Records from 2010 to 2026. Most recent: inspection, 8 January 2026.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSOUTHWEST SHIPYARD LP · GALVESTON, TX, UNITED STATES · built 2010
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHACKBERRY, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 13 August 2025 · expires 30 September 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Net Ton
735 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 27
8 January 2026
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8290744
26 February 2025
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8083790
20 March 2024
MTSA Verification · Examination of Repairs · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7882534
4 October 2023
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7799476
20 October 2022
Deficiency Check · MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7579448
6 October 2021
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7326251
25 January 2021
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7130499
17 September 2020
Examination of Repairs · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7056070
15 October 2019
Hull Examination · Cargo Tank Internal · Internal Structural Exam · Examination of Repairs · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6802314
6 June 2019
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6703353
23 May 2019
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6702210
14 February 2019
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6625623
10 April 2018
MTSA Verification · Periodic Inspection · Cargo Tank Internal · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6388606
16 June 2017
MTSA Verification · Annual Inspection · Administrative Inspection · Cargo Tank Internal
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6175879
29 December 2016
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6063422
12 July 2016
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5937595
29 May 2015
Internal Structural Exam · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5131972
19 September 2014
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4985541
2 March 2014
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4930054
6 November 2013
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4747253
20 September 2012
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4446621
31 August 2012
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4423849
19 August 2011
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4117381
18 February 2011
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3948356
18 February 2011
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3951656
3 January 2011
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3919811
1 May 2010
MTSA Verification · Cargo Tank Internal · Spot Check · Construction Oversight · COI Inspection · Drydock Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3800060
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 October 2022
Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1 and part 1, section 23 of NFPA 302 (both incorporated by reference; see 46 CFR 58.03-1)
Exhaust system piping and components shall be
independently supported to minimize failure from
vibration, shock, expansion and contraction.
During inspection of cargo pump engine, marine inspector observed crack in exhaust flexjoint leaking within ventilated hood. Rectify prior to discharging cargo.
46CFR58.10-5(d)(1)
ABYC 1.5.6
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 November 2022
Resolved 24 October 2022
Resolution: Verified replacement of flex-joint on cargo pump engine.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 17 September 2020
Resolved
An electric apparatus must be designed, constructed, and insulated to prevent any person from accidentally contacting energized parts.
Cable insulation lacerated at port portable alarm plug-in.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 October 2020
Resolved 17 September 2020
Resolution: Deficiency rectified to the satisfaction of the attending Coast Guard inspectors.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 6 June 2019
Resolved
On a tank barge, each cargo tank must be equipped with an overfill device that— Is an installed high-level indicating device that meets the requirements of 46 CFR 39.2003(b)(1), (2), and (3). High level alarms not working.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2019
Resolved 6 June 2019
Resolution: Vessel rep called out a tech rep that was able to demonstrate proper operation of the high level alarms.
Engineering › Diesel Engine (auxiliary) › Valve
Issued 16 June 2017
Resolved
Mechnical switch for oil pressure shutdown system was cracked and was leaking oil. Correct oil leak to the satifaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Due 16 July 2017
Resolved 16 June 2017
Resolution: Oil leak was fixed by replacing the fractured part.
Construction/Loadline › Hull › Hull Plating
Issued 18 February 2011
Resolved
18' Inset on Headlog approximately 2' deep
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 14 March 2011
Resolution: Bow rake C/R 18'' X 15'' X 1/2" BOTTOM PLATE SLOPE SHEET , C/R 30" X 6''6" X 3/4" ROLLED CORNER AND 18 '' X 25'' X 3/8" DECK PLATE . All air tested satisfactory.
Construction/Loadline › Hull › Hull Plating
Issued 18 February 2011
Resolved
3 fractures in top of Bow void. 12"x2", 5"x5", 8"x1"
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 14 March 2011