 1996
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 506363
12 March 1996
Damage Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 885815
18 August 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1392288
28 June 1995
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 451778
28 April 1995
Deficiency Check · Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1398233
29 March 1995
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1144231
21 February 1995
Damage Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1389991
24 October 1994
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 642467
8 October 1994
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 153778
25 September 1994
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 181020
7 September 1994
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1422413
25 August 1994
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 464761
12 August 1994
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 865513
30 June 1994
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 488951
30 March 1994
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1166527
4 February 1994
Damage Survey · Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 852744
5 January 1994
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 451965
9 December 1993
Permit to Proceed
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1460679
5 November 1993
Permit to Proceed
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1156337
5 November 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1379872
21 September 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1152151
3 February 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1133033
16 January 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 476169
15 December 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1139644
14 December 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 828985
9 October 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 944481
14 September 1992
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1258904
25 February 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 952985
13 February 1992
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1256256
27 January 1992
Permit to Proceed · Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1266674
25 January 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 176312
9 January 1992
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 539401
6 November 1991
Deficiency Check · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 937697
24 October 1991
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 939934
19 May 1991
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 474750
15 September 1990
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 926517
14 September 1990
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 923248
1 April 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 466237
14 November 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1216586
6 October 1989
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 332987
23 June 1989
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 514265
31 May 1989
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 532995
17 February 1989
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1347150
30 November 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1208242
29 November 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 895091
23 November 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 464036
16 November 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 515001
14 November 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 537969
20 September 1988
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1198087
28 July 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 436911
9 July 1988
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 461124
28 June 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 473837
19 June 1988
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 528917
5 February 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 451600
21 November 1987
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 461213
12 November 1987
MARPOL Annex II Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1022146
3 November 1987
Examination of Repairs · Deficiency Check · Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1329251
30 October 1987
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1018954
30 July 1987
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1030215
13 July 1987
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1017786
12 July 1987
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 465284
6 June 1987
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 512083
6 May 1987
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 513947
6 May 1987
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1021686
27 March 1987
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 443032
5 March 1987
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1314679
2 March 1987
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1309964
10 January 1987
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 469542
6 January 1987
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 512663
24 December 1986
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 447634
18 September 1986
Credit Drydock · COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1310578
15 July 1986
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 534778
23 June 1986
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 500762
12 December 1985
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1299339
6 December 1985
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 987053
7 November 1985
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 989085
25 October 1985
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1299791
22 October 1985
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 991050
6 September 1985
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 496697
4 September 1985
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 989264
10 July 1985
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1290809
18 June 1985
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 448133
6 May 1985
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 515451
23 September 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 966088
6 September 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 965656
26 April 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 964176
28 August 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970524
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 12 November 2020
Resolved
vsl reported 6' x 6' x 6" inset on stbd side near stern waterline halfmoon shaped.
Action required: 60 - Rectify deficiencies prior to movement
Due 12 December 2020
Resolved 30 November 2020
Resolution: Witnessed satisfactory pressure test of repair. See narrative for details.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 17 August 2020
Resolved
Scantlings, material, and workmanship shall be at least equivalent to the requirements of ABS or other recognized class society. Vessel experienced a pinhole sized leak on the #2 Cargo Tank leaking into the #1 wing void. Vessel is currently located at MM100.8 at the Marrero/Westwego Fleet.
Vessel is authorized direct transit from MM100.8 to TT184 for permanent repairs. Vessel is not authorized to conduct any additional cargo operations until permanent repairs are made to the satisfaction of the attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 September 2020
Resolution: Permanent repairs resolved deficiency.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 August 2018
Resolved
Found wirings that are not run through a marine shipboard cable in a Class 1 Div 1 hazardous locations. All wirings in a Class 1 Div 1 hazardous locations should be run through a marine shipboard cable to the satisfaction of the attending Marine Inspector.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 16 August 2018
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 11 May 2010
Resolved
In accordance with 46 CFR 31.10-25, Prior to carrying cargo in the #2 cargo tank, submit cargo system to include the piping, engine, pump, and relief valve to the Marine Safety Center for approval
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 July 2010
Resolution: Vsl rep received the approval letter and drawings marked "APPROVED" from the Coast Guard for the installation of their new cargo pump system. Vsl rep addressed comments in MSC approval letter to the satisfaction of the attending Inspectors.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 11 May 2010
Resolved
Prior to operating the new #2 cargo tank pump, submit the hazardous location drawing to the Marine Safety Center for approval.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 July 2010
Resolution: Vsl rep received the approval letter and drawings marked "APPROVED" from the Coast Guard for the installation of their new cargo pump system. Vsl rep addressed comments in MSC approval letter to the satisfaction of the attending Inspectors.
Construction/Loadline › Hull › Bottom Plating
Issued 3 March 2008
Resolved
Prior to conducting cargo operations, proceed directly to drydock to affect permanent repairs to the damaged bottom plating of Void Nos. 4 and 5. Repairs are to be completed at either Bollinger Gretna or Bollinger Algiers. Notify this office of repair location and date of docking. Dewatering pumps are to be onboard and a 1-hour watch/rounds are to be maintained during transit.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 24 March 2008
Resolution: Observed satisfactory air test of replaced bottom plating.
Construction/Loadline › Structures › Deck Plating
Issued 26 June 2006
Resolved
Remove the doubler plate located forward, in way of the cargo tank raised trunk and the bow rake/cargo tank bulkhead. Insert the deck with a plate of the appropriate size, approximately 18" x 24".
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2006
Resolved 11 September 2006
Resolution: Witnessed satisfactory air test of insert.
Construction/Loadline › Structures › Deck Plating
Issued 26 June 2006
Resolved
Remove the doubler plate located amidships on the port side, in way of the cargo tank raised trunk and the wing void/cargo tank bulkhead. Insert the deck with an 18" x 18" plate.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2006
Resolved 11 September 2006
Resolution: Witnessed satisfactory air test.
Deck/Cargo
Issued 22 February 2001
Resolved
INSTALL RISING STEM VALVES OR VALVE INDICATORS ON ALL CARGO TANK VALVES. TO BE COMPLETED BY OR AT THE NEXT CARGO TANK INTERNAL EXAMINATION ON 25FEB09
Condition: Unknown
Due 25 February 2009
Resolved 22 February 2002
Resolution: No Longer required.
Deck/Cargo
Issued 12 March 1996
Resolved
Prior to reloading cargo, renew fractured #3 P/V relief valve mounting pipe. In the interim, make and maintain temporary repairs.
Condition: Unknown
Due 13 March 1996
Resolved 13 March 1996
Construction/Loadline
Issued 12 March 1996
Resolved
Prior to loading next cargo make permenant repairs to #6(from aft) portsideexternal frame. Crop and renew side frame from maindeck to top of frame, and horizontal frame from portside to approx. 8" inbd of 1st tank top longitudinal frame, & repair fractured weld 24" up on tank top side shell.
Condition: Unknown
Due 12 April 1996
Resolved 14 March 1996
Construction/Loadline
Issued 12 March 1996
Resolved
Prior to loading cargo make temporary repairs to fracture located in way ofthe side #2 cargo tank stbd raised top approx. 24 inches up from the deck where frame ripped free from a weld. Upon completion of temp repair loading may commence no higher than 12 inches below fracture.
Condition: Unknown
Due 13 March 1996
Resolved 13 March 1996
Construction/Loadline
Issued 12 March 1996
Resolved
Prior to reloading cargo, make permanent repair to weld fracture located at#3 cargo tank raised top where it joins the aft main deck amidships. In the interim, make and maintain temporary repairs, and limit on-board cargo level to no less than one foot below fracture.
Condition: Unknown
Due 12 March 1996
Resolved 12 March 1996
Construction/Loadline
Issued 12 March 1996
Resolved
Prior to loading next cargo make permanent repairs to fracture in existing weld repair located in way of #3 cargo tank raised tank top aft centerline connection with main deck.
Condition: Unknown
Due 12 April 1996
Resolved 14 March 1996
Construction/Loadline
Issued 12 March 1996
Resolved
Prior to reloading cargo make permanent repair to damaged external frames and tank fractures in way of #2 raised tank top, port side. In the interim,make and maintain temporary repairs, and limit on-board cargo level to no less than one foot below fracture.
Condition: Unknown
Due 13 March 1996
Resolved 13 March 1996
Construction/Loadline
Issued 21 February 1995
Resolved
Make permanent repairs to transverse fracture at lower knuckle in #5 starboard wing void at forward end of wing tank. Repairs to be made prior to loading cargo.
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Construction/Loadline
Issued 21 February 1995
Resolved
Examine internal structure in port and starboard wing voids where inset extensively. Internal examination must be conducted in presence of a CoastGuard inspector from the cognizant OCMI zone.
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Deck/Cargo
Issued 21 February 1995
Resolved
Repair #1 stbd. P/V, (loose on pipe riser), and #2 stbd. P/V, (valve internals came out in inspectors hand), prior to loading cargo.
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Deck/Cargo
Issued 21 February 1995
Resolved
Clean ALL cargo tank ullage opening flame screens of cargo residue prior toloading cargo.
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Construction/Loadline
Issued 21 February 1995
Resolved
Make permanent repairs to port cargo box bracket at connection to deck. Bracket is #11 from forward end of cargo box.
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Construction/Loadline
Issued 21 February 1995
Resolved
Make permanent repairs to port corner of transom and side shell as follows:side shell at deck 6' fwd of corner, side shell at deck at corner, and transom plate 2' below deck adjacent to corner. Repairs to be completed prior to loading cargo.
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Construction/Loadline
Issued 21 February 1995
Resolved
Make permanent repairs to port upper rub bar located adjacent to 5-1/2 brackets forward of aft end of cargo box.
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Construction/Loadline
Issued 21 February 1995
Resolved
Make permanent repairs to port corner of bow where plate is inset, creased and necked.
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Construction/Loadline
Issued 21 February 1995
Resolved
Make permanent repairs to transom plate at starboard end, 6' below the deckand 4' inboard of the starboard side. repairs to be made prior to loading cargo.
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Construction/Loadline
Issued 21 February 1995
Resolved
Make permanent repairs to fractured lower knuckle in #3 starboard wing tank, approximately 10' aft of forward bulkhead. Repairs to be made prior to loading cargo._x001C_ _x001C_
Condition: Unknown
Due 21 February 1995
Resolved 21 February 1995
Deck/Cargo
Issued 7 September 1994
Resolved
Make P/V valves available for internal examination.
Condition: Unknown
Due 7 October 1994
Resolved 9 September 1994
Construction/Loadline
Issued 7 September 1994
Resolved
Discharge cargo, gas free and make necessary repairs to leak in way of #3 stbd wing void at aft swash bulkhead, outboard. Not to be reloaded until repairs have been made and tested by a Coast Guard inspector.
Condition: Unknown
Due 14 September 1994
Resolved 9 September 1994
Deck/Cargo
Issued 9 December 1993
Resolved
AFFECT PERMANENT REPAIRS AT TWO PITTED AREAS, ONE HOLED AT FWD END OF #1. STB'D CARGO TANK RAISED TRUNK.
Condition: Unknown
Due 9 December 1993
Resolved 9 December 1993
Construction/Loadline
Issued 14 September 1992
Resolved
CROP AND RENEW ALL 6 VOID HATCHES ON EACH SIDE OF VESSEL OR PROVE TO ATTENDING MARINE INSPECTOR BY 35 PSI HOSE TEST THAT THEY ARE WATER TIGHT.
Condition: Unknown
Due 14 September 1992
Resolved 14 September 1992
Deck/Cargo
Issued 14 September 1992
Resolved
PRIOR TO LOADING OR TRANSFER OF ANY CARGOES RENEW THE THREE EACH VAC-REL PVVALVES ON TANKS #2P/S AND #3 PORT. CORRODED BEYOND SEALING POSSIBILITIES.
Condition: Unknown
Due 14 September 1992
Resolved 14 September 1992
Deck/Cargo
Issued 14 September 1992
Resolved
INSTAL GAURD ON CARGO PUMP ENGINE EXHAUST MANIFOLD AND MUFFLER.
Condition: Unknown
Due 14 September 1992
Resolved 14 September 1992
Construction/Loadline
Issued 14 September 1992
Resolved
REPAIR CRACKED WELDS ON TANK TOP FRAMES WHERE THEY MEET THE VOID TOPS. 8 EA. ON EACH SIDE OF THE BARGE.
Condition: Unknown
Due 14 September 1992
Resolved 14 September 1992
Engineering
Issued 14 September 1992
Resolved
PRIOR TO USE OF ANY BARGE MACH REPAIR F/O LEAK AT FITTING ON BOTTOM OF DIESEL TANK.
Condition: Unknown
Due 14 September 1992
Resolved 14 September 1992
Construction/Loadline
Issued 13 February 1992
Resolved
PRIOR TO LOADING OR TRANSPORTING ANY CARGO MAKE REPAIRS TO BOTTOM HULL PLATING BY REMOVING THREE DOUBLER PLATES ON FWD THIRD OF BARGE. CROP AND RENEW TO GOOD METAL CRACK HULL PLATING IN MIDDLE OF BARGE ONE THIRD THE WAYOF THE BARGE.
Condition: Unknown
Due 21 February 1992
Resolved 20 February 1992
Construction/Loadline
Issued 13 February 1992
Resolved
PROIR TO LOADING OR TRANSPORTING ANY CARGO MAKE VESSEL AVAILABLE FOR DRYDOCK EXAM BY COAST GUARD INSPECTORS. DUE TO THREE DOUBLERS FOUND AND MORE SUSPECTED.
Condition: Unknown
Due 21 February 1992
Resolved 26 February 1992
Construction/Loadline
Issued 24 October 1991
Resolved
MAKE PERMANENT REPAIRS IN WAY OF 1 FOOT BY ONE INCH GOUGE UNDERSIDE OF PORTBOW RAKE.
Condition: Unknown
Due 24 October 1991
Resolved 24 October 1991
Construction/Loadline
Issued 14 September 1990
Resolved
AIR TEST #4 PORT WING VOID TO PROVE TIGHT.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Construction/Loadline
Issued 14 September 1990
Resolved
PRIOR TO NEXT LOADING MAKE PERMANENT REPAIR IN WAY OF SHINGLED HOLE SIDE SHELL #4 PORT WING VOID FORWARD BULKHEAD AT BOTTOM SIDE LONG.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Construction/Loadline
Issued 14 September 1990
Resolved
MAKE PERMANENT REPAIR TO 3 FRACTURES IN WAY OF HEADLOG AND HEADLOG WRAPPER FORWARD PORT CORNER.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Construction/Loadline
Issued 14 September 1990
Resolved
MAKE PERMANENT REPAIRS TO 9 FRACTURES IN DECK KNUCKLE STARBOARD SIDE IN VARIOUS LOCATION FROM BOW TO STERN.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Construction/Loadline
Issued 14 September 1990
Resolved
REPLACE MISSING MOORING FITTING ON BOW, CENTER LINE.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Construction/Loadline
Issued 14 September 1990
Resolved
REMOVE EXCESS WATER FROM #1 STARBOARD WING VOID.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Construction/Loadline
Issued 14 September 1990
Resolved
REPAINT DRAFT MARKINGS.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Construction/Loadline
Issued 14 September 1990
Resolved
MAKE PERMANENT REPAIR TO 5 FRACTURES IN DECK KNUCKLE PORT SIDE AFT.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Construction/Loadline
Issued 29 November 1988
Resolved
MAKE PERMANENT REPAIRS TO #1 SIDE LONG IN WAY OF CORNER BRACKET PORT SIDE AFT APPROXIMATELY 1 FOOT INSERT(ALL WELDS BROKEN) NO LATER THAN COMPLIANCE DATE.
Condition: Unknown
Due 29 November 1988
Resolved 29 November 1988
Construction/Loadline
Issued 29 November 1988
Resolved
MAKE PERMANENT REPAIRS TO BROKEN WELDS #1 CORNER BRACKET, PORT AFT CORNER NO LATER THAN COMPLIANCE DATE.
Condition: Unknown
Due 29 November 1988
Resolved 29 November 1988
Deck/Cargo
Issued 20 September 1988
Resolved
PRIOR TO USING VESSELS THERMAL FLUID HEATER FOR OFFLOADING CARGO, PROVE OPERATION OF ALARMS NO LATER THAN COMPLIANCE DATE.
Condition: Unknown
Due 20 September 1988
Resolved 20 September 1988
Construction/Loadline
Issued 3 November 1987
Resolved
CROP AND RENEW PLATE IN WAY OF TEMP REPAIR IN PORT BOW RAKE SLOPE SHEET.
Condition: Unknown
Due 3 November 1987
Resolved 3 November 1987
Construction/Loadline
Issued 3 November 1987
Resolved
REPAIR FRACTURE AT BILGE STBD STERN RAKE CORNER.
Condition: Unknown
Due 3 November 1987
Resolved 3 November 1987
Construction/Loadline
Issued 3 November 1987
Resolved
CROP AND RENEW 4'X2'X2' CEMENT BOX IN STBD BOW RAKE CORNER.
Condition: Unknown
Due 3 November 1987
Resolved 3 November 1987
Construction/Loadline
Issued 3 November 1987
Resolved
GOUGE AND WELD 2 FRACTURES IN PORT BOW RAKE DECK KNUCKLE.
Condition: Unknown
Due 3 November 1987
Resolved 3 November 1987
Construction/Loadline
Issued 3 November 1987
Resolved
CROP AND RENEW BLKHD IN WAY OF #1P VOID/BOW RAKE AT BILDGE KNUCKLE.
Condition: Unknown
Due 3 November 1987
Resolved 3 November 1987
Construction/Loadline
Issued 3 November 1987
Resolved
GOUGE AND WELD 3' FRACTURE AT DECK KNUCKLE IN STERN RAKE
Condition: Unknown
Due 3 November 1987
Resolved 3 November 1987
Construction/Loadline
Issued 30 October 1987
Resolved
OFFLOAD CARGO AND GAS FREE FOR INSPECTION.
Condition: Unknown
Due 30 October 1987
Resolved 30 October 1987
Accommodation/Occupational Safety
Issued 13 July 1987
Resolved
CLEAN DECK/TANK TOP IN THE AREA OF #2 P/S AND #3 P/S CARGO TANK HATCHES.
Condition: Unknown
Due 13 July 1987
Resolved 13 July 1987
Construction/Loadline
Issued 13 July 1987
Resolved
REPAIR TORN DECK AND TIMBERHEAD ON PORT STERN.
Condition: Unknown
Due 13 July 1987
Resolved 13 July 1987
Construction/Loadline
Issued 13 July 1987
Resolved
RENEW TORN AND MISSING TIMBERHEAD ON STBD STERN.
Condition: Unknown
Due 13 July 1987
Resolved 13 July 1987
Construction/Loadline
Issued 13 July 1987
Resolved
MAKE PERMANENT REPAIRS TO 5' CRACK IN WELDED SEAM AT THE BOW RAKE PORT CORNER.
Condition: Unknown
Due 13 July 1987
Resolved 13 July 1987
Construction/Loadline
Issued 13 July 1987
Resolved
GOUGE AND REWELD #3 PORT CAVAL FOUNDATION.
Condition: Unknown
Due 13 July 1987
Resolved 13 July 1987
Deck/Cargo
Issued 6 May 1987
Resolved
MAINTAIN TEMPORARY REPAIRS TO P/V VALVE STAND PIPE ON #1 STARBOARD CARGO TANK. REMOVE SLEEVE AND MAKE PERMANENT REPAIRS NEXT TIME CARGO TANKS ARE GAS FREE BUT NOT LATER THAN NEXT DRYDOCKING (30 SEPT. 88)
Condition: Unknown
Due 6 May 1987
Resolved 6 May 1987
Deck/Cargo
Issued 2 March 1987
Resolved
REPAIR SEAL ON THERMAL FLUID HEATER PUMP,FOR FLUID TRANSFER.
Condition: Unknown
Due 2 March 1987
Resolved 2 March 1987
Deck/Cargo
Issued 2 March 1987
Resolved
REPAIR OIL LEAKS ON CARGO PUMP ENGINE.
Condition: Unknown
Due 2 March 1987
Resolved 2 March 1987
Deck/Cargo
Issued 2 March 1987
Resolved
REPAIR LEAKING OIL SEAL ON CARGO TRANSFER PUMP.
Condition: Unknown
Due 2 March 1987
Resolved 2 March 1987
Deck/Cargo
Issued 2 March 1987
Resolved
REPAIR LEAK ON THERMAL FLUID HEATER DIESEL OIL PUMP.
Condition: Unknown
Due 2 March 1987
Resolved 2 March 1987
Construction/Loadline
Issued 7 November 1985
Resolved
THIS REQUIREMENT IS A REISSUE OF ONE ISSUED 25OCT85. PRIOR TO LOADING THE NEXT CARGO, GAS FREE ALL WING VOIDS, BOW AND STERN RAKE AND #1 PORT CARGO TANK AND PRESENT VESSEL FOR INTERNAL EXAMINATION BY THE COGNIZANT COAST GUARD MARINE INSPECTOR, NO LATER THAN 30 NOV. 1985.
Condition: Unknown
Due 7 November 1985
Resolved 7 November 1985
Construction/Loadline
Issued 25 October 1985
Resolved
PRIOR TO RELOADING, GAS FREE ALL WING VOIDS, BOW AND STERN RAKE AND PRESENTTHE VESSEL FOR EXAMINATION BY [name withheld], MISSOURI. THIS INSPECTION SHALL BE CONDUCTED PRIOR TO THE VESSEL DEPARTING ST. LOUIS, BUT NOT LATER THAN 08 NOVEMBER 1985.
Condition: Unknown
Due 25 October 1985
Resolved 25 October 1985
Construction/Loadline
Issued 4 September 1985
Resolved
MAKE PERMANENT REPAIRS TO 3" HOLE APPROXIMATELY 4' BELOW THE DECK IN #4 WING VOID.
Condition: Unknown
Due 4 September 1985
Resolved 4 September 1985
Construction/Loadline
Issued 4 September 1985
Resolved
PAINT OUT ABS LOADLINE MARKS OR OBTAIN ANNUAL ABS LOADLINE ENDORSEMENT.
Condition: Unknown
Due 4 September 1985
Resolved 4 September 1985
Deck/Cargo
Issued 4 September 1985
Resolved
HYDROSTATICALLY TEST ALL CARGO PIPING AND STENCIL TEST PRESSURE ON PIPING OR RECORD ON TEST SHEET RECORD.
Condition: Unknown
Due 4 September 1985
Resolved 4 September 1985
Engineering
Issued 4 September 1985
Resolved
REPAIR OR REPLACE LEAKING SIGHT GLASS ON THERMAL FLUID HEATER EXPANSION TANK (PORT SIDE).
Condition: Unknown
Due 4 September 1985
Resolved 4 September 1985
Unknown
Issued 23 September 1983
Resolved
MAKE REPAIRS TO ALL VOID INTERNALS WITHOUT DELAY.
Condition: Unknown
Due 23 September 1983
Resolved 23 September 1983
Deck/Cargo
Issued 23 September 1983
Resolved
REPLACE WIRING DIAGRAM INSIDE THERMAL FLUID HEATER CONTROL PANEL AND REPLACE FUSE WITH PROPER SIZE.
Condition: Unknown
Due 23 September 1983
Resolved 23 September 1983
Documentation
Issued 23 September 1983
Resolved
HAVE ABS ENDORSE LOADLINE CERTIFICATE.
Condition: Unknown
Due 23 September 1983
Resolved 23 September 1983
Unknown
Issued 23 September 1983
Resolved
THE FOLLOWING DEFICIENCIES PERTAINS TO THE VESSEL APEX 3405, DN566651.
Condition: Unknown
Due 23 September 1983
Resolved 23 September 1983