Records from 2005 to 2026. Most recent: inspection, 15 July 2026.
Inspection history · 26
15 July 2026
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8438565
29 April 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8123364
23 October 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8022801
5 October 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8014810
5 October 2024
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 8016275
14 February 2024
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7859304
27 November 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7829738
31 March 2023
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7660616
26 October 2022
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7571137
12 October 2022
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7571125
9 March 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7408534
22 December 2021
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7371620
2 June 2021
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7213003
29 April 2021
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7185828
13 January 2021
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7123823
16 March 2020
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6927261
10 January 2020
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6886700
23 November 2019
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6861416
18 November 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6896988
29 April 2019
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6672361
3 April 2019
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6808863
4 April 2018
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6384893
29 December 2017
Administrative Inspection · Deficiency Check
Physical examination · Navigation Center · Activity 6330265
28 April 2017
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6262536
13 April 2017
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6132245
18 April 2016
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6081083
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 30 April 2025
Resolved
Annual security exercise record not found. Complete exercise or find record prior to carrying more than 150 pax.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 30 April 2025
Resolution: Exercise records provided.
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 30 April 2025
Resolved
Oil found under transformer in ER.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2025
Resolved 28 May 2025
Resolution: Oil cleared
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 30 April 2025
Resolved
Mark emergency escape to engine room as emergency escape - keep clear.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2025
Resolved 28 May 2025
Resolution: Emergency escape marked.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 30 April 2025
Resolved
Placard on the front of the aft life jacket stowage on main deck is missing. Replace placard.
Action required: 60 - Rectify deficiencies prior to movement
Due 14 May 2025
Resolved 28 May 2025
Resolution: Placard placed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 14 February 2024
Resolved
Water heaters require protection by a pressure-
temperature relief device. Starboard engine room water
heater pressure relief device was inoperable. The operator proposed removing the hot water heater from service (lockout tag out) until a new relief valve is installed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 6 March 2024
Resolution: Item was resolved.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 14 February 2024
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Neither electric submersible bilge pump in engine room had operating lights in pilot-house.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 6 March 2024
Resolution: An operation light was installed for submersible bilge pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 February 2024
Resolved
Submersible electric bilge pumps require a positive shutoff valve to be installed at the hull penetration. Port engine room submersible electric pump did not have any valve installed in overboard discharge hose.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 6 March 2024
Resolution: Isolation valve was installed on the port shaft pump outlet.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 2 June 2021
Resolved
Vessel must meet the steering requirements of sub-chapter F.
Vessels primary hydraulic steering helm assist is inoperable. Back up and manual steering are functional. Send technician report attesting to primary steering functionality.
46CFR119.600
701c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2021
Resolution: Vessels tested steering system to satisfactory level.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 June 2021
Resolved
Each generator must have gauges to indicate lube oil pressure.
Port generator lube oil pressure reading is off the gauge scale.
46CFR119.200(a)
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 June 2021
Resolution: Witnessed satisfactory test of lube oil gauge.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 June 2021
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements.
STBD engine coolant is pooling under engine. Suspect leak on forward inboard lines. Could not detect static/dynamic leak, request lines to be cleaned and engine to be run during next inspection.
46CFR119.200(a)
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 June 2021
Resolution: Witnessed satisfactory leak check of STBD engine coolant lines.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 November 2019
Resolved
A fixed gas fire extinguishing system aboard a vessel must be approved by the Commandant. Attending Marine Inspector (MI) found the fixed fire extinguishing system was not operating properly after testing the alarms. Vessel is not operating in compliance with the COI.
46 CFR 118.410(a)
46 CFR 115.100(b)
Action required: 30 - Ship detained
Resolved 2 December 2019
Resolution: Witnessed test by Sea Safety for dampers shutdown
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 November 2019
Resolved
A pre-engineered fixed gas extinguishing system must be installed in accordance with the manufacturer's instructions. Attending MI found the generator enclosure was missing panels and would not allow for effective operation of the attached fixed system. Vessel is not operating in compliance with the COI.
46 CFR 118.420(a)(4)
46 CFR 115.100(b)
Action required: 30 - Ship detained
Resolved 2 December 2019
Resolution: Panels replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 23 November 2019
Resolved
All metallic enclosures and frames of electrical equipment must be permanently grounded to the hull on a metallic vessel. Attending MI found the ground wire off of the port steering gear was not attached.
46 CFR 120.372(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Ground wire attached
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 23 November 2019
Resolved
Remote fuel shut off valves must be marked in clearly eligible letters indicating the purpose of the valve. Attending MI found the valve was not labeled.
46 CFR 122.608
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Emer Fuel labeled
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 23 November 2019
Resolved
Portable watertight containers for distress flares shall be of bright color and clearly marked "DISTRESS FLARES". Attending MI found the distress flare container not marked.
46 CFR 122.614
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Box correctly labeled
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 November 2019
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Attending MI found dead-end wires starboard side, aft portion of vessel.
46 CFR 120.200(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Wires removed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 November 2019
Resolved
All passenger accommodations must be arranged and equipped to provide for the safety of the passengers in consideration of the route, modes of operation and speed of the vessel. Attending MI discovered a light fixture in the accommodation space missing the cover and exposing live wires in it.
46CFR116.800(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Light fixture replaced
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 November 2019
Resolved
This vessel is a "K-boat", therefore not required a safety management system (SMS) per regulation. Sector NY has found the following deficiencies to be objective evidence that a serious substandard condition has not been pro-actively managed by the vessel's owner/operator, leading to a lack of safety culture onboard the vessel.
46CFR115.830
Action required: 30 - Ship detained
Resolved 2 December 2019
Engineering › Bilge Water Management System › Strainer
Issued 4 April 2018
Resolved
A bilge suction must be fitted with a suitable strainer having an open area not less than 3x the area of the bilge pipe. Bilge suction in all spaces do not have properly sized strainers.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 August 2018
Resolved 8 August 2018
Resolution: Vessel provided evidence that the bilges were clean and new strainers were purchased and installed.
Deck/Cargo › Marine Portable Tanks › Pipe Connection
Issued 4 April 2018
Resolved
At every inspection spaces must be serviceable and in sanitary condition. Lazarette space is not sanitary due to sewage leak.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 6 April 2018
Deck/Cargo › Marine Portable Tanks › Pipe Connection
Issued 4 April 2018
Resolved
At each subsequent inspection, piping and piping systems must be ready for inspection. Flex piping on sewage tank became unattached and must be re attached and double clamped.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 6 April 2018
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 4 April 2018
Resolved
Pressure vessels must be tested and inspected IAW 46 CFR 61. Two (02) pressure vessels in e/r must be hydrostatically tested prior to 04/30/2018 to satisfy requirement.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 June 2018
Resolution: Witnessed sat hydro test to 250psi
Engineering › Steering Gear System › Hydraulic Hose
Issued 4 April 2018
Resolved
At each subsequent inspection piping and piping systems must be ready for inspection. Discovered small hydraulic leak in stbd steering gear line.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 April 2018
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 4 April 2018
Resolved
There should be no excessive accumulation of oil that might create a fire hazard. Clean the bilges of e/r and lazarette space of oil.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 August 2018
Resolution: Vessel provided evidence that the bilges were clean and new strainers were purchased and installed.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 4 April 2018
Resolved
A fire control plan must be posted in an area accessible to all passengers, and must show hazard classifications and structural fire protection boundaries.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 April 2018
Construction/Loadline › Penetrations › Pipe Flange
Issued 4 April 2018
Resolved
Penetrations in fire boundaries for electrical cables must be constructed to withstand passage of flame and smoke. Wire runs and old piping between e/r and lazarette must be properly sealed.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 April 2018
Fire Fighting › Fire Main › Pressure
Issued 13 April 2017
Resolved
Repairs are being made to fire main piping due to system leaks. Upon completion of repairs, conduct test of fire main witnessed by USCG marine inspector. 46 CFR 119.710
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 13 April 2017
Resolved
Update fire control plan to comply with 46 CFR 116.530
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Engineering › Pressure Vessel › Relief Valve
Issued 13 April 2017
Resolved
Conduct hydrostatic test on both start air receivers in presence of USCG MI. (Vessel plans to test in drydock on 28 April 2017).
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 28 April 2017
Resolution: Attened vessel, def cleared.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 13 April 2017
Resolved
Make all electrical connections in forepeak & above main deck forward sliding door to terminate in junction box/enclosure.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 13 April 2017
Resolved
Replace or repair ammeter on ground detector.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Engineering › Fuel Oil Service System › Filter
Issued 13 April 2017
Resolved
Racor filters on both engines are leaking. Repair to prevent leaking. 46 CFR 115.800.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 13 April 2017
Resolved
Remount and clean fire detectors in engine room.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.