BAYOU 14 J

BAYOU 14 J is a 1980 mobile offshore drilling unit. The Coast Guard has recorded 48 inspections since 1980, most recently in October 2003, along with 152 deficiencies — 3 with no resolution recorded — and 1 casualty investigation in 2003.

Records from 1980 to 2003. Most recent: inspection, 7 October 2003.

Built
1980
Last inspected
7 October 2003
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDB2805
Flag
VANUATU
366879990 (licence lapsed)
Maury page id
psix-51211

Inspections, by type

…with no type recorded19
…past their stated due date3
Years with a record 16 calendar years (1980–2003)
The 48 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 23 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it1962 - Regulatory (Subpart C or D), Net Ton
1951 - Convention (Subpart B), Net Ton
1962 - Regulatory (Subpart C or D), Gross Ton
1951 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDB2805MMSI 366879990 · expired · voluntarily equipped · granted 29 January 2003, cancelled 8 April 2013
WCZ6435MMSI not assigned · cancelled · voluntarily equipped · granted 26 January 2000, cancelled 17 March 2003
WCY5679MMSI not assigned · expired · voluntarily equipped · granted 16 July 1998, cancelled 20 September 2008 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 15

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

DAVID MCCALL II Passenger (Uninspected) · MISLE 50105 · 11 September 2003 · activity 1906873ELSIE D Passenger (Inspected) · MISLE 53417 · 11 September 2003 · activity 1906873BRAZOS EXPRESS Offshore Supply Vessel · MISLE 54423 · 11 September 2003 · activity 1906873GERMAINE Offshore Supply Vessel · MISLE 49970 · 17 March 2002 · activity 1494686SEA GULL Offshore Supply Vessel · MISLE 51548 · 3 July 1997 · activity 70762GLORITA Research Vessel · MISLE 346396 · 7 February 1997 · activity 146381SIR GAWAIN Passenger (Inspected) · MISLE 48005 · 25 November 1996 · activity 132286LONG ISLAND Offshore Supply Vessel · MISLE 49781 · 25 November 1996 · activity 132286MISS DEANNE E Passenger (Inspected) · MISLE 49827 · 25 November 1996 · activity 132286OPR VESSEL Offshore Supply Vessel · MISLE 53047 · 25 November 1996 · activity 132286TONY B. Passenger (Inspected) · MISLE 54133 · 25 November 1996 · activity 132286WMT Offshore Supply Vessel · MISLE 55295 · 25 November 1996 · activity 132286DOMINIC S Offshore Supply Vessel · MISLE 163051 · 25 November 1996 · activity 132286MISS ALLIE Passenger (Inspected) · MISLE 335762 · 25 November 1996 · activity 132286PAN PRODUCER Mobile Offshore Drilling Unit · MISLE 444428 · 25 November 1996 · activity 132286

Inspection history · 48

7 October 2003 Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1923287
11 September 2003 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1906873
5 August 2003 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1856157
1 March 2003 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1751218
25 February 2003 Administrative Inspection
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1749207
9 December 2002 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1716310
21 October 2002 Annual Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1693349
15 July 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1646684
20 May 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1620557
15 May 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1616956
17 March 2002 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1494686
6 August 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1070338
2 August 2001 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1384839
26 July 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1075005
10 July 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1068519
25 May 2001 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 10503
21 May 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1063586
27 September 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1054118
22 September 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 822928
7 August 2000 Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1445667
20 June 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1053309
10 June 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 818759
22 May 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 818632
18 April 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 816863
30 November 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 813354
27 September 1999 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1372772
7 October 1998 Persons In Addition to Crew
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 802731
10 August 1998 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1424642
10 August 1998 Deficiency Check · COI Inspection · Inclining Experiment
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1459431
26 May 1998 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1126067
3 July 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 70762
7 February 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 146381
25 November 1996 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 132286
31 August 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1465215
1 September 1993 Certificate of Compliance
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1403658
2 April 1986 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 998406
11 December 1985 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1297626
2 October 1985 Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 991682
31 July 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 985523
23 August 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 975162
13 August 1984 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1283503
29 June 1984 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 974085
17 August 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 967659
25 May 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1273388
28 May 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 966539
13 April 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968869
23 March 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1273865
24 March 1980 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 967954

Deficiency record · 152

Construction/Loadline
Issued 5 August 2003 No resolution recorded
Replace main sea chest valve.
Due 5 September 2003 — due date passed with no resolution recorded
Construction/Loadline
Issued 5 August 2003 No resolution recorded
Complete SEILOD phase II including swimby and NDT of all critical weld connections (i.e. leg to can) at next rig move.
Due 5 September 2003 — due date passed with no resolution recorded
Construction/Loadline
Issued 5 August 2003 No resolution recorded
Provide copy of SEILOD proposal.
Due 5 September 2003 — due date passed with no resolution recorded
Deck/Cargo
Issued 12 November 2002 Resolved
Prove proper operation of winch hydraulic pressure on starboard crane.
Due 12 December 2002
Resolved 9 December 2002
Deck/Cargo
Issued 12 November 2002 Resolved
Install and prove proper operation of adequate capacity load cells (weight indicating device) on both cranes.
Due 12 December 2002
Resolved 23 November 2002
Construction/Loadline
Issued 12 November 2002 Resolved
Provide proof of approval by the Marine Safety Center for latest revision of Construction Portfolio.
Due 12 December 2002
Resolved 5 March 2003
Electrical
Issued 12 November 2002 Resolved
Prove proper operation of drillers console purge alarm (loss of purge pressure).
Due 12 December 2002
Resolved 19 November 2002
Electrical › Electric Generation Source (service)
Issued 12 November 2002 Resolved
Prove proper operation of overspeed trip on #2 generator. LEGACY COMPONENT DESC: Generator
Due 12 December 2002
Resolved 18 November 2002
Lifesaving › Lifeboat
Issued 12 November 2002 Resolved
Remove the words "HERCULES 14" from lifeboat bows. LEGACY COMPONENT DESC: Markings
Due 12 December 2002
Resolved 18 November 2002
Electrical
Issued 2 August 2001 Resolved
Properly seal wiring penetrations at engine room bulkhead to make fixed CO2system effective.
Condition: Unknown
Due 9 August 2001
Resolved 16 August 2001
Accommodation/Occupational Safety
Issued 2 August 2001 Resolved
Make data plates on all pressure vessels (dry bulk & air receivers) legible
Condition: Unknown
Due 2 September 2001
Resolved 16 August 2001
Engineering
Issued 2 August 2001 Resolved
Renew flame screens on generator and emergency generator day tanks.
Condition: Unknown
Due 16 August 2001
Resolved 16 August 2001
Electrical
Issued 2 August 2001 Resolved
Properly secure wiring throughout rig as necessary with metal banding, replace missing fasteners on electrical fixtures throughout rig as necessary.
Condition: Unknown
Due 2 September 2001
Resolved 16 August 2001
Accommodation/Occupational Safety
Issued 2 August 2001 Resolved
Re-locate mud loggers shack to more suitable location, and replace the removed section of hand rails.
Condition: Unknown
Due 9 August 2001
Resolved 16 August 2001
Construction/Loadline
Issued 7 August 2000 Resolved
CROP AND RENEW OVER HEAD STIFFENER IN VOID 29 PORT, REWELD LADDER IN 8 STBD, AND REPLACE BENT BRACKET IN 29 PORT.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Engineering
Issued 7 August 2000 Resolved
RE-ROUTE FUEL OIL SUPPLY AND RETURN LINES BETWEEN DAY TANK AND SKID UNIT. NO SECTION OF FLEX LINE MAY EXCEED 30 INCHES IN LENGTH.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Lifesaving
Issued 7 August 2000 Resolved
REPLACE WINDOWS IN LIFEBOATS # 1 AND 2. POST LAUNCHING INSTRUCTIONS FOR BOATS, ADJUST DOGS ON HATCHES FOR PROPER DOOR CLOSURE.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Deck/Cargo
Issued 7 August 2000 Resolved
RENEW CRACKED WINDOWS ON PORT AND STARBOARD CRANES.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Lifesaving
Issued 7 August 2000 Resolved
PROVIDE IMO SYMBOL STICKERS FOR LIFERAFTS, RING BUOYS, AND LIFEBOATS.
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Electrical
Issued 7 August 2000 Resolved
PROVIDE CHAFING GEAR AS NECESSARY AT SHAKERS, REPLACE MISSING FASTENERS ON EXPLOSION PROOF FITTINGS, REMOVE NON-EXPLOSION PROOF GI-TRONICS FROM_x001C_ SHAKER AREA, AND PROPERLY BAND WIRING THROUGHOUT AS NECESSARY.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Construction/Loadline
Issued 7 August 2000 Resolved
COMPLETE UNDERWATER PORTION OF HULL EXAM AND NDE OF CRITICAL CONNECTIONS SUBMIT DIVE REPORT OT [name withheld].
Condition: Unknown
Due 7 August 2000
Resolved 7 August 2000
Engineering
Issued 27 September 1999 Resolved
REPLACE CURRENT FLEXIBLE FUEL HOSES (INTAKE AND TANK RETURN) ON EACH MAIN DIESEL GENERATOR. HOSE MUST BE SAE (SOCIETY OF AUTOMOTIVE ENGINEERS) STANDARD J1942; FITTINGS MUST BE OF THE FACTORY INSTALLED TYPE AND MEETING SAE J 1475
Condition: Unknown
Due 2 December 1999
Resolved 2 December 1999
Fire Fighting
Issued 27 September 1999 Resolved
FABRICATE AND POST INSTRUCTIONS FOR REMOTE AND LOCAL ACTIVATION OF FIXED CO2 SYSTEM FOR ENGINE ROOM. INCLUDE IDENTIFICATION OF COMPARTMENT PROTECTED.
Condition: Unknown
Due 2 December 1999
Resolved 2 December 1999
Accommodation/Occupational Safety
Issued 27 September 1999 Resolved
PROVIDE PROPER OPERATION OF RED FOX MSD SYSTEM, SUBMIT SEWAGE EFFLUENT FOR ANALYSIS.
Condition: Unknown
Due 2 December 1999
Resolved 2 December 1999
Electrical
Issued 27 September 1999 Resolved
INVESTIGATE AND PROVE PROPER OPERATION OF EMERGENCY GENERATOR AUTOMATIC START SEQUENCING. MUST MEET 46 CFR 122.50-1 (K) AND 112.50-5. THERE MUST BE A "CRANK FAILURE" OR "FAILURE TO START ALARM AFTER 3 UNSUCCESFUL STARTS.
Condition: Unknown
Due 2 December 1999
Resolved 2 December 1999
Lifesaving
Issued 27 September 1999 Resolved
IMPLEMENT TRAING PROGRAM IAW 46 CFR 109.213, INCLUDING; 1) METHOD OF TRACKING INDIVIDUALS TRAINING; 2) MANUAL OR WRITING WRITTEN GUIDANCE SHOWING HOW PROGRAM IS IMPLEMENTED (VIDEO BASED OR WRITTEN MANUAL; FREQUENCY OF TRAINING, ETC)
Condition: Unknown
Due 2 December 1999
Resolved 2 December 1999
Lifesaving
Issued 27 September 1999 Resolved
CONDUCT THE 110% FULL LOAD RELEASE GEAR TEST ON BOTH LIFEBOATS AS REQUIRED BY 46 CFR 109.301(i)(5)
Condition: Unknown
Due 27 September 1999
Resolved 27 September 1999
Deck/Cargo
Issued 27 September 1999 Resolved
CONDUCT ANNUAL CRANE INSPECTION IAW 46CFR107.259 IN PRESENCE OF COAST GUARDINSPECTOR. MAY BE PERFORMED BY CERTIFIED THIRD PARTY IN PRESENCE OF COAST GUARD INSPECTOR.
Condition: Unknown
Due 2 December 1999
Resolved 2 December 1999
Deck/Cargo
Issued 27 September 1999 Resolved
RESEARCH CRANE RECORD FILES TO DETERMINE WHEN LAST 5 YEAR WEIGHT TEST WAS PERFORMED TO MEET THE REQUIREMENT OF 46CFR107.259/260
Condition: Unknown
Due 2 December 1999
Resolved 2 December 1999
Lifesaving
Issued 10 August 1998 Resolved
LABEL EMERGENCY GENERATOR ALARM ON STBD SIDE OF RIG.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
ADJUST A60 DOOR FROM EMERGENCY GENERATOR SPACE TO MAIN GENERATOR TO CLOSE PROPERLY.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
PROVIDE GENERAL ALARM COVERAGE PORT/STBD, FWD/AFT AND COVERAGE IN ENGINE ROOM.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
LABEL CONTACT MAKER ON DRILL FLOOR.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
PROVIDE CRANE SAFETY LATCHES APPROPRIATE FOR LIFTING PERSONNEL FOR BOTH CRANE FAST LINES.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Electrical
Issued 10 August 1998 Resolved
PROVE PROPER OPERATION OF E-LIGHT OVER ACCOMODATION STAIR TOWER ON SECOND DECK.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Engineering
Issued 10 August 1998 Resolved
PROVE OPERATION OF FUEL SHUTDOWN VALVE REMOTE CABLE PULL FOR MAIN GENERATOR.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Unknown
Issued 10 August 1998 Resolved
PROVE PROPER OPERATION OF OVERSPEED ALARM ON # 1 MAIN GENERATOR SET.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Unknown
Issued 10 August 1998 Resolved
PROVE PROPER OPERATION OF LOW LUBE OIL ALARM ON # 3 MAIN GENERATOR SET.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Construction/Loadline
Issued 10 August 1998 Resolved
PROVIDE A SAFE PLATFORM TO ALLOW DOGGING OF VENT COVERS FOR ENGINE ROOM AFTER VENTS FROM MUD PIT ROOM.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Unknown
Issued 10 August 1998 Resolved
PROVE PROPER OPERATION OF LUBE OIL SHUTDOWN ON # 1 MAIN GENERATOR SET.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Electrical
Issued 10 August 1998 Resolved
REMOVE DEAD END WIRING FROM VESTIBULE ADJ. TO SCR ROOM STBD SIDE, THROUGHOUT RIG.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Engineering
Issued 10 August 1998 Resolved
LABEL MAIN/EMERGENCY GEN FUEL SHUTOFF VALVES AT BOTH REMOTE AND LOCAL LOCATIONS.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Fire Fighting
Issued 10 August 1998 Resolved
REPAIR LEAKING PACKING GLAND ON FIRE STATION NO 4.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
PROVIDE ONE ADDITIONAL LINE THROWING GUN KIT AS PER 46CFR108.597
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Unknown
Issued 10 August 1998 Resolved
PROVIDE [name withheld] WELL IN ORDER TO REASSESS LIFEBOAT/LIFERAFT SITUATION. PRIOR TO RIG MOVE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 August 1998
Resolved 16 October 1998
Electrical
Issued 10 August 1998 Resolved
COMPLETE REPAIRING WIRING SPLICES, REMOVE DEAD END WIRES.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
INSTALL 2 QUICK RELEASE SMOKE/LIGHT RINGBUOYS AS PER 46CFR108.580(A)(2)(III).
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
REPIAR ITEMS ON LIFEBOAT#2. STEERING, ENGINE PULL STOP, FUEL TANK VENT TUBE, CLEAN BILGE, LABEL # 2 ON EXTERIOR, CHECK COMPASS CALIBRATION, PROVIDE OPERATIONS MANUAL, REPAIR STARBOARD DOOR BRACKET, TEST RUN ENGINE.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Accommodation/Occupational Safety
Issued 10 August 1998 Resolved
PROVIDE BUNK LIGHT COVERS IN ACCOMADATION SPACES AS NEEDED EF 46CFR108.209
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Electrical
Issued 10 August 1998 Resolved
POVIDE ADDITIONAL E-LIGHTS UNDER LIFEBOAT #1, PROVIDE PROPER OPERATION OF ALL REMAINING E LIGHTS. PER 46CFR111.75-15(e).
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Electrical
Issued 10 August 1998 Resolved
LABEL BREAKERS ON ELECTRICAL PANEL PORT SIDE SECOND DECK.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Construction/Loadline
Issued 10 August 1998 Resolved
ADJUST ALL DOGS ON ALL WATERTIGHT DOORS AS NEEDED.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Unknown
Issued 10 August 1998 Resolved
INSTALL MOUNTING BRACKETS FOR THREE PIPES RUNNING ABOVE SHALE SHAKER AREA._x001C_ _x001C__x001C_ _x001C_
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
COMPLETE PAINTING HELO DECK PERIMETER MARKING AS PER 46CFR108.241(3)(ii)
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Fire Fighting
Issued 10 August 1998 Resolved
Complete installing activating handle on paint locker CO2 system.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
PROVIDE WEAKLINK FOR LIFERAFT AS PER 46CFR108.530(C)(7)
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Documentation
Issued 10 August 1998 Resolved
PROVIDE FIRE CONTROL PLAN FOR USCG APPROVAL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Engineering
Issued 10 August 1998 Resolved
PROVIDE FUEL/OIL TRANSFER PROCEDURES IAW 33CFR155_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Documentation
Issued 10 August 1998 Resolved
PROVIDE STABILITY LETTER BASED ON RECENT INCLINING TEST.
Condition: Unknown
Due 14 August 1998
Resolved 16 October 1998
Lifesaving
Issued 10 August 1998 Resolved
PROVE PROPER OPERATION OF PURGE ALARM ON DRILL FLOOR CONSOLE.
Condition: Unknown
Due 14 August 1998
Resolved 16 October 1998
Documentation
Issued 10 August 1998 Resolved
PROVIDE CURRENT LOADLINE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 August 1998
Resolved 16 October 1998
Documentation
Issued 10 August 1998 Resolved
PROVIDE COPY OF CONSTRUCTION PORTFOLIO APPROVAL LETTER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 August 1998
Resolved 16 October 1998
Lifesaving
Issued 10 August 1998 Resolved
UPON RECEIPT OF PORT LIFEBOAT FROM MANUFACTURER, CONTACT COGNIZANT [name withheld], TESTING, RELEASE GEAR DAVIT WEIGHT TEST.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Electrical
Issued 10 August 1998 Resolved
PROVIDE COVERS FOR ELECTRICAL OUTLETS/LIGHT COVERS THROUGH OUT RIG.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Documentation
Issued 10 August 1998 Resolved
PROVIDE OPERATIONS MANUAL FOR [name withheld].
Condition: Unknown
Due 14 August 1998
Resolved 16 October 1998
Documentation
Issued 10 August 1998 Resolved
PROVIDE APPROVED SOPEP.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Engineering
Issued 10 August 1998 Resolved
RELABEL FUEL STOPS #1 AND #2 ENGINE ROOM, PORT SIDE BULKHEAD.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Unknown
Issued 10 August 1998 Resolved
PROVE PROPER OPERATION OF OVERSPEED ALARM ON # 2 MAIN GENERATOR SET.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Electrical
Issued 10 August 1998 Resolved
MARK E LIGHT IN TREATMENT ROOM, MAIN GEN ROOM AND THROUGHTOUT RIG.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Electrical
Issued 10 August 1998 Resolved
INSTALL ADDITIONAL E-LIGHTS ON STERN ESCAPE LADDER AND CONTROL HOUSE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
PROVE PROPER OPERATION ON ALL GENERAL ALARM BELLS THROUGH OUT RIG. MOUNT BELL IN SHALE SHAKER AREA.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 10 August 1998 Resolved
PROVE PROPER OPERATION OF SNAKE PIT BILGE EDUCTOR AND CONTROL HOUSE.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Construction/Loadline
Issued 1 September 1993 Resolved
PROVIDE REPAIR PROPOSAL FOR PERMANENT REPAIRS TO BE MADE AS RECOMMENDED BY DET NORSKE VERITAS ON CERTIFICATE OF INTERIM CLASS._x001C_ (REPAIRS TO BE MADE NOT LATER THAN 31 AUGUST 1995)
Condition: Unknown
Due 1 September 1993
Resolved 1 September 1993
Documentation
Issued 1 September 1993 Resolved
PROVIDE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT IN ACCORDANCE WITH 40 CFR 125.120 PRIOR TO DRILLING OPERATIONS ON THE OUTER CONTINENTAL SHELF.
Condition: Unknown
Due 1 September 1993
Resolved 1 September 1993
Documentation
Issued 1 September 1993 Resolved
PROVIDE FOR APPROVAL AN EMERGENCY EVACUATION PLAN IN ACCORDANCE WITH 33 CFR146.140 AND 146.210 PRIOR TO OPERATIONS ON THE OUTER CONTINENTAL SHELF.
Condition: Unknown
Due 1 September 1993
Resolved 1 September 1993
Electrical
Issued 11 December 1985 Resolved
TEST THE OVERSPEED TRIP ON #1 GENERATOR.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Unknown
Issued 11 December 1985 Resolved
MAKE OPERABLE AND TEST THE PURGE AIR SYSTEM ON THE DRILL FLOOR. PRIOR TO COMMENCING DRILLING OPERATIONS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Documentation
Issued 11 December 1985 Resolved
PROVIDE EVIDENCE OF A CURRENT LOAD LINE CERTIFICATE PRIOR TO LEAVING THE PORT OF PORT ARTHUR, TEXAS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Electrical
Issued 11 December 1985 Resolved
RELOCATE THE TRANSFORMERS ON THE DRILL FLOOR TO A NON-HAZARDOUS LOCATION PRIOR TO COMMENCING DRILLING OPERATIONS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Lifesaving
Issued 11 December 1985 Resolved
COMPLETE INSTALLATION OF THE DAVIT ARM LIMIT SWITCH TO THE PORT LIFEBOAT FORWARD FALLS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Documentation
Issued 11 December 1985 Resolved
OBTAIN THE PROPER ENDORSEMENT ON THE CERTIFICATE OF DOCUMENTATION FOR COASTWISE SERVICE.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Deck/Cargo
Issued 11 December 1985 Resolved
PROVIDE EVIDENCE OF A CURRENT CRANE SURVEY FOR EACH CRANE PRIOR TO LEAVING THE PORT OF PORT ARTHUR, TEXAS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Unknown
Issued 11 December 1985 Resolved
PROVIDE TWO OPERABLE OXYGEN METERS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Construction/Loadline
Issued 11 December 1985 Resolved
SUBMIT PLANS TO [name withheld], TEXAS FOR INSTALLATION OF GUIDES AND LIMIT SWITCHES ON ALL LEGS. PRIOR TO LEAVING THE PORT OF PORT ARTHUR, TX.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Lifesaving
Issued 11 December 1985 Resolved
CONDUCT A WEIGHT TEST OF BOTH LIFEBOATS PRIOR TO LEAVING THE PORT OF PORT ARTHUR, TEXAS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Electrical
Issued 11 December 1985 Resolved
CONDUCT ALL OPERATIONAL TESTS ON THE FOUR INSTALLED GENERATORS, PRIOR TO LEAVING THE PORT OF PORT ARTHUR, TEXAS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Lifesaving
Issued 11 December 1985 Resolved
PROPERLY INSTALL ON BOTH LIFEBOATS TRICING PENANTS, BELLY GRIPES AND DAVIT ARM LOCKING MECHANISMS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Lifesaving
Issued 11 December 1985 Resolved
PLACE TWO COAST GUARD APPROVED BC TYPE I PORTABLE FIRE EXTINGUISHERS IN THEPORT LIFEBOAT PRIOR TO LEAVING THE PORT OF PORT ARTHUR, TEXAS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Accommodation/Occupational Safety
Issued 11 December 1985 Resolved
MAKE OPERABLE THE INSTALLED MARINE SANITATION DEVICE PRIOR TO LEAVING THE PORT OF PORT ARTHUR, TEXAS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Unknown
Issued 11 December 1985 Resolved
CONDUCT A FIRE AND BOAT DRILL PRIOR TO LEAVING THE PORT OF PORT ARTHUR, TX.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Unknown
Issued 23 August 1984 Resolved
THE FOLLOWING DEFICIENCY IS FOR THE PHOENIX SEADRILL BIGFOOT TWO, DN618078.
Condition: Unknown
Due 23 August 1984
Resolved 23 August 1984
Unknown
Issued 23 August 1984 Resolved
SUBMIT PLANS TO EIGHTH COAST GUARD DISTRICT (MMT) FOR THE INSTALLATION OF GUIDES AND LIMITING MECHANISMS ON ALL FOUR LEGS.
Condition: Unknown
Due 23 August 1984
Resolved 23 August 1984
Lifesaving
Issued 29 June 1984 Resolved
REPAIR OR REPLACE THE SPRINKLER SYSTEM IN CAPSULE #1 WITHIN THIRTY (30)DAYS
Condition: Unknown
Due 29 June 1984
Resolved 29 June 1984
Accommodation/Occupational Safety
Issued 13 April 1982 Resolved
REPAIR IMPROPER SPLICE IN WIRING AND SECURE WIRING PROPERLY OVER TOP OF CLOTHES DRYER.
Condition: Unknown
Due 13 April 1982
Resolved 13 April 1982
Electrical
Issued 13 April 1982 Resolved
RESECURE WIRE IN JUNCTION BOX ABOVE #4 AGITATOR MOTOR IN MUDPIT ROOM.
Condition: Unknown
Due 13 April 1982
Resolved 13 April 1982
Electrical
Issued 13 April 1982 Resolved
RESCUE WIRE LEADING TO MOTOR CONTROLER UNDER CONVEYOR BELT.
Condition: Unknown
Due 13 April 1982
Resolved 13 April 1982
Electrical
Issued 13 April 1982 Resolved
PROPERLY HANG ELECTRICAL WIRE LEADING TO LIGHT OVER SHARE SHAKER.
Condition: Unknown
Due 13 April 1982
Resolved 13 April 1982
Unknown
Issued 13 April 1982 Resolved
PROVIDE GUARDS ON AIR TUGGERS ON CANTILEVER BEAMS UNDER DRILL FLOOR AND AT THE STERN.
Condition: Unknown
Due 13 April 1982
Resolved 13 April 1982
Lifesaving
Issued 13 April 1982 Resolved
REPAIR MAN ROPES AND ROB RAILS ON BOTH LIFEBOATS.
Condition: Unknown
Due 13 April 1982
Resolved 13 April 1982
Lifesaving
Issued 13 April 1982 Resolved
REPAIR HULL ABRASION ON #2 LIFEBOAT IN ACCORDANCE WITH MFG'S RECOMMEN- DATIONS.
Condition: Unknown
Due 13 April 1982
Resolved 13 April 1982
Construction/Loadline
Issued 13 April 1982 Resolved
PROPERLY PAINT VESSELS NAME DRAFT MARKS, LOADLINE IN A CONTRASTING COLOR TOTHE HULL, RAISE NAME ON BOW P/S, RAISE NAME ON HAILING P/S.
Condition: Unknown
Due 13 April 1982
Resolved 13 April 1982
Construction/Loadline
Issued 13 April 1982 Resolved
SUBMIT WRITTEN PROPOSAL TO [name withheld] 30 DAYS FOR DAMAGE REPAIR TO STBD-AFT LEG IN ACCORDANCE WITH MFG RECOMMENDATIONS FOR REPAIRS
Condition: Unknown
Due 14 May 1982
Resolved 13 April 1982
Fire Fighting
Issued 13 April 1982 Resolved
PROVIDE AND MOUNT PROPER BRACKETS FOR PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 13 April 1982
Resolved 13 April 1982
Electrical
Issued 23 March 1982 Resolved
REPLACE PLASTIC TIE WRAPS WITH STEEL BANDING THROUGHOUT RIG.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
IN THE MUD PIT AREA, REMOVE ALL DEAD END WIRES, REPAIR WIRING FOR LIGHT OVER WALKWAY AND REMOVE NON-EXPLOSION PROOF LAB MIXER.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
PROVIDE GLOBE FOR LIGHT STBD SIDE OF SCR ROOM 46 CFR 111.75-15/20.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Construction/Loadline
Issued 23 March 1982 Resolved
MAKE PERMANENT REPAIRS TO STANCHIONS AND SUPPORTS LOCATED AFT END, PORT ANDSTARBOARD SIDES OF MUD PIT AREA.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
PROVIDE EYS SEALS FOR ALL JUNCTION BOXES ON DRILL FLOOR.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
PROVIDE EXPLOSION PROOF HORNS WITH EYS SEALS AS NECESSARY. PROVIDE WIRE RUN SUPPORT ON STBD SIDEFAT OF DRILL FLOOR.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
IN THE SHALE SHAKER AREA PROVIDE EYS SEAL ON AFT LIGHT PROVIDE EYS SEALS FOR DEGASSER MOVE MUD LOGGING SHARK OUT OF HAZARDOUS AREA.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
MAKE THE FOLLOWING CORRECTIONS TO THE DRILL FLOOR REWIRE ALL WIRING CON- TAINING SPLICES.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Documentation
Issued 23 March 1982 Resolved
DOCUMENT THE SUITABILITY OF THE MARTIN-DECKER, TOTCO, AND BARIOD EQUIPMENT IN THE MUD POTS, SHALE SHAKER AND DRILL FLOOR (HAZARDOUS LOCATIONS.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
PROVIDE POLLUTION CONTAINMENT AROUND ON BOARD TRANSFER POINTS AND FUEL TANKVENTS 33 CFR 155.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
REMOUNT SUPPORT FOR AIR LINES ON PORT SIDE OF DRILL FLOOR.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
REWIRE AND PROPERLY RUN SENSOR FOR DEAD MAN DRAWWORKES CABLE ANCHOR.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
CONDUCT AN INTERNAL EXAMINATION OF THE THREE RIG AIR RECEIVERS AND ONE DRILL FLOOR RECIEVER.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
PROVIDE SUITABLE HAND RELEAVING TYPE RELIEF VALVES FOR DRILL FLOOR AIR RE- CERIVER AND SMALL BLUE RIG AIR REC AND TEST INSTALLATIONS.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
PROVIDE PLACARD FOR MARINE SANCTATION DEVICE 33 CFR 159.59.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
REMOVEDEAD END WIRES BY CONTROLLER ON PORT SIDE UNDER DRILL FLOOR.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
PROPERLY PROTECT THE FUEL OIL DAY TANK SIGHT GLASSES.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
CONDUCT TEST OF THE OVER SPEEDS AND LOW LUBE OIL ALARMS FOR GENERATORS.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
TEST BOTH MUD PUMP RELIEF VALVES.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
REPAIR QUARTERS EXHAUST FAN REMOTE SHUT DOWN IN TOOL PUSHERS OFFICER 46 CFR111.80-10.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
PROVIDE BATTERY BOX FOR AUXILIARY GENERATOR.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
PROVIDE LEAD LINING OR EQUIVALENT FOR BATTERY BOX ON TOP OF CONTROL ROOM 46CFR 111.15.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
TEST REVERSE POWER RELAY FOR #3 GENERATOR AND EMERGENCY.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
PROVIDE ADEQUATE GENERATOR ALARMS FOR GENERATOR.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
REPAIR UNSUPPORTED DECK GRATING AROUND MUD PUMPS AS NECESSARY.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Documentation
Issued 23 March 1982 Resolved
PROVIDE CG APPROVED HAZARDOUS LOCATION PLAN 46 CFR 111.05-5(D)(22).
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Fire Fighting
Issued 23 March 1982 Resolved
PROVIDE PAINT LOCKER OR REMOVE PAINT 46 CFR 108.127.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Lifesaving
Issued 23 March 1982 Resolved
PROVIDE ONE BOAT HOOK, PROPERLY EQUIP LIFE JACKETS PROVIDE SPARE BATTERIES FOR FLASHLIGHT FOR BOAT #1.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Electrical
Issued 23 March 1982 Resolved
REPLACE ONE INOPERABLE BLUE LIGHT ON HELO DECK 46 CFR 108.241.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Navigation
Issued 23 March 1982 Resolved
PROVIDE REQUIRED DAY SHAPES.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Construction/Loadline
Issued 23 March 1982 Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Lifesaving
Issued 23 March 1982 Resolved
PROVIDE FOR BOAT #2 TWO BOAT HOOKS, (2) PROPERLY EQUIPPED LIFE JACKETS, ANDONE SEA ANCHOR.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Lifesaving
Issued 23 March 1982 Resolved
HINGE GRATING COVERING AREAS NEAR EMBARKATION LADDERS (2) 46 CFR 108.525.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
PROVIDE GUARDS FOR BELTS ON MARTIN-DECKER UNITS ATTACHED TO MUD PUMP.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Documentation
Issued 23 March 1982 Resolved
HAVE ANNUAL COAST GUARD ENDORSEMENT MADE ON CERTIFICATE OF REGISTRY.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Lifesaving
Issued 23 March 1982 Resolved
REPAIR AFT LIMIT SWITCH ON DAVIT FOR #2 BOAT (46 CFR 108.507).
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Lifesaving
Issued 23 March 1982 Resolved
REPAIR RESET SWITCH ON MOTOR CONTROLLERS FOR #2 BOAT (46 CFR 108.507).
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Lifesaving
Issued 23 March 1982 Resolved
SERVICE HYDROSTATIC RELEASE ON #2 LIFERAFT 46 CFR 108.505.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Lifesaving
Issued 23 March 1982 Resolved
PROVIDE ADDITIONAL CARTRIDGES AND AUXILIARY LINE FOR LINE THROWING GUN, TEST GUN AND LOG 46 CFR 108.517.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
MAKE BOTH OXYGEN METERS OPERATIONSL (WITH FIREMANS OUTFITS).
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Unknown
Issued 23 March 1982 Resolved
PROVIDE SAMPLING HOSES FOR BOTH EXPLOSIVE METERS.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Lifesaving
Issued 23 March 1982 Resolved
PROVIDE AND EQUIP RING BOUYS IN ACCORDANCE WITH 46 CFR 108.515.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Fire Fighting
Issued 23 March 1982 Resolved
CHARGE OUT BOTH LOW FIREMANS OUTFIT AIR BREATHING BOTTLES 46 CFR 108.479.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Navigation
Issued 23 March 1982 Resolved
RECONNECT NAVIGATIONAL LIGHTS ON MAST.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Navigation
Issued 23 March 1982 Resolved
REMOVE PAINT FROM PORT RUNNING LIGHT.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Fire Fighting
Issued 23 March 1982 Resolved
MAKE OPERABLE EXPLOSIVE METER IN FIREMANS OUTFIT NEAR PIPE RACK.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Fire Fighting
Issued 23 March 1982 Resolved
PROVIDE APPROVED 3 CELL FLASHLIGHTS AND SPARE BATTERIES FOR EACH FIREMANS OUTFITS.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Lifesaving
Issued 23 March 1982 Resolved
PROVIDE A TOTAL OF 12 RED PARACHUTE FLARES FOR RIG 108.521.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982
Documentation
Issued 23 March 1982 Resolved
PROVIDE PROPER FUEL OIL TRANSFER PROCEDURES.
Condition: Unknown
Due 23 March 1982
Resolved 23 March 1982

Casualty record · 1

11 September 2003Major Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · 15 injured · activity 1906873
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

PARKER DRILLING 14-J (2003). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.