Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 13.0 ft
Registered tonnagegross 1,754 / net 1,754
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · ASHLAND CITY, TN, UNITED STATES · built 2005
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 1 July 2026 · expires 31 July 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1754 - Simplified, Gross Ton
1754 - Simplified, Net Ton
5590 - Displacement, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 43
18 August 2026
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 8467219
11 August 2025
Internal Structural Exam · Cargo Tank Internal · COI Inspection · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 8205288
16 October 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8017197
8 July 2024
Bulk Liquid Transfer Monitor
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7953320
27 September 2023
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7801744
29 July 2023
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7764365
5 July 2023
Periodic Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7733920
31 August 2022
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7546573
15 February 2022
Damage Survey · Deficiency Check · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7396871
13 February 2022
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7395916
12 February 2022
Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7395570
5 October 2021
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7326149
10 August 2021
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7282922
1 September 2020
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7058065
22 July 2020
Examination of Repairs · Internal Structural Exam · Administrative Inspection · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7013083
9 September 2019
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6804547
29 August 2018
Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6563835
16 May 2017
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6146586
18 May 2016
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5879487
29 June 2015
Internal Structural Exam · COI Inspection · Cargo Tank Internal · Administrative Inspection · Examination of Repairs · In-Service Inspection · MTSA Verification · Drydock Exam
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 5187026
23 January 2015
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5057924
12 September 2014
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4981692
19 August 2014
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4959518
18 August 2014
Damage Survey · Deficiency Check · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4958557
16 August 2014
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4959408
5 October 2013
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4730590
13 September 2013
MTSA Verification · Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4714236
7 November 2012
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4480379
4 September 2012
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4431293
24 August 2011
MTSA Verification · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4123792
7 November 2010
Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 3888002
6 November 2010
Type not recorded
No type recorded · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 3886982
25 June 2010
Deficiency Check · MTSA Verification · COI Inspection · Internal Structural Exam · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3776049
2 September 2009
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3585000
19 January 2009
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3397308
29 September 2008
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3334971
25 June 2008
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3247873
4 September 2007
Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3048372
29 August 2007
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3041056
9 May 2007
Type not recorded
No type recorded · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 2926917
28 April 2006
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 2636138
27 June 2005
COI Inspection · Construction Oversight · Internal Structural Exam · Deadweight Survey · Cargo Tank Internal · Initial Certification · MTSA Verification · Hull Examination
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 2399249
13 June 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2388910
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 July 2023
Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1 and part 1 of NFPA 302 (incorporated by reference). Noted an exhaust leak on cargo pump prime mover downline from the turbo. Repair within 30 days
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 August 2023
Resolved 19 July 2023
Resolution: recvd photo evidence of clearance.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 13 February 2022
Resolved
Barge sustained damage to the #3 PORT side hull near the knuckle and the bulkhead between the #3 and #4 PORT side void spaces. Two 1-2 inch hairline fractures were observed in the knuckle area of the #3 PORT side hull. Temporary repairs have been completed to the satisfaction of the attending USCG marine inspector. After discharging the cargo currently onboard in Memphis, TN, the MM 75 shall proceed to Greenville, MS to conduct permanent repairs to the satisfaction of the attending USCG marine inspector prior to the carriage of cargo.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 March 2022
Resolved 1 April 2022
Resolution: Permanent repairs made in #3P, #4P, #5P, and #6P voids to the satisfaction of CG MI.
Construction/Loadline › Hull › Bottom Plating
Issued 18 August 2014
Resolved
1) Authorized to transit to Magnolia Marine dock at Mile Marker (MM) 198 (UMR).
2) Submit repair proposal and Receive Authorization prior to leaving Magnolia Marine dock.
Condition: Damaged By Earlier Event
Due 22 August 2014
Resolved 22 August 2014
Resolution: Repair complete. Conducted air test to the satisfaction of the marine inspector. Vessel is fit for service and route indicated on its COI.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 13 September 2013
Resolved
#1 Starboard Cargo Tank Rising Stick not operating properly.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2013
Resolution: Replaced #1 Starboard Cargo Tank Rising Stick unit.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 13 September 2013
Resolved
#2 Port Cargo Tank Rising stick not operating properly. Repair/ replace to the satisfaction of the attending Coast Guard Inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2013
Resolution: Replaced #2 Port Cargo Rising Stick unit.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 7 November 2010
Resolved
MM75 was involved in a marine casualty which put severe stress on loading manifold. Product observed leaking from manifold near valve assembly on port side. Vessel piping is not to be used for cargo operations until it is tested for tightness per 46CFR35.35-70.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 November 2010
Resolution: Witnessed sat pressure test of cargo line.
Electrical › Electric Supply System (service) › Cable
Issued 29 September 2008
Resolved
Electronically controlled engine not in compliance with 46 CFR 111.105.31 (l). Vessel operator given until 18JUN10 to correct IAW D8 policy guidance 01-2008 and their approved company compliance plan. Magnolia Marine Transport compliance plan and D8 compliance plan approval letter have been scanned into vessel documents.
Action required: 705 - Other - as specified
Due 18 June 2010
Resolved 28 June 2010
Resolution: Company moved engine outside of Class 1/Div 1 areas.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 29 August 2007
Resolved
Repair main cargo suction valve reach rod and indicator.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 September 2007
Resolved 4 September 2007
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 27 June 2005
Resolved
Open gauging provided. Request amendment to 46 Subchapter "O" Cargo Authority Attachment (CAA) to reflect the open gauging installed or install closed gauging as depicted in approved drawings. Vessel is prohibited from carriage of all Subchapter "O" cargoes requiring restricted or closed gauging, until CAA amended or appropriate gauging installed to satisfaction of attending CG MI.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 8 August 2005
Resolution: CAA amended, per MSC ltr C2-0505376, dtd August 8, 2005.