DBL 88 is a 2010 tank barge. The Coast Guard has recorded 24 inspections since 2010, most recently in January 2026, along with 4 deficiencies and 2 casualty investigations between 2011 and 2019.
Records from 2010 to 2026. Most recent: inspection, 8 January 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSOUTHWEST SHIPYARD LP · GALVESTON, TX, UNITED STATES · built 2010
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portHACKBERRY, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 13 August 2025 · expires 30 September 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Net Ton 735 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 October 2022Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1 and part 1, section 23 of NFPA 302 (both incorporated by reference; see 46 CFR 58.03-1)
Exhaust system piping and components shall be
independently supported to minimize failure from
vibration, shock, expansion and contraction.
During inspection of cargo pump engine, marine inspector observed crack in exhaust flexjoint leaking within ventilated hood. Rectify prior to discharging cargo.
46CFR58.10-5(d)(1)
ABYC 1.5.6
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 November 2022
Resolved 24 October 2022
Resolution: Verified replacement of flex-joint on cargo pump engine.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 17 September 2020Resolved
An electric apparatus must be designed, constructed, and insulated to prevent any person from accidentally contacting energized parts.
Cable insulation lacerated at port portable alarm plug-in.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 October 2020
Resolved 17 September 2020
Resolution: Deficiency rectified to the satisfaction of the attending Coast Guard inspectors.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 6 June 2019Resolved
On a tank barge, each cargo tank must be equipped with an overfill device that— Is an installed high-level indicating device that meets the requirements of 46 CFR 39.2003(b)(1), (2), and (3). High level alarms not working.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2019
Resolved 6 June 2019
Resolution: Vessel rep called out a tech rep that was able to demonstrate proper operation of the high level alarms.
Engineering › Diesel Engine (auxiliary) › Valve
Issued 16 June 2017Resolved
Mechnical switch for oil pressure shutdown system was cracked and was leaking oil. Correct oil leak to the satifaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Due 16 July 2017
Resolved 16 June 2017
Resolution: Oil leak was fixed by replacing the fractured part.
18 February 2011Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 3951656
23 May 2019Routine · role: Involved in a Marine Casualty · activity 6702210
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National