Records from 1992 to 2026. Most recent: inspection, 12 May 2026.
Documentation record
Registered dimensions (L × B × D)116.5 ft × 35.0 ft × 18.5 ft
Registered tonnagegross 189 / net 128
ITC dimensions (L × B × D)116.5 ft × 35.0 ft × 18.5 ft
ITC tonnagegross 555 / net 166
BuilderMAIN IRON WORKS · HOUMA, LA, UNITED STATES · built 1974
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 18 February 2026 · expires 31 March 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it189 - Regulatory (Subpart C or D), Gross Ton
555 - Convention (Subpart B), Gross Ton
128 - Regulatory (Subpart C or D), Net Ton
166 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 35
12 May 2026
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8371456
21 August 2024
Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7992626
9 May 2024
Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7909521
27 March 2024
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7885788
9 June 2023
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7710548
28 July 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7518451
21 June 2022
Damage Survey · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7485923
21 June 2022
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7489680
27 April 2022
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7439165
11 April 2022
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7429079
28 March 2022
Administrative Inspection · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7421995
21 December 2021
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7371192
25 September 2019
COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6820446
8 December 2017
Industry Initiated Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6321188
8 February 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6085106
12 March 2016
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5836265
8 April 2015
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5099032
15 February 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5070049
30 December 2014
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5048959
8 December 2014
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5036340
20 November 2014
Industry Initiated Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5027569
12 November 2014
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5034194
29 April 2012
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4333802
6 October 2011
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4162721
9 June 2011
Industry Initiated Exam · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4037341
13 December 2010
Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3910253
13 December 2010
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3913585
15 May 2009
Plan Review (Other than "T")
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3475646
20 January 2009
Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3399223
8 May 2008
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3201716
5 December 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3112764
4 August 2006
MTSA/ISPS Verification · Uninspected Other
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2740458
22 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1981943
2 December 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 20583
23 December 1992
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 139285
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 August 2024
Resolved
Machinery or electrical systems must be designed and maintained to provide safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. It was reported that vessel lost a propeller from starboard side shaft causing damage to the clutch. Vessel is to transit to lay berth to undergo further repairs. IAW NVIC 17-10, upon successful completion of repairs, TPO may clear this vessel to operate and must report doing so within 72 hours of clearing deficiency to the local USCG OCMI.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 August 2024
Resolution: TPO Provided Report
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 May 2024
Resolved
There must be an installed or portable bilge pump for emergency dewatering. Any portable pump must have sufficient hose length and pumping capability. All installed bilge piping must have a check/foot valve in
each bilge suction that prevents unintended backflooding through bilge piping. Vessels installed bilge pump failed to operate in the aft steering compartment. Vessel is required to repair the bilge system and test the operation in the presence of a Marine Inspector. Inspector received objective evidence of fwd and aft bilge suction functioning. Steering compartment still not functioning, vessel has portable dewatering pump on standby for space and allowed to sail. Steering compartment will need to be witnessed by a CG marine inspector to clear. Due 5/18/2024.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2024
Resolved 9 May 2024
Resolution: Video evidence of bilge pump working was submitted.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 May 2024
Resolved
Towing vessels of more than 65 feet in length between 100-500 GT must carry 3 40-B:C extinguishers, 6 40-B extinguishers for HP in the engine room, and one 40-B extinguisher per flammable storage locker. The vessel has 3 acceptable extinguishers for tonnage requirement, 2 extinguishers acceptable for HP requirement, and zero extinguishers for flammable storage. Outfit properly.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 May 2024
Resolution: Vessel purchased and placed on board the correct extinguishers.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 3 May 2024
Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. The fwd hold hatch did not have a gasket installed.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 May 2024
Resolution: Vessels TPO sent in report indicating def was cleared.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 3 May 2024
Resolved
Emergency lighting must be provided for all internal crew working and living areas. E-lighting was installed in working and living areas but did not operate.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 May 2024
Resolution: Vessels TPO sent in report indicating def was cleared.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 May 2024
Resolved
Each towing vessel must be equipped with a means to detect smoke in the berthing spaces and lounges that alerts individuals in those spaces. Smoke detectors were either missing or failed to operate in berthings, pilothouse, and common areas.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 May 2024
Resolution: Vessels TPO sent in report indicating def was cleared.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 3 May 2024
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Engineer and Mate's staterooms had multiple multi-outlet power strips with numerous devices plugged in creating a potential overload situation on the respective circuits.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 May 2024
Resolution: Vessels TPO sent in report indicating def was cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 May 2024
Resolved
Any piping system that penetrates the hull below the waterline must be clearly marked by labeling or color coding that enables the crew to identify its function. Numerous valves in the engine room did not have any labeling or color coding.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 May 2024
Resolution: Vessels TPO sent in report indicating def was cleared.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 May 2024
Resolved
Paints, coatings, or other flammable or combustible products onboard a towing vessel must be stored in a designated storage room or cabinet when not in use. Inspection found an abundance of flammable chemicals/sprays located throughout vessel. All items need to be stored in the supplied flammable storage cabinets.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 May 2024
Resolution: Vessels TPO sent in report indicating def was cleared.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 3 May 2024
Resolved
Essential systems or equipment must be regularly tested and examined. Tests and examinations must verify that the system or equipment functions as designed. Test and examination procedures must be in accordance with manufacturer's instructions or the Towing Safety Management System (TSMS) applicable to the vessel, if the vessel has a TSMS. The bilge dewatering system is required to be tested every 3 months. Provide objective evidence that the essential system is being tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2024
Resolution: Vessels TPO sent in report indicating def was cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 March 2022
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must be suitable for route and service. Vessel reported loss of propulsion. Vessel is permitted a one way transit lightship to Bludworth Shipyard in Corpus Christi TX IAW with transit plan.
No repairs or alterations affecting the safety of the vessel or its machinery shall be made unless repair proposal is submitted to and approved by the CG.
Company is authorized to carry out repair oversight in accordance with their TSMS but final 835 clearance must be obtained by the CG prior to the vessel departing Bludworth Shipyard. Examples of objective evidence for clearance can include, but not limited to dive report/tech report/TPO report.
46 CFR 143.205(c)(2)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 April 2022
Resolution: Received satisfactory survey report from ABS and statement from [name withheld] attesting to satisfactory repair of the vessel. Attached in MISLE documents.