Records from 2015 to 2025. Most recent: inspection, 8 July 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 13.0 ft
Registered tonnagegross 1,754 / net 1,754
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2015
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 17 November 2025 · expires 31 December 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1754 - Simplified, Gross Ton
1754 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
8 July 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8179521
31 January 2025
MTSA Verification · Examination of Repairs · COI Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8072945
5 July 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7498436
26 May 2022
Administrative Inspection · Periodic Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7459479
30 August 2021
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7335095
16 March 2020
MTSA Verification · Examination of Repairs · COI Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6919983
28 February 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6917524
14 January 2019
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6607908
19 January 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6336910
23 November 2016
Type not recorded
No type recorded · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6046779
9 September 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5994429
18 August 2016
Deficiency Check · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5976725
18 August 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6027214
9 June 2016
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5902291
30 May 2016
Damage Survey · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5894978
20 August 2015
MTSA Verification · Initial Construction-Excluding Oversight · Hull Examination · Initial Certification · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5759968
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 May 2022
Resolved
Electric installations on vessels must ensure maintenance of system integrity through compliance with the applicable system requirements to which plan review has been approved. Noted electrical components not properly installed on generator. Return to as approved condition by 30JUN2022.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2022
Resolved 1 June 2022
Resolution: Received Technician report and picture of replaced panel.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 28 February 2020
Resolved
When major alterations or major repairs of tank vessels become necessary the work shall be done under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect for new construction insofar as possible. When minor alterations or minor repairs of tank vessels become necessary such work shall be under the direction of Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect at the time the vessel was contracted for or built, or in accordance with the regulations in effect for new construction insofar as possible. Vessel reported damage to hull on starboard side center consisting of inset approximately 5'L X 2'W X 3-4"D. Crop hull plating back to good metal and Repair to the satisfaction of an attending Coast Guard inspector.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2020
Resolved 16 March 2020
Resolution: Conducted satisfactory air tests at 1.5 psi.
Construction/Loadline › Hull › Hull Plating
Issued 18 August 2016
Resolved
2 foot inset covering the entire headlog and width of barge. 2 foot hull tear in headlog extending downward from port mooring button. Heavy inset to hull in bow rake under headlog. Provide transit and repair plans to the satisfaction of the attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 August 2016
Resolved 30 August 2016
Resolution: Repaired bow with new steel plate. All requirements met. See narrative for details.
Construction/Loadline › Hull › Side Shell
Issued 30 May 2016
Resolved
Coast Guard Sector Houston/Galveston Personnel Identified damage on #2 starboard sideshell inset 20' x 4' x 5". #4 starboard side sideshell inset 16' x 4' x 6" with a 6' x 3" fracture. make permanent repairs to the satisfaction of attending Coast Guard Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 June 2016
Resolved 9 June 2016
Resolution: Witnessed satisfactory test of all repairs.