Records from 2003 to 2020. Most recent: inspection, 6 April 2020.
Inspection history · 35
6 April 2020
Ballast Water Examination · PSC B · COC-CHEM & TVE Renew
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6930450
26 April 2018
Ballast Water Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6399266
24 April 2018
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6398882
8 July 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6265329
8 May 2017
ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6191051
11 April 2016
ISPS II Exam · COC-CHEM & TVE Annual · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5844476
7 June 2014
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4891347
23 May 2014
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4866568
22 May 2014
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4877135
19 May 2014
ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Annual
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4854110
6 January 2011
Deficiency Check
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3916632
29 December 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3917489
28 December 2010
COC-CHEM Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3917046
27 December 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3916805
27 December 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4081403
5 March 2010
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3690598
4 March 2010
Random ISPS/MTSA-No PSC
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3689669
14 December 2009
Ballast Water Examination · Deficiency Check · ISPS II Exam · COC-CHEM Renew
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3650304
24 February 2008
MARPOL Annex I Examination · COC-CHEM Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3152507
13 April 2007
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2905323
17 March 2007
COC-CHEM Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2888392
20 September 2006
ISPS II Exam · Ballast Water Examination · MARPOL Annex V Examination · MARPOL Annex I Examination · COC-CHEM Annual
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2777696
19 September 2006
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2773299
21 June 2005
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2400583
10 June 2005
In-Service Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2386414
11 February 2005
Ballast Water Examination · ISPS II Exam · COC-CHEM Renew
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2285882
24 June 2004
COC-CHEM Annual · ISPS II Exam
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2109548
6 October 2003
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1922444
26 June 2003
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1833635
22 June 2003
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1827628
19 June 2003
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 1855026
5 May 2003
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1789838
20 February 2003
Security Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 1747165
10 February 2003
Letter of Compliance (Initial/Renewal)
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1742182
10 February 2003
Security Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1743522
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 19 May 2014
Resolved
1135 - Dangerous liquid chemicals in bulk - The inert gas system shall be designed, constructed and tested to the satisfaction of the administration. During an operational test of the nitrogen generator, the port state control officer found high pressure air leadking from the expansion joint over the #2 air compressor. - 74 SOLAS 01 CON. II-2/62.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 June 2014
Resolved 23 May 2014
Resolution: Vessel was found to have affected permanent repairs, one connection bellows piping was renewed in kind. Vessels was found in substantial compliance with applicable regulations governing this equipment.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 28 December 2010
Resolved
Each cargo tank must be equipped with an overfill device. Overfill device was found to be giving false indications. Rectify prior to loading MARPOL ANNEX I cargo. 33 CFR 155.480 17A/C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 December 2010
Resolution: Vessel rectified to the satisfaction of class and CG.
Operations/Management › Drills/Instruction › Fire
Issued 28 December 2010
Resolved
Every crew member with assigned emergency duties shall be familiar with these duties. During two separate fire drills crew members entered the space where the fire was simulated to retrieve first aid equipment, disregarding safe procedures for entering a space with fire.SOLAS 01 CH III REG 19.2.1 17A/C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 December 2010
Resolution: Vessel rectified to the satisfaction of class and CG.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 28 December 2010
Resolved
The crew contravened special requirements found in the IBC Code while loading XYLENE. Vessel high level was found to be giving false indications. Vessel high level alarms and overfill alarms were found in the off position several times during the exam. The Certificate of Fitness clearly states in the foot notes that high level alarms are to be tested prior to loading XYLENE. IBC 15.19.6 30A/C
Action required: 17 - Rectify deficiencies prior to departure
Due 11 January 2011
Resolved 17 January 2011
Resolution: Conducted satisfactory test of high level and overfill alarms.
Documentation › Logs/Records › Oil Record Book
Issued 28 December 2010
Resolved
The Oil Record Book part II shall be completed on each occasion of the cargo tank cleaning. The Oil Record Book part II entries from 03 Feb 2010 through 20 Feb 2010 do not account for 9.9 m^3 of slops in the STBD slop tank. MARPOL ANNEX I Reg 36.2.5 17 A/C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 December 2010
Resolution: Vessel rectified to the satisfaction of class and CG.
Fire Fighting › Structural Fire Protection - General › Cooking Area
Issued 28 December 2010
Resolved
Doors and door frames in "A" class divisions shall be constructed of steel. Class "A" fire door between galley and officer's mess has multiple holes compromising the effectiveness of the door. SOLAS 01 CH II-2 REG 47 17A/C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 December 2010
Resolution: Vessel rectified to the satisfaction of class and CG.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 28 December 2010
Resolved
Vessel vapor connection flange must have a permanently attached 0.5 inch diameter stud at least 1.0 inches long. Vessel's vapor connection missing stud on port and starboard side; rectify prior to loading vapor controlled cargo. 46 CFR 39.20-1(e) 17A/C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 December 2010
Resolution: Vessel rectified to the satisfaction of class and CG.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 28 December 2010
Resolved
Overfill alarm shall be labeled with "Tank Overfill Alarm" in black letters at least 50mm high on white background. Vessel overfill alarm was labeled "High Level." 46 CFR 39.20-7(d)(3) 17 A/C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 December 2010
Resolution: Vessel rectified to the satisfaction of class and CG.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 28 December 2010
Resolved
Tank overfill alarm required must have a visual alarm that can be seen in the cargo deck area and where cargo is controlled. Overfill light fixture is severely corroded, covered with a plastic bottle, and cannot be seen. 46 CFR 39.20-7(d)(2) 17A/C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 December 2010
Resolution: Vessel rectified to the satisfaction of class and CG.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 27 December 2010
Resolved
The vessel experienced main engine failure while docking. Prior to departure from the port of Houston the vessel must submit a Class Report identifying the cause of the engine failure as well as the proper repair and operation of the main engine.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 December 2010
Resolution: Received class report attesting to proper operation of the ships propulsion system.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 15 December 2009
Resolved
1850 The O2 analyzer for the IGG does not work. Ship's electrician removed the O2 analyzer from the N2 generator and installed it in the IGG system. Master has ordered a replacement O2 analyzer for the IGG system. Class is to ensure proper installation and calibration of O2 analyzers for both systems prior to cargo operations.
Action required: 17 - Rectify deficiencies prior to departure
Due 18 December 2009
Resolved 21 December 2009
Resolution: Received class report.