Records from 2008 to 2024. Most recent: inspection, 26 December 2024.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2008
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 2 December 2025 · expires 31 January 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Net Ton
1619 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 32
26 December 2024
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8050872
11 April 2023
MTSA Verification · Cargo Tank Internal · COI Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7656322
10 April 2022
Administrative Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7427925
9 December 2021
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7337811
30 August 2021
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7335095
13 July 2021
Periodic Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7246741
4 April 2021
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7169014
31 January 2020
Annual Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6891444
27 August 2019
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6796668
3 August 2019
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6771154
2 August 2019
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6770795
2 August 2019
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6774650
6 July 2019
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6743291
1 July 2019
MTSA/ISPS Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6731753
20 August 2018
Examination of Repairs
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6521347
20 July 2018
Administrative Inspection · Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6485564
18 July 2018
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6484601
12 March 2018
Examination of Repairs · COI Inspection · Cargo Tank Internal · MTSA Verification · Internal Structural Exam · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6366883
11 September 2017
COI Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6264300
7 September 2017
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6261919
8 July 2016
Administrative Inspection · MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5934040
10 July 2015
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5179969
5 September 2014
Annual Inspection · Deficiency Check · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4973527
6 December 2012
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4499510
22 August 2012
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4418812
6 August 2012
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4403558
12 March 2012
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4261967
29 July 2011
MTSA Verification · Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4096853
17 June 2010
Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3769217
12 January 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3662874
11 June 2009
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3781489
2 April 2008
MTSA Verification · Initial Certification · Initial Construction-Excluding Oversight · Internal Structural Exam · Cargo Tank Internal · Hull Examination
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3176080
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 14 April 2023
Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked, and located at the midpoint of such vessel, or 100 feet from the engine, whichever is the more practical. The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine (such as by cutting off the intake air). Prime mover for cargo pump was not connected to the remote shutdown.
46 CFR 32.50 35(a)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 14 April 2023
Resolved 14 April 2023
Resolution: Prior to departing the vsl Remote shutdown of the prime mover was repaired and tested to the satisfaction of the attending Marine inspector.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 11 April 2023
Resolved
Each pressure gauge must show pressure within 10 percent of the actual pressure. Vessel could not provide documentation for 03 pressure gauges to show that they are within the 10 percent accuracy.
33 CFR 156.170(c)(3)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 14 April 2023
Resolved 14 April 2023
Resolution: Gauges replaced and calibration documentation provided to the attending marine inspector, all sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 April 2022
Resolved
Piping system components shall be suitable for use with the cargoes for which the barge is certificated, and shall be of materials listed in Subchapter F of this chapter, or such other material as the Commandant may specifically approve. All piping materials shall be tested in accordance with the requirements of Subchapter F of this chapter. The valve seat material, packing, gaskets, and all other material which comes into contact with the cargo shall be resistant to the chemical action of the cargoes for which the barge is certificated.
Vessel reported a cracked weld where the cargo piping leading to the pump in the #3 starboard cargo tank meets the deck, which led to a small amount of asphalt leaking on deck. Vessel is authorized a 1 time discharge of cargo, but must complete repairs to the satisfaction of the Coast Guard prior to next cargo operations.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 April 2022
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 2 August 2019
Resolved
Vessel has run a ground on or near forward portside #1 wing tank. Vessel must proceed with plans to secure and free, by means of lightering if necessary in order to proceed to safe facility to unload cargo and conduct survey for damage and make repairs. Vessel is not authorized to conduct any further cargo operations or transits until damage survey and repairs are conducted to the satisfaction of Marine Inspectors/OCMI. Vessel shall keep US Coast Guard, MSU Chicago informed of all evolutions concerning damage survey, repairs, and operations to free from grounding.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 4 August 2019
Resolution: Vessel has completed lightering operations, temporary repairs and is ground free. Empty vessel is authorized to proceed to New Orleans for permanent repairs with issued PTP.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 August 2012
Resolved
Required to place lagging back on turbo's for both cargo pumps.
Action required: 705 - Other - as specified
Due 6 September 2012
Resolved 22 August 2012
Resolution: Verified that lagging was properly installed on the turbochargers for both cargo pump engines.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 2 April 2008
Resolved
Vessel owner shall prove that cargo pump engine units are in complete compliance with 46 CFR 111.105-31(l).
Action required: 705 - Other - as specified
Due 1 November 2015
Resolved 5 September 2014
Resolution: Barge downgraded cargo authority to D and lower, eliminating the need for compliance with Class I Division 1 standards.