MAURY USCG vessel records
← All vessels

C.R. MCCASKILL

Built
2012
Last inspected
5 May 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.

Inspection record

Last inspected 5 May 2026
…with no type recorded21
Operational controls None recorded without a removal date
Years with a record 15 calendar years (2012–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDG3808
590420
Flag
UNITED STATES
Tonnage
3040 - Convention (Subpart B), Gross Ton 912 - Convention (Subpart B), Net Ton
Maury page id
psix-590420
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 17

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. Only barges and towing vessels are in this archive, so any other vessel type in the same activity does not appear here: these lists are a floor, not a complete manifest.

598 Freight Barge · MISLE 142186 · 21 November 2024 · activity 8039583KATHY PAWG Towing Vessel · MISLE 183668 · 21 November 2024 · activity 8039583SEA CYPRESS Towing Vessel · MISLE 1240991 · 21 November 2024 · activity 8039583GERARD D Towing Vessel · MISLE 197668 · 17 August 2021 · activity 7289083MARGARET MCALLISTER Towing Vessel · MISLE 17416 · 1 June 2018 · activity 6433704ERIN MCALLISTER Towing Vessel · MISLE 439897 · 1 June 2018 · activity 6433704WEEKS 173 Freight Barge · MISLE 48769 · 12 June 2017 · activity 6261899ALEXANDRA Towing Vessel · MISLE 140943 · 12 June 2017 · activity 6261899MARSH ISLAND Towing Vessel · MISLE 106915 · 8 November 2016 · activity 6089049SEA WOLF Towing Vessel · MISLE 142140 · 31 January 2015 · activity 5064699DAVID R SCHANOCK Towing Vessel · MISLE 163085 · 31 January 2015 · activity 5064699KATHY PAWG Towing Vessel · MISLE 183668 · 31 January 2015 · activity 5064699SYDNEY T Towing Vessel · MISLE 188901 · 31 January 2015 · activity 5064699KIRBY 30015T Tank Barge · MISLE 445336 · 31 January 2015 · activity 5064699HOUSTON Towing Vessel · MISLE 881738 · 31 January 2015 · activity 5064699ANNA MICHAEL Towing Vessel · MISLE 1219294 · 31 January 2015 · activity 5064699KIRBY 29119 Tank Barge · MISLE 1227438 · 31 January 2015 · activity 5064699CAROLINE M Towing Vessel · MISLE 173216 · 1 May 2014 · activity 4849037

Inspection history · 53

5 May 2026 Vessel Attendance · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8367638
16 December 2025 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8313045
6 November 2025 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8265370
7 October 2025 Administrative Inspection · Deficiency Check · Periodic Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8244009
4 June 2025 Internal Structural Exam · Drydock Exam · Examination of Repairs · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8157301
10 February 2025 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8077746
13 December 2024 Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8054257
21 November 2024 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8039583
6 August 2024 Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7975159
5 July 2024 In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7949999
18 July 2023 Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7745449
9 July 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7745625
22 March 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7691296
17 September 2022 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7560948
11 July 2022 COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7503232
20 May 2022 Drydock Exam · Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7455532
29 September 2021 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7323378
26 August 2021 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7297096
17 August 2021 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7289083
3 August 2020 Internal Structural Exam · Welding Related Inspections Qualification Testing · Drydock Exam · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7024712
16 March 2020 Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6927438
12 March 2020 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6925311
6 January 2020 Administrative Inspection · Deficiency Check · Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6883789
6 January 2020 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6884435
18 December 2019 Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6876225
23 September 2019 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6819199
29 August 2019 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6798588
11 February 2019 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6624948
6 September 2018 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6534252
27 July 2018 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6490897
1 June 2018 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6433704
22 September 2017 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6272562
24 August 2017 Drydock Exam · Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6254547
15 July 2017 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6214425
14 July 2017 COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6204662
14 July 2017 Drydock Extension
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6228690
25 June 2017 Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6250417
12 June 2017 Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6261899
23 May 2017 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6153566
10 November 2016 Deficiency Check · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6043597
8 November 2016 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6089049
11 October 2015 Type not recorded
No type recorded · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 5808342
11 August 2015 Administrative Inspection · Periodic Inspection · Hull Examination · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5213207
5 May 2015 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5117955
5 May 2015 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5117994
31 January 2015 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5064699
6 November 2014 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5019161
15 May 2014 Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4859455
14 May 2014 Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4858405
1 May 2014 Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4849037
29 January 2014 Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4803339
8 October 2013 MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4730369
24 January 2012 Construction Oversight · Initial Certification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4230602

Deficiency record · 59

11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 7 October 2025 Resolved
On each rescue boat type II retro reflective material must be placed on the boat to meet that arrangement requirements in IMO resolution A.58(16). Retro tape on the boats was delamintating and damaged. Replaced with approved tape and provide photos to the Coast Guard. 46 CFR 199.176
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2025
Resolved 16 October 2025
Resolution: Tape was replaced.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 7 October 2025 Resolved
Fire pumps must be fitted with a pressure gauge on the discharge side of the pump. The discharge gauge was not reading pressure. Repair gauge and provide photos to the Coast Guard. 46 CFR 95.10-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2025
Resolved 16 October 2025
Resolution: Gauge was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 October 2025 Resolved
All marine engineering details installed on the vessel shall be IAW the provisions of subchapter F. The applicable standards established by ABS Rules (incorporated by reference, see § 58.03-1), may be used as the standard for auxiliary machinery. The turbochargers covered in this section are to be designed, constructed, operated, and maintained to: prevent the occurrence of fire and explosion. #1 Generator had an oil leak at the turbo charger. Repair leak and provie documentation to the Coast Guard. 46 CFR 90.20-1 ABS 4.2.2.1.2.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2025
Resolved 16 October 2025
Resolution: Oil leak was repaired.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 October 2025 Resolved
Instead of the 2.5" hose specified by table 95.10-5(a) of this part, on vessels more than 1,500 gross tons the exterior hydrants may substitute two 1.5" outlets , each with a 1.5" hose, supplied through a wye connection. All exterior hydrants were fitted with a single 1.5" hose with no wye connection. 46 CFR 95.10-10
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 November 2025
Resolved 18 December 2025
Resolution: New 2.5" hoses and racks were installed.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 10 June 2025 Resolved
Worklist items listed on 835v uploaded in documents. PORT side shell set-in, crop and renew. - STBD side shell set-in, crop and renew. - Frame 37 Top long crushed. - Frame 38 Stiffener popped weld. - Reach rod in #9 STBD void broken and hanging lose. - Approx 4’ x 4’ hull plate access cut-out. - Approx 6ft pot water piping in #9 machinery space wasted. - (2) 12” sea chest valves - (2) MSD/Grey water valves - (1) 3” raw water valve
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2025
Resolved 8 July 2025
Resolution: All worklist items repaired, tested SAT.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 18 July 2023 Resolved
Radio lifesaving appliance installations and arrangements must meet the requirements of 47 CFR part 80. Both bridge to bridge radiotelephony and safety telephony certificates expired on 12JUL202 46 CFR 199.60(a) 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2023
Resolved 8 August 2023
Resolution: Certificates were updated.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 18 July 2023 Resolved
Fire detection, manual alarm and supervised patrol systems in special cases must meet the applicable requirement of 46 CFR, part 76 of subchapter H of this chapter. (continues on page 2) Fire detection audible and visual alarms did not work in engine control room or engine room space when fire alarm was activated. 46 CFR 95.05-1 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2023
Resolved 11 August 2023
Resolution: Received report attesting purchase order of strobe lights for fire detection system.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 18 July 2023 Resolved
All marine engineering details such as piping valves, fitting, boilers, pressure vessels, etc., and their appurtenances installed on the vessel shall be designed, constructed and installed in accordance with provisions of subchapter F of this chapter. #1 Service pump had a hole in the 8” piping causing sea water to spray out. Permanent repair shall be enacted to the satisfaction of the marine inspector prior operation of equipment. 46 CFR 90.20-1 705C
Action required: 705 - Other - as specified
Due 2 August 2023
Resolved 8 August 2023
Resolution: Provided report and confirm during def check inspection.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 18 July 2023 Resolved
The boundary bulkheads and decks separating the accommodations and control stations from cargo and machinery spaces galleys, main pantries and storerooms, other than small lockers, shall be of “A” class construction. ECR to Engine room and E-gen to ECR fire doors did not completely close during self-closing operations. 46 CFR 92.07-10 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2023
Resolved 8 August 2023
Resolution: Resolved and confirmed during def check inspection
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 July 2023 Resolved
Lifejackets must have the following attachments and fittings: (i) Each lifejacket must have a lifejacket light approved under approval series 161.112 securely attached to the front shoulder area of the lifejacket. (ii) Each lifejacket must have a whistle firmly secured by a cord to the lifejacket. 02 lifejackets didn't have approved working lights while 01 lifejackets was completely missing a light. 46 CFR 199.70(b)(4) 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2023
Resolved 8 August 2023
Resolution: REsolved and confirmed during def check inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 18 July 2023 Resolved
Each cable installation must meet— (1) Sections 6, of IEEE 45.8–2016 (incorporated by reference; see § 110.10– 1 of this subchapter); or (2) Cables manufactured to IEC 60092–353:2016 must be installed in accordance with IEC 60092–352:2005 (both incorporated by reference; see § 110.10–1 of this subchapter), including clause 8. The Roxtec multiple cable watertight transit penetration on the port aft bulkhead was improperly installed; thus, compromising the watertight and fire boundary integrity of the space. 46 CFR 111.60-5(a) 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2023
Resolved 8 August 2023
Resolution: Resolved and confirmed during def check inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 11 July 2022 Resolved
Each vessel must have a line-throwing appliance; vessel did not have a line throwing appliance.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2022
Resolved 27 July 2022
Resolution: 4 impluse line throwers, 2 buoyant projectiles and 1500 ft aux line installed onboard.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 11 July 2022 Resolved
Bridge-to-Bridge Act applies to every dredge in or near a channel or fairway, in operations likely to restrict or affect navigation of other vessels; vessel did not have an FCC issued Bridge-to-Bridge certificate. 47 CFR 80.1001(d)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2022
Resolved 15 July 2022
Resolution: Third party issued bridge-to-bridge cert.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 July 2022 Resolved
Each fire hydrant must have a spanner wrench; hose station #4 did not have a spanner wrench.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2022
Resolved 27 July 2022
Resolution: Spanner wrench added to fire station.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 11 July 2022 Resolved
Each vessel must have posters or signs displayed in the vicinity of each survival craft's launching controls that illustrate the procedures for operating the launching device; rescue boat davit did not have an instruction placard for how to operate.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2022
Resolved 15 July 2022
Resolution: Placard installed at davit controls.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 11 July 2022 Resolved
Illustrations and instructions showing method of donning lifejackets must be conspicuously displayed at each muster station; vessel was missing required placard showing how to don lifejackets.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2022
Resolved 27 July 2022
Resolution: Placards posted.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 July 2022 Resolved
Vessel shall minimize fire hazards insofar as is reasonable and practicable; missing plugs for fuel filters in e-gen room.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2022
Resolved 12 July 2022
Resolution: Plugs installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 July 2022 Resolved
Suitable hand covers shall be installed in way of all exposed and dangerous places; duct smoke detector and coinciding wiring cover in mech room 106 was missing.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2022
Resolved 27 July 2022
Resolution: Covers installed.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 11 July 2022 Resolved
Each lifesaving appliance must be in working order and ready for immediate use; radar reflector on rescue boat was broken off.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2022
Resolved 15 July 2022
Resolution: New radar reflector installed.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 11 July 2022 Resolved
Rescue boat must be marked with name of the vessel on each side of the bow and the number of persons for which the boat is equipped; rescue boat was missing these required markings.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 August 2022
Resolved 12 July 2022
Resolution: Rescue boat marked.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 22 October 2021 Resolved
A load line certificate shall certify to the correctness of the load line marks assigned to the vessel and that the vessel is in compliance with the applicable requirements. MI's unable to determine whether the load line issued to the vessel is for manned or unmanned operations. Provide evidence of a manned load line within 30 days or vessel will be restricted to operating within the boundary line.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 November 2021
Resolved 5 November 2021
Resolution: Received statement from ABS affirming the LL Cert issued is for "manned" service
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 29 September 2021 Resolved
The test in paragraph (a)(1) of this section must be carried out whenever a wire fall for a launching appliance is replaced or turned end-for-end. The proper condition and operation of the survival craft and rescue boat launching appliances at loads ranging from light load to 10 percent overload. Falls were replaced, a load test must be performed and witnessed by a CG Marine Inspector.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 September 2021
Resolution: Witnessed load test
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 29 September 2021 Resolved
When the vessel is underway, the EPIRB must be stowed in its float-free bracket with the controls set for automatic activation and be mounted in a manner so that it will float free if the vessel sinks. The hydrostatic release is expired and must be replaced.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 October 2021
Resolved 30 September 2021
Resolution: Verified new hydro release installed.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 29 September 2021 Resolved
Paint lockers must have one 40-B portable extinguisher in the vicinity. Provide a 40-B in the vicinity of paint lockers.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 October 2021
Resolved 30 September 2021
Resolution: Verified installation of portable 40-B in vicinity of paint lockers on upper deck
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 29 September 2021 Resolved
Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes, stop valve controls and in the CO2 cylinder storage room. On systems in which the CO2 cylinders are not within the protected space, these instructions must also include a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate. Instructions for CO2 System operation are missing from remote control station on port and starboard side of the vessel. Provide instructions at remote stations as required.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 October 2021
Resolved 26 October 2021
Resolution: New instruction placards installed.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 19 November 2020 Resolved
No person may operate an Ocean going ship unless it is fitted with approved 15ppm oil filtering equipment. Vessel removed thier oil filtering equipment. Vessel removed their oil filtering equipment. Vessel must have an approved equivalency or exemption as listed in 33 CFR 155.120/130 by next dry dock or OWS will need to be reinstalled.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 August 2022
Resolved 26 August 2021
Resolution: Equivalency granted for them to operate without an OWS according to NVIC 6-94.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 6 January 2020 Resolved
A survey shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or whenever any important repairs or renewals are made. Vessel sustained a fire in the ER at engine to pump clutch assembly. Perform complete damage survey and provide repair proposal to CG Marine Inspector for approval prior to dredging operations. Upon approval, repair all damaged systems/materials to the satisfaction of the attending Marine Inspector. - 46 CFR 91.30 - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2020
Resolved 21 February 2020
Resolution: Rebuilt and tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 December 2019 Resolved
Subject vessel is Certificated under the regulatory application of Subchapter I. 46 CFR 90.25-1(a) of Subchapter I requires that all electrical engineering details and installation be designed and installed in accordance with Subchapter J (Electrical Engineering). Vessel shall be equipped with two sources of electrical power. Three of the vessel's three ship service generators were removed from service due to mechanical failures in the prime mover. Repair or replace at least two of the damaged ship service generators to the satisfaction of the attending Marine Inspector. The installation of temporary sources of power shall be to the satisfaction of the attending Marine Inspector. Any testing the Marine Inspector deems necessary to approve temporary measures shall be conducted to his or her satisfaction. 46 CFR 111.10-3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 January 2020
Resolved 23 November 2020
Resolution: Witnessed proper installation and testing of all generators onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 December 2019 Resolved
Provide sufficient means to monitor alarms and running status of both temporary sources of power.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 January 2020
Resolved 15 January 2020
Resolution: MI satisfactorily checked alarms and running status.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 September 2019 Resolved
When acknowledging alarm on fire detection panel, a trouble light is indicated due to a blown fuse. Crew replaced fuse multiple times with same result. Provide technician report of repairs.
Action required: 705 - Other - as specified
Due 10 October 2019
Resolved 20 December 2019
Resolution: Revived technician report.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 23 September 2019 Resolved
Galley rolling steal doors have no servicing record. Provide records to CG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2019
Resolved 20 December 2019
Resolution: Revived technician report.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 23 September 2019 Resolved
Multiple self-closing fire doors were found out of adjustment, and unable to close. Re-adjust doors and retest for proper closure.
Action required: 10 - Deficiency Rectified
Due 3 October 2019
Resolved 21 February 2020
Resolution: Crew made adjustments to all doors and retested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 September 2019 Resolved
Exhaust lagging on #1 Generator was found excessively worn. Replace lagging and provide proof of repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2019
Resolved 19 November 2020
Resolution: Exhaust lagging replaced and deemed adiquate by attending MI
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 23 September 2019 Resolved
Vessel’s MSD (sewage tank) was found leaking. Identify leak location and perform repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2019
Resolved 20 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 23 September 2019 Resolved
All three air receiver gauges installed max out at MAWP of air system. Gauges are required to be 1.2 to 1.5 times the designed pressure of the system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2019
Resolved 20 December 2019
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 23 September 2019 Resolved
Bulkhead penetration for battery maintenance station power cord was found without watertight conduit. Install approved watertight bulkhead penetration conduit.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2019
Resolved 20 December 2019
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 23 September 2019 Resolved
1-2 ventilation air damper indicating light was found extinguished. Prove proper function of light.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2019
Resolved 20 December 2019
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 23 September 2019 Resolved
Fire extinguisher located at sewage space access was found empty and bracket severely wasted. Replace fire extinguisher and bracket.
Action required: 10 - Deficiency Rectified
Due 3 October 2019
Resolved 20 December 2019
Resolution: Crew installed spare extinguisher
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 27 July 2018 Resolved
Multiple fuel/lube oil/hydraulic hoses on prome movers for both dredge pumps and 03 SSDG do not meet SAE J-1942 (cotton jacketed). Replace or install fire sleeves to meet SAE J-1842.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2018
Resolved 12 February 2019
Resolution: Hoses identified now have fire sleeves that meets SAE J-1942.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 July 2018 Resolved
Multiple electrical panels are not marked with equipment serviced or breaker size. Mark all electrical panels to accurately represent service.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2018
Resolved 12 February 2019
Resolution: All electrical panels now marked.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 27 July 2018 Resolved
MSD is leaking from top access panels. Odor of chemicals and contents is present in space and catch basin is full of effluent. Repair.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2018
Resolved 29 July 2018
Resolution: Attended vsl and MSD had been cleaned, valve opened correctly, and catch pan emptied and cleaned.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 July 2018 Resolved
Fire stations must be marked. Fire station #1 is not marked. Mark.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2018
Resolved 29 July 2018
Resolution: Fire station #1 marked.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 27 July 2018 Resolved
Each transfer pipe system must not leak under static liquid pressure at least 1.5 times MAWP. Transfer lines must be tested annually (or as part of biennial/ mid-period insp). Bunker lines have not been tested. Test bunker lines to 1.5 times MAWP.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2018
Resolved 12 February 2019
Resolution: All bunker lines have been tested and marked.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 July 2018 Resolved
The crew shall be protected from electrical hazards. Properly secure the battery selector switch for EDG.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2018
Resolved 12 February 2019
Resolution: Battery selector switch now properly secured.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 27 July 2018 Resolved
Diesel fuel piping shall comply with 46CFR56.50-75. Make permanent repairs to soft patch on day tank overflow pipe.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 August 2018
Resolved 19 November 2020
Resolution: Permanent repairs made to fuel pipe all sat.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 27 July 2018 Resolved
A vessel o/o req'd to have a Vessel Response Plan shall conduct the minimum req'd exercises. VSL is not conducting quarterly QI notification drill or any exercises required by 33 CFR 155.1060. Conduct all req'd drills and exercises.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2018
Resolved 12 February 2019
Resolution: Drills and excercises have been carried out, including QI notification.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 27 July 2018 Resolved
The transfer to the emergency power source must be automatic and accomplished in no more than 45 seconds after failure of normal source of power. The EDG failed to assume the load automatically. Affect repairs prior to departure to satisfaction of attending marine inspector.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2018
Resolved 29 July 2018
Resolution: Witnessed satisfactory testing of the EDG.
Lifesaving › Inflatable Liferafts › Painter
Issued 22 September 2017 Resolved
Liferafts were in various states of improper installation. Painters were routed behind packing straps, painters were not connected to the weak link of the hydrostatic release units, and hydrostatic release units were secured to the vessel with nylon rope. Correct installation to the satisfaction of the attending marine inspector.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 29 September 2017
Resolved 27 September 2017
Resolution: Inspector attended vessel to verify installation. Received additional photo documentation showing proper installation of HRUs directly to the liferaft stowage frame using a metal shackle to newly installed/welded cross beam.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 14 July 2017 Resolved
All Co2 Valves and controls shall be suitably protected. Port and Starboard Co2 pilot bottle valves are seized due to corrosion. Co2 unable to be activated as indicated on the Fire Equipment Plan. Provide report reflecting servicing and inspection of pilot bottle valves, attesting to their suitability for service as designed.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2017
Resolution: Inspected port and starboard control stations. Reviewed technician's report for work conducted by Hiller Systems.
Fire Fighting › Ventilation Systems › Ducts
Issued 14 July 2017 Resolved
The Co2 cylinder storage space for the engine room Co2 system is not ventilated. Install ventilation iaw approved design plans. Demonstrate ventilation in the presence of a marine inspector.
Condition: Improper Installation
Due 24 September 2017
Resolved 6 September 2017
Fire Fighting › International Shore Connection › Connection
Issued 14 July 2017 Resolved
There must be at least one shore connection to the fire main available to each side, in an accessible location. A fuel hose rack has been manufactured and attached to the starboard shore connection, as indicated on the fire equipment plan. Connection (ISC) is not readily accessible and is obscured. Remove fuel hose rack and ensure that the ISC connection remains unobstructed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 July 2017
Resolved 14 July 2017
Resolution: Corrected on the spot. fuel hose rack has been removed.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 14 July 2017 Resolved
Approved OWS system includes 15 ppm automatic stop valve. Stop valve does not effectively stop the flow of oily water mixtures in excess of 15 ppm from being discharged overboard. Lock out/tag out, complete repairs, and conduct satisfactory operational test in the presence of a USCG marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 September 2017
Resolved 6 September 2017
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 14 July 2017 Resolved
The previous name of the vessel, Weeks 315, is marked on the stern of the barge. The barge must be marked "C. R. McCaskill" on the stern to meet the requirements of 46CFR67.123.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 September 2017
Resolved 6 September 2017
Lifesaving › Rescue Boat › Propulsion Engine
Issued 14 July 2017 Resolved
Rescue boat has the incorrect outboard engine iaw manufacturer specification and USCG type approval. Verify that the outboard is approved for use or replace. Upon replacement conduct operational tests in the presence of a USCG marine inspector. Cites; 46 CFR 199.262(a), 46 CFR 160.156, and 46 CFR 199.190(i).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 September 2017
Resolved 22 September 2017
Resolution: Conducted dynamic weight tests of the winch brake, davit, and all components of the launching appliance. Conducted test of release mechanism. Mechanism activated "off-load" only. Witnessed satisfactory underway test of the 40 HP Evinrude outboard motor.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 10 November 2016 Resolved
Unable to test
Due 10 December 2016
Resolved 6 January 2017
Fire Fighting › Grease Extraction Hood › General
Issued 10 November 2016 Resolved
Deep fat fryer/griddle automatic fixed fire suppression system. Power has to be manually secured from panel located next to deep fat fryer. Power must be manually secured from a safe, remote location or automatically secured.
Due 10 December 2016
Resolved 6 January 2017
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 8 October 2013 Resolved
Install blank in distribution panel located in Galley.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 November 2013
Resolved 24 October 2013
Resolution: Blank installed
Lifesaving › Liferaft Equipment › Instructions (immediate action)
Issued 8 October 2013 Resolved
Post required PFD donning Placard in crew space
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 November 2013
Resolved 24 October 2013
Resolution: Placard Posted
Electrical › Lighting (emergency) › Lighting Fixture
Issued 8 October 2013 Resolved
Label ALL emergency lighting located in the Engine room/Mach Space.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 November 2013
Resolved 24 October 2013
Resolution: Labels/ Emergency "E" posted on required lighting fixtures.

Source. US Coast Guard records through 23 August 2026, retrieved 5 September 2026. Vessels the Coast Guard classes as Barge or Towing Vessel. Coverage and known gaps.

Maury does not score, rate, or grade vessels. What Maury does not do · Glossary · Correct a record.