Records from 1981 to 2019. Most recent: inspection, 2 October 2019.
Inspection history · 77
2 October 2019
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6825301
22 July 2019
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6763139
16 April 2019
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6669411
15 January 2019
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6608416
28 November 2018
Administrative Inspection · Drydock Exam · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6589176
15 March 2018
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6373045
15 March 2018
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6394622
27 December 2016
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6062715
16 December 2016
Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6059053
8 March 2016
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5829172
10 January 2016
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5831631
23 October 2014
Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5013435
23 October 2014
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5014816
26 June 2012
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4357535
12 September 2011
Drydock Exam · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4142911
24 February 2011
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3951548
13 December 2007
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3114855
17 September 2007
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3059996
4 September 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3049547
4 June 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2951207
14 May 2007
Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2930334
14 May 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2931068
18 July 2005
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2443286
26 April 2005
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2339549
24 June 2004
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2109355
10 June 2004
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2094632
28 February 2004
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2038223
5 November 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1942596
4 November 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1942502
3 November 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1943649
10 September 2003
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1901504
27 May 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1802989
28 February 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1758818
6 September 2002
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1671354
6 August 2002
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1667237
27 September 2001
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 212271
4 June 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1065536
30 May 2001
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1420523
16 August 2000
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 89162
16 August 2000
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1053194
25 April 2000
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1381836
11 January 2000
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 815244
29 July 1999
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 478302
11 March 1999
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1432066
31 March 1998
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1416668
4 April 1997
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1091365
10 March 1997
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1394697
25 November 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 132286
1 July 1996
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1084260
11 June 1996
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 877818
30 May 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 83091
30 May 1996
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1085537
2 May 1996
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1400346
30 December 1995
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 519864
3 April 1995
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1357127
13 March 1995
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 647655
16 February 1995
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 122409
16 March 1994
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1471476
28 June 1993
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1423803
5 March 1993
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 840822
13 July 1992
Administrative
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1359420
7 May 1992
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1357938
12 June 1991
Excursion Permit
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1027311
11 April 1991
Administrative
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 936266
8 April 1991
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 929372
7 February 1991
Re-Inspection · Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 901570
17 January 1991
Administrative
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 926154
15 October 1990
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1227275
11 October 1990
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 913418
23 February 1990
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1215553
16 February 1990
COI Inspection · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 902839
11 December 1989
Hull Examination · COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1230775
5 April 1989
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1036876
9 April 1986
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 998517
5 March 1986
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 986558
29 January 1985
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1285948
18 November 1981
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 964685
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 2 October 2019
Resolved
Dispensation shall not be granted to a Master or [name withheld] Vessel was granted a flag dispensation to sail with Engineer Officer of the watch instead of a [name withheld] shall provide documentation of a qualified [name withheld] that will be sailing with the ship prior to departure.
STCW 2011 Article VIII
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 2 October 2019
Resolved 3 October 2019
Resolution: Qualified Chief Engineer provided as required by Minimum Safe Manning Certificate.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 16 March 2018
Resolved
Identified a Doubler in the port side bulkhead between stern void/ballast #4, a crack on the centerline bulkhead ballast/void and two wasted areas in the rudder box inside the stern void. C/R and conduct NDT to the satisfaction of attending MI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 March 2018
Resolved 20 March 2018
Resolution: Witnessed NDT of inserts
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 15 March 2018
Resolved
Provide instructions for transfer procedures from main steering to auxiliary at the auxiliary steering station and prove proper operation.
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 May 2018
Resolved 20 March 2018
Resolution: Witnessed steering test verified proceedures and operation.
Deck/Cargo › Ballast › Tank
Issued 15 March 2018
Resolved
Remove water from stern void.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 19 March 2018
Resolved 19 March 2018
Resolution: Water removed found cracks in bulkhead issued 835 to make repairs.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 15 March 2018
Resolved
Prove proper operation of stern void bilge alarm.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 16 March 2018
Resolved 20 March 2018
Resolution: Verified proper operation
Navigation › Piloting/Steering › Marine Charts
Issued 15 March 2018
Resolved
Provide updated charts.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 15 March 2018
Resolved 20 March 2018
Resolution: Updated Charts onboard
Operations/Management › EPA Vessel General Permit (VGP) › 4.1.1.1-Documentation Routine Vessel Inspection
Issued 15 March 2018
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Due 15 April 2018
Resolved 21 June 2018
Operations/Management › Drills/Instruction › Not Conducted
Issued 15 March 2018
Resolved
Drills not conducted due to the fire main main being contaminated with oil. Flush system and conduct drills tothe satisfaction of attending MI.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 20 March 2018
Resolved 22 March 2018
Resolution: Witnessed drills.
Communications › Radio Communications › VHF Radiotelephone
Issued 28 December 2016
Resolved
Vessel does not have a VHF radio on emergency power. 47 CFR 80.905(a)(3).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 January 2017
Resolved 29 December 2016
Resolution: Witnessed operation of VHF radio on emergency power.
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 28 December 2016
Resolved
Fire detection system has not been tested. 46 CFR 181.05-5 (Old T).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 January 2017
Resolved 29 December 2016
Resolution: Witnessed operation of fire detection system.
Fire Fighting › Fire Hoses › Condition
Issued 28 December 2016
Resolved
01 fire hoses has a hole. 46 CFR 181.15-10 (Old T).
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 January 2017
Resolved 29 December 2016
Resolution: Verified replacement of bad hose.
Construction/Loadline › Hull › Side Shell
Issued 23 October 2014
Resolved
Vsl had thru hull penetration on STBD side shell below the water line. This thru hull penetration cut through to an oil tank.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 October 2014
Resolution: Section was cutout and replaced. Cutout was inspected and air tested; all sat.
Fire Fighting › Means of Escape › Emergency Lighting
Issued 12 September 2011
Resolved
Additional e-lighting needed at embarkation stations and in eng room.
Due 23 December 2011
Resolved 14 December 2011
Resolution: E lights were added to embarkation area and within eng room to luminate trip hazards.
Engineering › Fuel Oil Service System › Piping
Issued 12 September 2011
Resolved
Remove improper temp repair to fuel return line on stbd diesel generator.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 December 2011
Resolution: rubber sleeve removed and threaded pipe/union installed, tested sat.
Fire Fighting › Remote Fuel Shutoff › General
Issued 12 September 2011
Resolved
Prove proper operation of main engine shut downs from bridge
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 December 2011
Resolution: Electrician completed install and tested both main engine shut down from the bridge in presence of CGMI.
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 14 May 2007
Resolved
Vessel required to pump bilges prior to departure to a CG reception facility
Action required: 17 - Rectify deficiencies prior to departure
Due 14 May 2007
Resolved 14 May 2007
Resolution: Vessel removed 70 barrels of oily water from the bilges
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 14 May 2007
Resolved
Inspect and repair bulkhead between fuel tank and freshwater tank to the satisfaction of a CG Marine Inspector.
Action required: 705 - Other - as specified
Resolved 24 February 2011
Documentation › Markings/Placards
Issued 10 September 2003
Resolved
Missing MARPOL Placard LEGACY COMPONENT DESC: Oil Discharge Placard
Due 19 September 2003
Resolved 15 September 2003
Resolution: Provided MARPOL Placard
Lifesaving › Liferaft Equipment › Instructions (immediate action)
Issued 10 September 2003
Resolved
Missing Liferaft launching placard at liferaft station port side.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2003
Resolved 15 September 2003
Resolution: Provided liferaft placard for the port side.
Lifesaving › Rigid Liferafts › Hydrostatic Release Unit
Issued 10 September 2003
Resolved
Tighten belly straps on the stbd side liferafts.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 12 September 2003
Resolved 15 September 2003
Resolution: Tightened belly straps on stbd liferaft.
Fire Fighting › Fire Pumps › Arrangement
Issued 10 September 2003
Resolved
Fire pump was under repair and could not be tested at time of inspection.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2003
Resolved 15 September 2003
Resolution: Re installed fire pump piping and energized pump and two hoses with 60 psi.
Engineering › Compressed Air System (control)
Issued 10 September 2003
Resolved
Air receiver pop off valves did not go off LEGACY COMPONENT DESC: Valve
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2003
Resolved 15 September 2003
Resolution: Changed out pop off valves and tested satisfactorily.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 10 September 2003
Resolved
Provide name on stern of vsl
Condition: Design Flaw
Due 19 September 2003
Resolved 15 September 2003
Resolution: Painted name on the stern of the vsl.
Deck/Cargo › Vapor Control Systems › Flame Screens
Issued 10 September 2003
Resolved
Install flame screens in paint locker vents.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2003
Resolved 15 September 2003
Resolution: Installed 30x30 mesh flame screen in the paint locker vent.
Construction/Loadline › Penetrations › Gasket
Issued 10 September 2003
Resolved
Replace gasket on Engine Room deck hatch.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2003
Resolved 15 September 2003
Resolution: Replaced gasket on hatch.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 10 September 2003
Resolved
Show proof of hydro test of all cargo hoses or provide new certified hoses
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2003
Resolved 15 September 2003
Resolution: Replaced cargo hoses with new certificated hoses.
Fire Fighting › Means of Escape › Emergency Lighting
Issued 10 September 2003
Resolved
Install emergency lighting to illuminate emergency escape location in engine room.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2003
Resolved 15 September 2003
Resolution: Installed emergency light
Communications › Alarms/Indicators
Issued 10 September 2003
Resolved
Engine room alarm panel lights not operating properly LEGACY COMPONENT DESC: Lube Oil Low Pressure Alarm
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2003
Resolved 15 September 2003
Resolution: Replace bulbs in alarm panel.
Stability › Watertight Integrity
Issued 10 September 2003
Resolved
Dye pen two inserts in aft potable water tanks to ensure watertight integrity. LEGACY COMPONENT DESC: Aft of Engine Room WTB Inserts
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2003
Resolved 15 September 2003
Resolution: Hydro tested inserts and tested sat.
Engineering › Bilge Water Management System
Issued 25 July 2002
Resolved
Pump oily waste and water from engine room bilges. LEGACY COMPONENT DESC: Bilges
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: Bilges pumped.
Fire Fighting › Fire Pumps
Issued 25 July 2002
Resolved
Demonstrate proper operation of fire pump.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: Pump repaired and operational.
Navigation
Issued 25 July 2002
Resolved
Provide upated publications
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: Prubs provided
Lifesaving
Issued 25 July 2002
Resolved
Provide EPIRB registration
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: EPIRB registered.
Navigation
Issued 25 July 2002
Resolved
Demonstrate anchor windlass
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Stability › Watertight Integrity
Issued 25 July 2002
Resolved
Adjust engine room escape hatch.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: Hatch adjusted.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 25 July 2002
Resolved
Replace missing insulation on port engine exhaust.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: Insulation replaced.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 25 July 2002
Resolved
Repair 01 deck E-lights
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: E-lights repaired.
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 25 July 2002
Resolved
Provide non conductive mat
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: mat provided.
Engineering › Pressure Vessel
Issued 25 July 2002
Resolved
Replace pressure vessel gage
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: Gage replaced.
Engineering › Pressure Vessel
Issued 25 July 2002
Resolved
Make available for inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2002
Resolution: Tanks available for inspection, issued inspection credit.
Deck/Cargo
Issued 25 April 2000
Resolved
PROVIDE CRANCE SERVICE AND WEIGHT TEST REPORT IAW 46 CFR 109.521. TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 25 April 2000
Resolved 25 April 2000
Lifesaving
Issued 25 April 2000
Resolved
DEMONSTRATE COMPLIANCE WITH THE EIGHTH COAST GUARD DISTRICTS RESCUE BOAT POLICY LETTER DATED 12 NOV 1998, TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 25 April 2000
Resolved 25 April 2000
Documentation
Issued 10 March 1997
Resolved
PROVIDE CERT OF HYDRO TEST FOR FUEL TRANSFER HOSE(S).
Condition: Unknown
Due 26 March 1997
Resolved 26 March 1997
Engineering
Issued 10 March 1997
Resolved
PROVIDE EVIDENCE OF ADDING 200# RELIEF VALVE IN OUTBOARD PIPE OF FORWARD AIR RECEIVER.
Condition: Unknown
Due 26 March 1997
Resolved 26 March 1997
Engineering
Issued 10 March 1997
Resolved
PROVIDE EVIDENCE OF BOTH MN ENG REMOTE SHUTDOWNS WORKING PROPERLY.
Condition: Unknown
Due 26 March 1997
Resolved 26 March 1997
Documentation
Issued 10 March 1997
Resolved
PROVIDE OIL TRANSFER PROCEDURE CONFORMING TO 33 CFR 155.750.
Condition: Unknown
Due 10 April 1997
Resolved 4 April 1997
Documentation
Issued 10 March 1997
Resolved
PROVIDE ON BOARD 33 CFR.
Condition: Unknown
Due 26 March 1997
Resolved 26 March 1997
Electrical
Issued 10 March 1997
Resolved
PROVIDE DOCUMENTARY EVIDENCE OF GROUND FAULT ELIMINATION IN WAY OF #2 GEN (STBD).
Condition: Unknown
Due 26 March 1997
Resolved 26 March 1997
Lifesaving
Issued 30 May 1996
Resolved
Make permanent repairs to Port O1 deck railing by 30 June 1996.
Condition: Unknown
Due 30 May 1996
Resolved 30 May 1996
Lifesaving
Issued 30 May 1996
Resolved
Repair or replace 12 man liferaft Port side with equivalent raft to bring total lifesaving liferaft capacity to 100 percent of total authorized persons. Until this requirement met, Total Persons authorized is reduced to fifteen (15).
Condition: Unknown
Due 30 May 1996
Resolved 30 May 1996
Engineering
Issued 28 June 1993
Resolved
Provide 30 x 30 mesh flame screens for all vents requiring flame screens. Vessel is not to operate until this item is corrected.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Engineering
Issued 28 June 1993
Resolved
Repair and prove proper operation of number one (01) air receiver relief valve.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Accommodation/Occupational Safety
Issued 28 June 1993
Resolved
Provide filter for galley and head ventilation fans. Clean both fans before installing filters.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Accommodation/Occupational Safety
Issued 28 June 1993
Resolved
Properly anchor galley refrigerator to vessel.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Electrical
Issued 28 June 1993
Resolved
Repair and prove proper operation of emergency lighting in the vessel's engineroom. Vessel is not to operate until this item is corrected.
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Documentation
Issued 7 May 1992
Resolved
Provide evidence that vessel has a valid and current loadline certificate or remove the loadline markings from the vessel.
Condition: Unknown
Due 7 May 1992
Resolved 7 May 1992
Engineering
Issued 7 May 1992
Resolved
Draft machinery automation test procedures and submit for approval to:_x001C_ Marine Safety Detachment_x001C_ 111 Harbor Way_x001C_ Santa Barbara, CA 93109-2315
Condition: Unknown
Due 7 May 1992
Resolved 7 May 1992
Navigation
Issued 7 May 1992
Resolved
Provide Coast Guard approved naviagtion lights for the vessel. The currentlights were modified to accept household bulbs, negating their Coast Guard approval.
Condition: Unknown
Due 7 May 1992
Resolved 7 May 1992
Navigation
Issued 7 May 1992
Resolved
Provide an updated deviation card for the magnetic compass.
Condition: Unknown
Due 7 May 1992
Resolved 7 May 1992
Documentation
Issued 7 May 1992
Resolved
Provide and post a vessel specific waste managment plan.
Condition: Unknown
Due 7 May 1992
Resolved 7 May 1992
Construction/Loadline
Issued 7 February 1991
Resolved
Renew broken drill water/ballast transfer discharge valve at main deck station.
Condition: Unknown
Due 7 February 1991
Resolved 7 February 1991
Fire Fighting
Issued 7 February 1991
Resolved
Renew one 50 foot section of 1.5 inch fire hose and prove that another was manufactured to approved standard.
Condition: Unknown
Due 7 February 1991
Resolved 7 February 1991
Navigation
Issued 7 February 1991
Resolved
Repair rudder angle indicator at forward bridge station and prove operationin full follow up mode with #1 pump.
Condition: Unknown
Due 7 February 1991
Resolved 7 February 1991
Engineering
Issued 7 February 1991
Resolved
Repair and prove proper operation of port main engine overspeed prior to operation of the vessel.
Condition: Unknown
Due 7 February 1991
Resolved 7 February 1991
Documentation
Issued 7 February 1991
Resolved
Provide valid loadline certificate.
Condition: Unknown
Due 7 February 1991
Resolved 7 February 1991
Construction/Loadline
Issued 11 October 1990
Resolved
COMPLETE WORKLIST ITEMS #2-B,C,D,E,F. (PLUG NUMEROUS HOLES IN SUPERSTRUC- TURE, AND REPAIR ENGINE ROOM AIR INTAKE AND DISCHARGE COVERS.)
Condition: Unknown
Due 11 October 1990
Resolved 11 October 1990
Deck/Cargo
Issued 11 October 1990
Resolved
PROVIDE PROPER GUAGE FLAME SCREENS FOR AFT BALLAST TANKS #6 & 7 PRIOR TO CARRIAGE OF WEATHERED CRUDE OIL. ALSO AT PAINT LOCKER VENT.
Condition: Unknown
Due 11 October 1990
Resolved 11 October 1990
Deck/Cargo
Issued 11 October 1990
Resolved
WELD UP TWO FRACTURED DECK HATCH COLLARS IN TANK #3, AND 4. ALSO CONTINUOUSLY WELD FROM INSIDE 3 HATCH COLLARS; ONE IN #4 AND TWO IN #3. REPAIRS TO BE COMPLETED PRIOR TO CARRIAGE OF WEATHERED CRUDE IN THESE TANKS.
Condition: Unknown
Due 11 October 1990
Resolved 11 October 1990
Deck/Cargo
Issued 11 October 1990
Resolved
DRILL STOP, VEE AND WELD UP ABOUT 14 INCH FRACTURE RUNNING PARALLEL TO MAIN DECK IN STBD SIDESHELL JUST FORWARD OF AFT BULKHEAD IN TANK #4. REPAIR TO BE COMPLETED PRIOR TO CARRIAGE OF WEATHERED CRUDE IN THIS TANK.
Condition: Unknown
Due 11 October 1990
Resolved 11 October 1990
Documentation
Issued 11 October 1990
Resolved
PROVIDE CERTIFICATE OF DOCUMENTATION SHOWING CURRENT OWNER
Condition: Unknown
Due 11 October 1990
Resolved 11 October 1990
Engineering
Issued 16 February 1990
Resolved
PROVE PROPER INSTALLATION OF MAIN ENGINE KEEL COOLER LINES.
Condition: Unknown
Due 16 February 1990
Resolved 16 February 1990
Electrical
Issued 16 February 1990
Resolved
PROVIDE CG APPROVED DRAWINGS AND ISTALLATION FOR 12VDC SYSTEM.
Condition: Unknown
Due 16 February 1990
Resolved 16 February 1990
Lifesaving
Issued 5 March 1986
Resolved
PRIOR TO 5 APRIL 1986 HAVE THE PORT SIDE INFLATABLE LIFE RAFT AND HYDRO- RELEASE GEAR SERVICED AT A CERTIFIED SERVICING FACILITY. UNTIL SUCH TIME ASIT IS SERVICED THE TOTAL PERSONS ALLOWED IS REDUCED TO 10.
Condition: Unknown
Due 5 March 1986
Resolved 5 March 1986