Inspection history · 22
23 April 2026
Internal Structural Exam · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8354449
22 April 2025
Plan Review (Other than "T")
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8117000
6 June 2023
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7743268
24 May 2023
Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7695400
11 May 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7685939
2 February 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7631232
8 April 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7427408
16 March 2022
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7412335
16 April 2021
Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7176299
7 July 2020
Administrative Inspection · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7000115
22 April 2020
Deficiency Check · Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6943865
8 April 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6951950
8 January 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6884854
10 December 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6871127
20 November 2019
In-Service Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6859494
18 November 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6896988
25 March 2019
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6648934
23 April 2018
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6397599
28 March 2018
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6379957
28 March 2017
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6112761
18 April 2016
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5857803
14 April 2016
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5853964
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 23 April 2026
Resolved
A fire control plan (FCP) must be posted on the vessel in a location that is accessible and visible to all pax. The plan must show escape routes, areas of refuge, embarakation stations, the location of fire protection/emergency equipment, compartment titles and hazard classification of accomodation and service spaces, and structural fire protection boundaries. MI's observed FCP incorrectly drawn.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 May 2026
Resolution: Vessel provided FCP to OCMI for signature.
04 - Emergency Systems › N/A - No Subsystem › Safe areas
Issued 23 April 2026
Resolved
At each initial & subsequent inspection for certification the owner or managing operator shall be prepared to test & make available for inspection all items in the ship's outfit, such as ground tackle, navigation lights & equipment, markings, & placards which are required to be carried by the regulations in this subchapter, as necessary to determine that they are fit for the service intended. MI's observed EM escape doos missing placards.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 May 2026
Resolution: Vessel added escape signs in required locations.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 April 2026
Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger & crew accomodation spaces locaed below the main deck. 46CFR120.420
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 May 2026
Resolution: Vessel fixed inop lighting
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 May 2023
Resolved
THE GENERAL CONSTRUCTION OF THE VESSEL MUST BE SUCH AS TO MINIMIZE FIRE HAZARDS INSOFAR AS IT IS REASONABLE AND PRACTICABLE. STBD OUTBOARD MAIN ENGINE WAS MISSING EXHAUST LAGGING NEAR CONNECTION TO MAIN ENGINE.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2023
Resolved 6 June 2023
Resolution: Lagging was add to the exhaust pipe.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 July 2020
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations.
Provide causal analysis report for loss of propulsion casualty affecting the outboard port side engine which occurred 03JUL2020. Submit repair plan for review; after repairs are completed sea trials are required to the satisfaction of attending marine inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2020
Resolution: Attending marine inspectors verified proper repair and conducted satisfactory sea trial.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 22 April 2020
Resolved
Crop/Renew port aft quarter of vessel due to significant collision and repeated wear. Plat had inch to two inch cuts into plate.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 April 2020
Resolved 30 April 2020
Resolution: Repairs sent to marine inspector providing photo evidence/repairs also witnessed by marine inspectors at facility for inspection of other vessels.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 22 April 2020
Resolved
Clad weld area between starboard rudder and strut. Corrosion found to be severe however the corrosion was not severe enough for the plate to be replaced. Along with the fact that more than 1/2 inch of material was found in the location of the corrosion.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 April 2020
Resolved 1 June 2020
Resolution: Repairs sent to marine inspector providing photo evidence/repairs also witnessed by marine inspectors at facility for inspection of other vessels.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 January 2020
Resolved
The following spaces must be equipped with a fixed gas fire extinguishing system, a space containing an oil fired boiler. The furnace space Installed Fire-boy system is showing the discharged light at the Fire-boy system display. Provide tech report showing the system is operating IAW manufacturer’s instruction.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 January 2020
Resolved 8 January 2020
Resolution: tech report provided
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 January 2020
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Placard located in the upper deck forward is broken and unreadable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 January 2020
Resolved 31 January 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 January 2020
Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Install placard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 January 2020
Resolved 31 January 2020
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 10 December 2019
Resolved
Operator reported vessel port side rub rail damage and daylight to fuel void (Fuel void port side 1st frame aft of water tight bulkhead well above water line). Vessel must make permanent repairs to hull to the satisfaction of the attending Coast Guard Marine Inspector.
46 CFR 115.804
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 December 2019
Resolved 16 December 2019
Resolution: Verified NDT with dye pen, all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 20 November 2019
Resolved
A space containing propulsion machinery is required to have fixed gas fire extinguishing system in compliance with 46CFR181.410 or other system approved by the Commandant. Attending Marine Inspector (MI) discovered the high pressure flexible hose connection coming from the CO2 bottle was not fully threaded on to the bottle (starboard engine room). Vessel is not operating in compliance with the COI.
46CFR181.400(a)(1)
46CFR176.100(b)
Action required: 30 - Ship detained
Due 20 November 2019
Resolved 25 November 2019
Resolution: Witnessed Sea Safety servicing CO2 system. Verified hose was tight.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 November 2019
Resolved
A vessel of more than 65' must have at least one fire axe in or adjacent to the operating station. Attending MI found that there was not an axe on board the vessel. Vessel not operating in compliance with the COI.
46CFR181.600
46CFR176.100(b)
Action required: 10 - Deficiency Rectified
Due 20 November 2019
Resolved 25 November 2019
Resolution: Fire ax has been replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Heating
Issued 20 November 2019
Resolved
Each electric heater must be so constructed and installed as to prevent contact with combustible materials. Attending MI found an electric heater, plugged in, laying down under the bridge console directly next to the distress signal container.
46CFR184.210
Action required: 10 - Deficiency Rectified
Due 20 November 2019
Resolved 25 November 2019
Resolution: Space heater has been removed from vessel.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 20 November 2019
Resolved
A hatch exposed to the weather must be watertight. Attending MI discovered the starboard side lazarette hatch to be seized in the open position, not allowing a watertight seal to be created.
46CFR179.360
Action required: 10 - Deficiency Rectified
Due 20 November 2019
Resolved 25 November 2019
Resolution: Scuttles were repaired and function properly.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 20 November 2019
Resolved
Rails or equivalent protection must be installed near the periphery of all decks of a vessel accessible to passengers or crew. An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard or rail. Attending MI found the railing on the port side aft deck to be cracked and the swim platform inspection covers to be missing.
46CFR177.900
46CFR177.960
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2019
Resolved 25 November 2019
Resolution: All broken handrails/cleat/platform covers were repaired.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 20 November 2019
Resolved
On a vessel of more than 65' a self priming, power driven power pump must be installed and able to produce 60psi at the pump outlet. Attending MI discovered during testing of the pump that the pump was seized and continued to trip the breaker for the motor. Vessel not operating in compliance with the COI.
46CFR181.300(a) and (b)
46CFR176.100(b)
Action required: 30 - Ship detained
Due 20 November 2019
Resolved 20 November 2019
Resolution: OPTEST of fire pump SAT.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 20 November 2019
Resolved
A vessel must carry either a first aid kit approved under 46CFR160.041 or a kit with equivalent contents and instructions. Attending MI found the kit to be missing items and have expired medications.
46 CFR 184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2019
Resolved 25 November 2019
Resolution: 1st aid kit replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 November 2019
Resolved
Each ring life buoy on a vessel must be approved in accordance with 46CFR160.050. Attending MI determined the grab lines on the starboard, aft ring life buoy to be deteriorated.
46 CFR 180.70(b)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2019
Resolved 25 November 2019
Resolution: Life ring buoy has been replaced with a new one.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 November 2019
Resolved
Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel while underway. Attending MI found the door to the breaker panel in the breaker panel room was not able to stay closed/latched.
46 CFR 183.220(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2019
Resolved 25 November 2019
Resolution: Breaker panel has been replaced and door closes properly.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 20 November 2019
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts, US Coast Pilot, Coast Guard light list, Tide tables, current tables. Attending MI found all of the charts and pubs to be out of date.
46 CFR 184.420(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2019
Resolved 25 November 2019
Resolution: All required pubs have been updated and placed onboard.
09 - Working and Living Conditions › 092 - Working Conditions › Other (mooring)
Issued 20 November 2019
Resolved
A vessel must be fitted with ground tackle and mooring lines suitable for the vessel to be safely moored or anchored. Attending MI found the starboard aft mooring cleat had been ripped halfway off the deck.
46 CFR 184.300
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2019
Resolved 25 November 2019
Resolution: Cleat has been repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 November 2019
Resolved
Submersible electric bilge pumps must be permanently mounted. Attending MI found the electric bilge pumps in all spaces not permanently mounted.
46 CFR 182.520
Action required: 30 - Ship detained
Due 4 December 2019
Resolved 16 December 2019
Resolution: verified bilge pumps mounted
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 20 November 2019
Resolved
This vessel is a "T-boat", therefore not required a safety management system (SMS) per regulation. Sector NY has found the following deficiencies to be objective evidence that a serious substandard condition has not been pro-actively managed by the vessel's owner/operator, leading to a lack of safety culture onboard the vessel.
46CFR176.830
Action required: 30 - Ship detained
Resolved 25 November 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 March 2019
Resolved
All electrical items shall be grounded. There were multiple electrical items on the bridge that were not grounded, to include one item with the ground post cut off.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 March 2019
Resolution: Ungrounded items were removed from the bridge.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 25 March 2019
Resolved
A hatch exposed to the weather shall be watertight. The gaskets for port and starboard lazarrette access hatches were deteriorated, renderring the hatch non-watertight.
Action required: 705 - Other - as specified
Resolved 25 March 2019
Resolution: The gaskets were replaced.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 March 2019
Resolved
Fire extinguishers shall be mounted in the approved bracket. The port, stern fire extinguisher was mounted in a bracket that did not properly secure the extinguisher.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2019
Resolution: Bracket and extinguisher replaced.