Built
2015
Last inspected
11 June 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 11 June 2025
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WD13781
1278350
Flag
UNITED STATES
Maury page id
psix-1278350

Documentation record

Registered dimensions (L × B × D)106.3 ft × 31.3 ft × 12.1 ft
Registered tonnagegross 93 / net 63
ITC dimensions (L × B × D)106.3 ft × 31.3 ft × 12.1 ft
ITC tonnagegross 409 / net 154
BuilderYANK MARINE INCORPORATED · TUCKAHOE, NJ, UNITED STATES · built 2015
Hull materialAluminum
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 30 September 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it409 - Convention (Subpart B), Gross Ton
93 - Regulatory (Subpart C or D), Gross Ton
154 - Convention (Subpart B), Net Ton
63 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 20

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

FIORELLO LAGUARDIA Passenger (Inspected) · MISLE 36 · 18 November 2019 · activity 6896988YOGI BERRA Passenger (Inspected) · MISLE 38 · 18 November 2019 · activity 6896988COMMONWEALTH Passenger (Inspected) · MISLE 36922 · 18 November 2019 · activity 6896988FATHER MYCHAL JUDGE Passenger (Inspected) · MISLE 39724 · 18 November 2019 · activity 6896988PORT IMPERIAL MANHATTAN Passenger (Inspected) · MISLE 284655 · 18 November 2019 · activity 6896988GEORGE WASHINGTON Passenger (Inspected) · MISLE 330751 · 18 November 2019 · activity 6896988THOMAS JEFFERSON Passenger (Inspected) · MISLE 330756 · 18 November 2019 · activity 6896988ALEXANDER HAMILTON Passenger (Inspected) · MISLE 330758 · 18 November 2019 · activity 6896988HENRY HUDSON Passenger (Inspected) · MISLE 382715 · 18 November 2019 · activity 6896988EMPIRE STATE Passenger (Inspected) · MISLE 396679 · 18 November 2019 · activity 6896988JOHN STEVENS Passenger (Inspected) · MISLE 449770 · 18 November 2019 · activity 6896988U.S. SENATOR FRANK R LAUTENBERG Passenger (Inspected) · MISLE 561914 · 18 November 2019 · activity 6896988BROOKLYN Passenger (Inspected) · MISLE 561925 · 18 November 2019 · activity 6896988CRISPUS ATTUCKS Passenger (Inspected) · MISLE 566037 · 18 November 2019 · activity 6896988FRED V MORRONE Passenger (Inspected) · MISLE 566038 · 18 November 2019 · activity 6896988SUSAN B ANTHONY Passenger (Inspected) · MISLE 566298 · 18 November 2019 · activity 6896988CONGRESSMAN ROBERT A. ROE Passenger (Inspected) · MISLE 607128 · 18 November 2019 · activity 6896988GOVERNOR THOMAS H. KEAN Passenger (Inspected) · MISLE 608328 · 18 November 2019 · activity 6896988ADMIRAL RICHARD E BENNIS Passenger (Inspected) · MISLE 610847 · 18 November 2019 · activity 6896988YORK Passenger (Inspected) · MISLE 1081932 · 18 November 2019 · activity 6896988

Inspection history · 26

11 June 2025 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8157796
19 March 2025 COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8095809
5 February 2025 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8075021
25 May 2024 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7919280
8 August 2023 MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7763322
17 July 2023 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7767963
28 September 2022 In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7567810
10 January 2022 Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7378085
22 September 2021 Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7317781
7 April 2021 Deficiency Check · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7170703
7 April 2021 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7173571
24 February 2021 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7148075
8 October 2020 Internal Structural Exam · Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7062051
3 February 2020 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6900684
19 November 2019 In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6858600
18 November 2019 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6896988
16 October 2019 In-Service Inspection · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6835406
21 August 2019 Examination of Repairs · Internal Structural Exam · Administrative Inspection · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6787780
26 October 2018 Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6550480
10 January 2018 Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6335337
16 October 2017 Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6288240
22 August 2017 Administrative Inspection · Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6248066
21 August 2017 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6248038
27 September 2016 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6010293
6 September 2016 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5993112
22 June 2016 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5915499

Deficiency record · 31

11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 19 March 2025 No resolution recorded
Except as allowed by paragraphs (b), (c) and (d) of this section, each vessel certificated to operate on a limited coastwise route shall be provided with the survival craft required by §§ 117.204 (a) through (d) of this part, as applicable. Vsl had on board inflatable buoyant apparatus that hasn't been serviced. Vsl route restricted to within one mile from land. 46 CFR 117.205(a)
Action required: 705 - Other - as specified
Resolution: Vsl route restricted to within one mile from land.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 March 2025 Resolved
The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. 46 CFR 119.455(b)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 June 2025
Resolution: Valve closed fully.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 19 March 2025 Resolved
Exercises must be conducted at least once each calendar year, with no more than 18 months between exercises. Exercised wasn't conducted in the last 18 months. 46 CFR 104.230(c)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2025
Resolution: Vessel sent an email with evidence of the 2024 security exercise.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 5 February 2025 Resolved
"To maintain a valid Certificate of Compliance, you must complete your annual inspection within the periods specified in 176.500(b)(1) and your Certificate of Compliance must be endorsed." Vessel lapsed its Annual Inspection date. Must complete an Annual Inspection.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2025
Resolution: Vessel recieved COI inspection during activity nr 8095809
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 October 2023 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Port generator raw water exhaust cooling pipe was removed at time of inspection for repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 October 2023
Resolution: Vessel provided video of repaired raw water exhaust cooling pipe while engine was running.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 22 September 2021 Resolved
Each vessel that is 400 Gross Tons or more as measured under the convention measurement system must have a Nontank Vessel Response Plan. Vsl not in compliance.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2021
Resolved 13 December 2021
Resolution: Operator submitted plan to HQ.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 April 2021 Resolved
Provide repair plan for stbd generator waster coolant line.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 August 2021
Resolved 7 September 2021
Resolution: Received documentation attesting to rectification of wasted generator line.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 8 October 2020 Resolved
Vessel replaced structural fire protection in overhead above starboard fuel tank.
Action required: 10 - Deficiency Rectified
Due 8 October 2020
Resolved 8 October 2020
Resolution: Vessel replaced structural fire protection in overhead above starboard fuel tank.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 8 October 2020 Resolved
Vessel liferafts required annual servicing where the annual servicing of the liferafts was to be conducted on 30SEP2020. Vessel has a 406 MHz EPIRB which allows them on the vessel on its certificated route to operate without primary lifesaving until vessel is to operate in cold water. Cold water dates take effect in SECNY AOR on 01NOV2020. Vessel has until 31OCT2020 to service and install liferafts aboard vessel. Vessel operator was educated that all lifesaving installed on board the vessel shall be maintained in accordance with COI. CG-835v issued to vessel denoting that the operating time frame for the vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 October 2020
Resolved 30 October 2020
Resolution: Vessel replaced IBAs with serviced IBAs of same capacity. Provided photos and scans of servicing documentation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 October 2020 Resolved
Vessel bilge pump in no. 2 void from bow on starboard side had hairline crack at coupling between pipe flange and dischage pipe. Bilge pump originally installed however produced adequate pressure to dewater in case of emergency.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 22 October 2020
Resolution: Vessel representative sent photo evidence attesting to replacement of pump and repairs made to rectify the deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 February 2020 Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment under all practicable conditions. Bilge pumping sytem in port forepeak was inoperable.
Action required: 705 - Other - as specified
Due 6 February 2020
Resolved 6 February 2020
Resolution: CLEARED TO [name withheld].
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 19 November 2019 Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel and stowed in a position that is readily accessible to crew members for launching. Attending Maine Inspector (MI) discovered both inflatable buoyant apparatus had the hydrostatic release installed incorrectly and with mounting bars still in place despite placard on mount clearly directing removal after installation. Vessel is not operating in compliance with the COI. 46 CFR 117.130 46 CFR 115.100(b)
Action required: 30 - Ship detained
Due 19 November 2019
Resolved 20 November 2019
Resolution: SAT
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 November 2019 Resolved
This vessel is a "K-boat", therefore not required a safety management system (SMS) per regulation. Sector NY has found the following deficiencies to be objective evidence that a serious substandard condition has not been pro-actively managed by the vessel's owner/operator, leading to a lack of safety culture onboard the vessel. 46CFR115.830
Action required: 30 - Ship detained
Resolved 20 November 2019
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 19 November 2019 Resolved
The owner or managing operator shall instruct each crew member upon first being employed and prior to getting u/w for the first time on a particular vessel and at least once every 3 months as to the duties that the crew member is expected to perform in an emergency including but not limited to those listed in 46CFR122.510. Attending MI found that the owner/operator was not able to provide proof of which vessels individuals have been trained on and that the company was not conducting training every 3 months. Vessel not operating in compliance with the COI. *Submit plan by 0800 22NOV2019 on how company will guarantee only qualified individuals are sailing onboard each vessel platform while generating qual matrix* 46 CFR 122.420 46 CFR 115.100(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 November 2019
Resolution: Matrix submitted to CID satisfaction.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 16 October 2019 Resolved
46 CFR 115.802 At each initial and subsequent inspection for certification, the vessel shall be ready for inspections of the hull structure and its appurtenances, including the inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks. Observed cracked welds on tonnage bulkhead in port side lazerette.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2019
Resolved 18 October 2019
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 16 October 2019 Resolved
46 CFR 115.830(b) At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems or block emergency escapes. Excess water and oil in bilge of port side engine room must be removed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2019
Resolved 18 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 October 2019 Resolved
46 CFR 120.220 Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel underway and must be suitable for the voltage and current utilized. Multiple equipment cords are plugged into a power strip from underneath bridge navigation console and could be a fire potential.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2019
Resolved 18 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Heating
Issued 16 October 2019 Resolved
46 CFR 121.210 Cooking and heating equipment must be suitable for marine use. Each heater element of an electric space heater must be of an enclosed type. The element case or jacket must be made of a corrosion resistant material and must be provided with a thermal cutout to prevent overheating. Remove portable heaters from port and stbd lazerette when not needed.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2019
Resolved 18 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 16 October 2019 Resolved
46 CFR 115.830 (a) At each inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Must remove combustible supports and provide permanent metal supports for tubing in port and stbd lazerette.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 16 October 2019
Resolved 16 October 2019
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 October 2019 Resolved
46 CFR 118.310(e) Spanner wrenches must be provided for each fire hydrant required by this regulation. Remove all gear adrift missing spanner wrenches at fire stations 2 and 4
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 16 October 2019
Resolved 16 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 16 October 2019 Resolved
46 CFR 56.60.1 Pipe hangers must be of an acceptable metallic material in accoradance with accommodation spaces and service spaces must be of noncombustible material Insulation in port lazerette needs to be repaired.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2019
Resolved 16 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 16 October 2019 Resolved
46 CFR 115.830(b) At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, etc. Excess diesel fuel in stbd side fuel tank space must be removed.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 16 October 2019
Resolved 16 October 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 October 2019 Resolved
46 CFR 117.70(b) Each ring life buoy on a vessel must: Be approved in accordance with § 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.150. Life buoy on stern is missing retroreflective tape.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 16 October 2019
Resolved 16 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 October 2019 Resolved
46 CFR § 120.200 Electrical equipment on a vessel must be installed and mainted to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. The battery terminals in the port engine room need to be cleaned.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 16 October 2019
Resolved 16 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 October 2019 Resolved
46 CFR 120.220 Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel underway. Light switch cover in stbd lazerette is loose and needs to be tightened.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 16 October 2019
Resolved 16 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 October 2019 Resolved
46 CFR § 120.200 Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel underway. Light fixture in stbd engine room needs to be installed correctly without the support of plastic zip ties.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 16 October 2019
Resolved 16 October 2019
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 16 October 2019 Resolved
46 CFR 117.68(b) A vessel on lakes, bays and sounds or rivers route must carry three red hand flares distress signals and three hand orange smoke distress signals. All required navigational flares are expired and need to be replaced
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 16 October 2019
Resolved 16 October 2019
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 11 September 2019 Resolved
Renew structural fire protection in both engine rooms. Worklist Item will become deficiency when vessel departs drydock. Due Date: October 11, 2019
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2019
Resolved 21 October 2019
Resolution: Received notification from Sec NY that the structural fire protection in both engine rooms have been renewed satisfactorily.
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 16 October 2017 Resolved
Replace all missing structural fire protection insulation in all spaces as discussed. 46CFR116.415
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 9 January 2018
Resolution: Vessel replaced all missing SFP insulation with new in kind material.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 6 September 2017 Resolved
Replace victaulic fittings on port hull fuel fill and vents lines.
Action required: 705 - Other - as specified
Resolved 2 April 2018
Resolution: Vessel replaced all fittings with new (verified via pictures and signed statement from the port captain)
Documentation › Certificates/Documents › Certificate of Inspection
Issued 21 August 2017 Resolved
Complete satisfactory internal structural exam prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 August 2017
Resolution: Attending MI's issued credit drydock.

Casualty record · 1

7 April 2021Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 7173571