Records from 1997 to 2026. Most recent: inspection, 15 July 2026.
Inspection history · 85
15 July 2026
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8438565
29 April 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8123364
23 October 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8022801
5 October 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8014810
5 October 2024
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 8016275
14 February 2024
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7859304
27 November 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7829738
31 March 2023
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7660616
26 October 2022
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7571137
12 October 2022
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7571125
9 March 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7408534
22 December 2021
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7371620
2 June 2021
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7213003
29 April 2021
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7185828
13 January 2021
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7123823
16 March 2020
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6927261
10 January 2020
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6886700
23 November 2019
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6861416
18 November 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6896988
29 April 2019
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6672361
3 April 2019
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6808863
4 April 2018
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6384893
29 December 2017
Administrative Inspection · Deficiency Check
Physical examination · Navigation Center · Activity 6330265
28 April 2017
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6262536
13 April 2017
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6132245
18 April 2016
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6081083
11 July 2012
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4375145
8 June 2012
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4337360
1 February 2012
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4239764
15 December 2011
Deficiency Check · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4208835
12 May 2009
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3473304
22 October 2008
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3350168
8 August 2008
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3303209
16 July 2008
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3274753
28 February 2008
Damage Survey · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3155210
5 July 2007
MARPOL Annex V Examination · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2993767
24 April 2007
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2914787
8 February 2007
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2868926
24 August 2006
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2762244
22 May 2006
MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2655562
28 September 2005
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2503438
28 September 2005
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2504560
11 August 2005
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2459146
13 May 2005
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2357206
29 March 2005
COI Inspection · Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2325911
2 September 2004
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2184710
10 August 2004
MTSA Verification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2162390
4 May 2004
Deficiency Check · MARPOL Annex V Examination · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2064508
30 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1973315
19 November 2003
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1951290
6 May 2003
Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1787817
1 April 2003
Deficiency Check · MARPOL Annex V Examination · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1766234
11 January 2003
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1731277
30 May 2002
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1623549
2 May 2002
Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1612017
21 November 2001
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1076426
2 November 2001
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1076452
10 September 2001
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1469709
8 August 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 98890
31 July 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 33016
23 July 2001
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1366490
21 July 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 185333
30 May 2001
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1362176
11 April 2001
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1060692
10 April 2001
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1060038
31 August 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 821931
6 July 2000
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1054381
12 April 2000
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1471886
9 March 2000
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1046673
22 February 2000
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 815397
18 February 2000
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1056747
2 February 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 814436
21 December 1999
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 811688
1 November 1999
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 796533
30 September 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 812894
30 September 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1351136
29 September 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1039061
9 July 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1094055
25 May 1999
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1470981
4 May 1999
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1461150
10 August 1998
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 800309
1 May 1998
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 790248
14 October 1997
Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1110425
16 April 1997
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1099201
10 April 1997
Initial Certification · Construction Oversight
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1094876
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 30 April 2025
Resolved
Annual security exercise record not found. Complete exercise or find record prior to carrying more than 150 pax.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 30 April 2025
Resolution: Exercise records provided.
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 30 April 2025
Resolved
Oil found under transformer in ER.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2025
Resolved 28 May 2025
Resolution: Oil cleared
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 30 April 2025
Resolved
Mark emergency escape to engine room as emergency escape - keep clear.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2025
Resolved 28 May 2025
Resolution: Emergency escape marked.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 30 April 2025
Resolved
Placard on the front of the aft life jacket stowage on main deck is missing. Replace placard.
Action required: 60 - Rectify deficiencies prior to movement
Due 14 May 2025
Resolved 28 May 2025
Resolution: Placard placed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 14 February 2024
Resolved
Water heaters require protection by a pressure-
temperature relief device. Starboard engine room water
heater pressure relief device was inoperable. The operator proposed removing the hot water heater from service (lockout tag out) until a new relief valve is installed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 6 March 2024
Resolution: Item was resolved.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 14 February 2024
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Neither electric submersible bilge pump in engine room had operating lights in pilot-house.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 6 March 2024
Resolution: An operation light was installed for submersible bilge pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 February 2024
Resolved
Submersible electric bilge pumps require a positive shutoff valve to be installed at the hull penetration. Port engine room submersible electric pump did not have any valve installed in overboard discharge hose.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 6 March 2024
Resolution: Isolation valve was installed on the port shaft pump outlet.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 2 June 2021
Resolved
Vessel must meet the steering requirements of sub-chapter F.
Vessels primary hydraulic steering helm assist is inoperable. Back up and manual steering are functional. Send technician report attesting to primary steering functionality.
46CFR119.600
701c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2021
Resolution: Vessels tested steering system to satisfactory level.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 June 2021
Resolved
Each generator must have gauges to indicate lube oil pressure.
Port generator lube oil pressure reading is off the gauge scale.
46CFR119.200(a)
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 June 2021
Resolution: Witnessed satisfactory test of lube oil gauge.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 June 2021
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements.
STBD engine coolant is pooling under engine. Suspect leak on forward inboard lines. Could not detect static/dynamic leak, request lines to be cleaned and engine to be run during next inspection.
46CFR119.200(a)
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 June 2021
Resolution: Witnessed satisfactory leak check of STBD engine coolant lines.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 November 2019
Resolved
A fixed gas fire extinguishing system aboard a vessel must be approved by the Commandant. Attending Marine Inspector (MI) found the fixed fire extinguishing system was not operating properly after testing the alarms. Vessel is not operating in compliance with the COI.
46 CFR 118.410(a)
46 CFR 115.100(b)
Action required: 30 - Ship detained
Resolved 2 December 2019
Resolution: Witnessed test by Sea Safety for dampers shutdown
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 November 2019
Resolved
A pre-engineered fixed gas extinguishing system must be installed in accordance with the manufacturer's instructions. Attending MI found the generator enclosure was missing panels and would not allow for effective operation of the attached fixed system. Vessel is not operating in compliance with the COI.
46 CFR 118.420(a)(4)
46 CFR 115.100(b)
Action required: 30 - Ship detained
Resolved 2 December 2019
Resolution: Panels replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 23 November 2019
Resolved
All metallic enclosures and frames of electrical equipment must be permanently grounded to the hull on a metallic vessel. Attending MI found the ground wire off of the port steering gear was not attached.
46 CFR 120.372(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Ground wire attached
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 23 November 2019
Resolved
Remote fuel shut off valves must be marked in clearly eligible letters indicating the purpose of the valve. Attending MI found the valve was not labeled.
46 CFR 122.608
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Emer Fuel labeled
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 23 November 2019
Resolved
Portable watertight containers for distress flares shall be of bright color and clearly marked "DISTRESS FLARES". Attending MI found the distress flare container not marked.
46 CFR 122.614
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Box correctly labeled
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 November 2019
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Attending MI found dead-end wires starboard side, aft portion of vessel.
46 CFR 120.200(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Wires removed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 November 2019
Resolved
All passenger accommodations must be arranged and equipped to provide for the safety of the passengers in consideration of the route, modes of operation and speed of the vessel. Attending MI discovered a light fixture in the accommodation space missing the cover and exposing live wires in it.
46CFR116.800(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 December 2019
Resolution: Light fixture replaced
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 November 2019
Resolved
This vessel is a "K-boat", therefore not required a safety management system (SMS) per regulation. Sector NY has found the following deficiencies to be objective evidence that a serious substandard condition has not been pro-actively managed by the vessel's owner/operator, leading to a lack of safety culture onboard the vessel.
46CFR115.830
Action required: 30 - Ship detained
Resolved 2 December 2019
Engineering › Bilge Water Management System › Strainer
Issued 4 April 2018
Resolved
A bilge suction must be fitted with a suitable strainer having an open area not less than 3x the area of the bilge pipe. Bilge suction in all spaces do not have properly sized strainers.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 August 2018
Resolved 8 August 2018
Resolution: Vessel provided evidence that the bilges were clean and new strainers were purchased and installed.
Deck/Cargo › Marine Portable Tanks › Pipe Connection
Issued 4 April 2018
Resolved
At every inspection spaces must be serviceable and in sanitary condition. Lazarette space is not sanitary due to sewage leak.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 6 April 2018
Deck/Cargo › Marine Portable Tanks › Pipe Connection
Issued 4 April 2018
Resolved
At each subsequent inspection, piping and piping systems must be ready for inspection. Flex piping on sewage tank became unattached and must be re attached and double clamped.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 6 April 2018
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 4 April 2018
Resolved
Pressure vessels must be tested and inspected IAW 46 CFR 61. Two (02) pressure vessels in e/r must be hydrostatically tested prior to 04/30/2018 to satisfy requirement.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 June 2018
Resolution: Witnessed sat hydro test to 250psi
Engineering › Steering Gear System › Hydraulic Hose
Issued 4 April 2018
Resolved
At each subsequent inspection piping and piping systems must be ready for inspection. Discovered small hydraulic leak in stbd steering gear line.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 April 2018
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 4 April 2018
Resolved
There should be no excessive accumulation of oil that might create a fire hazard. Clean the bilges of e/r and lazarette space of oil.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 August 2018
Resolution: Vessel provided evidence that the bilges were clean and new strainers were purchased and installed.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 4 April 2018
Resolved
A fire control plan must be posted in an area accessible to all passengers, and must show hazard classifications and structural fire protection boundaries.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 April 2018
Construction/Loadline › Penetrations › Pipe Flange
Issued 4 April 2018
Resolved
Penetrations in fire boundaries for electrical cables must be constructed to withstand passage of flame and smoke. Wire runs and old piping between e/r and lazarette must be properly sealed.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 April 2018
Fire Fighting › Fire Main › Pressure
Issued 13 April 2017
Resolved
Repairs are being made to fire main piping due to system leaks. Upon completion of repairs, conduct test of fire main witnessed by USCG marine inspector. 46 CFR 119.710
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 13 April 2017
Resolved
Update fire control plan to comply with 46 CFR 116.530
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Engineering › Pressure Vessel › Relief Valve
Issued 13 April 2017
Resolved
Conduct hydrostatic test on both start air receivers in presence of USCG MI. (Vessel plans to test in drydock on 28 April 2017).
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 28 April 2017
Resolution: Attened vessel, def cleared.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 13 April 2017
Resolved
Make all electrical connections in forepeak & above main deck forward sliding door to terminate in junction box/enclosure.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 13 April 2017
Resolved
Replace or repair ammeter on ground detector.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Engineering › Fuel Oil Service System › Filter
Issued 13 April 2017
Resolved
Racor filters on both engines are leaking. Repair to prevent leaking. 46 CFR 115.800.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 13 April 2017
Resolved
Remount and clean fire detectors in engine room.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 20 April 2017
Resolution: Attened vessel, def cleared.
Electrical › Electric Generation Source (service) › Panelboard
Issued 11 July 2012
Resolved
PF01 - Prove proper operation of voltmeter and ammeter for generator #2.
Due 17 July 2012
Resolved 31 July 2012
Resolution: Vessel proved proper operation of voltmeter and ammeter.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 11 July 2012
Resolved
PF06 - Replace junction box cover in way of port compressor, clean electrical connections.
Due 17 July 2012
Resolved 31 July 2012
Resolution: Vessel replaced junction box cover and cleaned electrical connections.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 11 July 2012
Resolved
PF05 - Repair stbd fuel fill piping to original.
Due 17 July 2012
Resolved 31 July 2012
Resolution: Vessel repaired fuel fill piping.
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 11 July 2012
Resolved
PF07 - Properly affix oil filter gauge housing and gauge to prevent wear by excessive vibration in MDE #2.
Due 17 July 2012
Resolved 31 July 2012
Resolution: Vessel affixed oil filter gauge satisfactory.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 11 July 2012
Resolved
PF04 - Remove fuel residue on piping and bilges of fuel tank space.
Due 17 July 2012
Resolved 31 July 2012
Resolution: Vessel removed fuel residue on piping and bilges of fuel tank space.
Engineering › Fuel Oil Service System › Settler Tank
Issued 11 July 2012
Resolved
PF03 - Address and repair oil leak in way of oil sump in generator #1.
Due 17 July 2012
Resolved 31 July 2012
Resolution: Vessel repaired oil leak.
Documentation › Certificates/Documents › Stability Letter
Issued 8 June 2012
Resolved
Owner/Operator failed to submit stability certification compliance. Issued CG-835 requesting compliance with assumed average weight per person of 185 pounds and in accordance with 46 CFR 178.320 amended by FR vol. 75, No. 239, USCG-2007-0030. The vessel is restricted to carry a maximum of 300 passenger until stability certification compliance is received.
Action required: 705 - Other - as specified
Resolved 31 July 2012
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 15 December 2011
Resolved
While transiting to NY Waterways facility in Weehawken NJ, Vessel suffered a causality to its Port Main Engine. Vessel is restricted from carrying passengers until repairs are made to the satisfaction of attending CG Marine Inspector.
Action required: 705 - Other - as specified
Resolved 20 December 2011
Resolution: Engine replaced in kind. Inspected installation and conducted sea trials, all sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 16 July 2008
Resolved
Provide operating instructions for CO2 discharge in lazzarette/steering gear area (local station).
Action required: 705 - Other - as specified
Due 16 August 2008
Resolved 8 August 2008
Resolution: Proper instructions were provided.
Engineering › Bilge Water Management System › Interface Detector
Issued 16 July 2008
Resolved
Fix high level alarm indicating light for forepeak in operating station (light stays on and audible alarm works as well).
Action required: 705 - Other - as specified
Due 8 September 2008
Resolved 22 October 2008
Engineering › Bilge Water Management System › Piping
Issued 16 July 2008
Resolved
Repair/replace stbd-side bilge pump hose iwo pump.
Action required: 705 - Other - as specified
Due 16 August 2008
Resolved 15 August 2008
Resolution: stbd-side bilge pump was repaired.
Engineering › Steering Gear System › Ram
Issued 16 July 2008
Resolved
Ascertain reasoning why line is attached to both rams of steering gear assemblies. If necessary, provide plans to USCG for approval.
Action required: 705 - Other - as specified
Due 16 August 2008
Resolved 8 August 2008
Deck/Cargo › Mooring/Anchoring › Winch
Issued 16 July 2008
Resolved
Submit plans to USCG for removal of anchor winch.
Action required: 705 - Other - as specified
Due 16 August 2008
Resolved 8 August 2008
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Block
Issued 28 February 2008
Resolved
Provide report from qualified engine technician IRT loss of propulsion (if necessary) prior to carrying passengers for hire.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 4 March 2008
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Block
Issued 28 February 2008
Resolved
Conduct Sea trials in presence of Marine Inspector prior to carrying passengers for hire.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 4 March 2008
Documentation › Certificates/Documents › FCC SSL
Issued 5 July 2007
Resolved
Provide current FCC Safety Radio Certificate. Vessel operation restricted to not more than 1000 feet from shore until this requirement is met.
Action required: 705 - Other - as specified
Due 5 August 2007
Resolved 4 March 2008
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 5 July 2007
Resolved
Provide proper bracket for portable fire extinguisher on bridge.
Action required: 705 - Other - as specified
Due 5 August 2007
Resolved 4 March 2008
Fire Fighting › Fire Hydrants › Location/Position
Issued 5 July 2007
Resolved
Mark fire hose station on upper deck.
Action required: 705 - Other - as specified
Due 5 August 2007
Resolved 4 March 2008
Construction/Loadline › Hull › Transverse Frame
Issued 24 April 2007
Resolved
Make proper repairs to cracked weld in forepeak, starboard side, IWO 1st deck frame as marked.
Action required: 705 - Other - as specified
Resolved 9 May 2007
Construction/Loadline › Hull › Longitudinal Frame
Issued 24 April 2007
Resolved
Make proper repairs to cracked welds in lazarette, port and starboard, IWO 2nd, 3rd, and 4th transverse deck frames along 1st deck long as marked.
Action required: 705 - Other - as specified
Resolved 9 May 2007
Construction/Loadline › Hull › Transverse Frame
Issued 24 April 2007
Resolved
Make proper repairs to cracked weld in laz, stbd side, IWO 3rd transverse deck frame at 2nd deck longitudinal as marked.
Action required: 705 - Other - as specified
Resolved 9 May 2007
Construction/Loadline › Hull › Transverse Frame
Issued 24 April 2007
Resolved
Make proper repairs to cracked weld in laz stbd side, IWO 1st main deck long at 3rd transverse deck frame as marked.
Action required: 705 - Other - as specified
Resolved 9 May 2007
Engineering › Bilge Water Management System › Pump
Issued 22 May 2006
Resolved
Prove proper operation of electric bilge pump.
Due 7 June 2006
Resolved 24 August 2006
Electrical › Electrical Distribution System (service) › Junction Box
Issued 22 May 2006
Resolved
Provide cover for junction box on port side MDE.
Due 7 June 2006
Resolved 24 August 2006
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 22 May 2006
Resolved
Clean bilges in lazarette.
Due 7 June 2006
Resolved 24 August 2006
Construction/Loadline › Hull › Weld
Issued 22 May 2006
Resolved
V/W cracked welds in laz (stbd side aft) as marked.
Due 7 June 2006
Resolved 22 May 2006
Documentation › Safety Management System › Master's Authority/Responsibility Documentation
Issued 28 September 2005
Resolved
Provide CG-2692 within 5 days of 28Sep05.
Due 3 October 2005
Resolved 29 September 2005
Resolution: CG-2692 faxed and fwd to IO Shop.
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (air motor)
Issued 28 September 2005
Resolved
Provide tech report to determine underlying cause and repair of inop port MDE. Report must be to CG satisfaction and prior to carrying pax.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2005
Resolved 22 May 2006
Engineering › Diesel Engine (propulsion-direct drive) › Air-flex Clutch
Issued 28 September 2005
Resolved
Conduct sea trial with CG MI, prior to carrying pax.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2005
Resolved 22 May 2006
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 29 March 2005
Resolved
The wiring in the forepeak's bilge float box must be enclosed.
Due 11 April 2005
Resolved 14 April 2005
Resolution: Bilge float box repaired.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 29 March 2005
Resolved
Oil must be removed from the deck plates in the lazarette and engine room.
Due 11 April 2005
Resolved 14 April 2005
Resolution: All oil removed from the lazarette and engine room bilges.
Engineering › Steering Gear System › Hydraulic Hose
Issued 29 March 2005
Resolved
Replace hydraulic hoses for steering system for steering cylinders.
Condition: Improper/Lack of Maintenance
Due 21 April 2005
Resolved 12 May 2005
Resolution: Vessel representative replaced worn hydraulic hoses with new hoses.
Construction/Loadline › Hull › Stiffener
Issued 4 May 2004
Resolved
V/W stbd most outboard bow vertical stiffener (comp #1).
Due 18 May 2004
Resolved 8 June 2004
Resolution: Stiffner vee and welded properly.
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 May 2004
Resolved
C/R #3 & #5 transverse deck beam fm SS inboard to between #7 & #8 longitudinal deck beams (port, comp #2).
Due 18 May 2004
Resolved 8 June 2004
Resolution: Transverse deck beams 3 and 5 cropped and renewed.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 4 May 2004
Resolved
V/W top rail IWO #2 port stanchion (main deck @ bow).
Due 18 May 2004
Resolved 8 June 2004
Resolution: Broken rail vee and welded properly.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 1 April 2003
Resolved
Provide fixed fire fighting servicing certificates at next marine inspector attendance (09APR03).
Due 9 April 2003
Resolved 9 April 2003
Resolution: Witnessed Sea Safety complete satisfactory test of fixed ff system including time delay & automatic vent shutdowns. Servicing certificates were provided on 09APR03.
Lifesaving › Lifebuoys › Stowage
Issued 1 April 2003
Resolved
Replace starboard life buoy bracket on main deck.
Due 9 April 2003
Resolved 1 April 2003
Resolution: Lifering Buoy bracket repaired during annual exam on 01APR03.
Documentation › Manifests/Lists
Issued 1 April 2003
Resolved
Provide and post a list of all qualified senior deckhands in wheelhouse.
Due 9 April 2003
Resolved 9 April 2003
Resolution: Witnessed posted list of qualified senior deckhands in wheelhouse of M/V [name withheld] on 09APR03.
Engineering › Compressed Air System (start air)
Issued 1 April 2003
Resolved
Hydrostatic test pressure vessels at next marine inspector attendance (09APR03).
Due 9 April 2003
Resolved 9 April 2003
Resolution: Both air receivers were satisfactorily hydro tested in presence of CG MI at 250 psi.
Fire Fighting › Structural - A Class Divisions
Issued 1 April 2003
Resolved
Plug weld holes in fire door access to the engine room so as to maintain fire door integrity. LEGACY COMPONENT DESC: Openings - Fire Doors
Due 9 April 2003
Resolved 9 April 2003
Resolution: Holes in engine room fire door plug welded, sat.
Electrical › Electrical Distribution System (service)
Issued 2 May 2002
Resolved
Repair distribution panel door latch in galley. LEGACY COMPONENT DESC: Panelboard
Condition: Unknown
Due 2 June 2002
Resolved 30 May 2002
Resolution: Door latch repaired.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 2 May 2002
Resolved
Post operating instructions at FFE pull station.
Condition: Unknown
Due 2 June 2002
Resolved 2 May 2002
Pollution Prevention/Response › Prevention Equipment
Issued 2 May 2002
Resolved
Post MARPOL V garbage placard in galley area.
Condition: Unknown
Due 2 June 2002
Resolved 2 May 2002
Resolution: Placard posted.
Accommodation/Occupational Safety › Ventilation
Issued 2 May 2002
Resolved
Prove proper operation of engine room forward blower.
Condition: Unknown
Due 2 June 2002
Resolved 30 May 2002
Resolution: Operational test satisfactory.
Documentation › Certificates/Documents
Issued 2 May 2002
Resolved
Provide current FCC radio safety certificate. LEGACY COMPONENT DESC: Ship Safety Radio Certificate
Condition: Unknown
Due 2 June 2002
Resolved 30 May 2002
Resolution: Reviewed License for call sign WCX3346, issued 18May02 and expires 18May07.
Construction/Loadline
Issued 23 July 2001
Resolved
Make permanent repairs (C/R) to crack in lazaret, stbd side of transom as marked. Temp repairs have been made.
Condition: Unknown
Due 23 July 2001
Resolved 23 July 2001
Fire Fighting
Issued 30 May 2001
Resolved
Provide the manufacturer's instruction manual for maintenance and testing of the fire detection system.
Condition: Unknown
Due 30 May 2001
Resolved 30 May 2001
Construction/Loadline
Issued 30 May 2001
Resolved
Crop and renew the upper stbd corner of the transom.
Condition: Unknown
Due 30 May 2001
Resolved 30 May 2001
Fire Fighting
Issued 30 May 2001
Resolved
Provide a pressure relief valve for the fixed CO2 System.
Condition: Unknown
Due 30 May 2001
Resolved 30 May 2001
Engineering
Issued 30 May 2001
Resolved
Make repairs to the fuel fill line to secure the leaks at pressure fittings
Condition: Unknown
Due 30 May 2001
Resolved 30 May 2001
Fire Fighting
Issued 30 May 2001
Resolved
Make repairs to the fire detection system; renew the batteries & #4 sensor,repair the aft main deck alarm.
Condition: Unknown
Due 30 May 2001
Resolved 30 May 2001
Construction/Loadline
Issued 11 April 2001
Resolved
Port strut cracked at base of mounting. Skeg broken off. Repair as original.
Condition: Unknown
Due 21 April 2001
Resolved 12 April 2001
Construction/Loadline
Issued 11 April 2001
Resolved
Void #1: #1 and #2 Transverse deep web frame requires scupper/weep holes.
Condition: Unknown
Due 21 April 2001
Resolved 12 April 2001
Unknown
Issued 11 April 2001
Resolved
Complete Maintenance worklist items recorded prior to CG inspection.
Condition: Unknown
Due 21 April 2001
Resolved 12 April 2001
Construction/Loadline
Issued 10 April 2001
Resolved
COMPLETE AS BUILT VERIFICATION OF STRUT MODIFICATION IAW NYCMI EXAMINED PLANS, AND NYCMI LETTER PR-010039 DATED 11APR01.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Construction/Loadline
Issued 30 September 1999
Resolved
PROVIDE BILGE HIGH LEVEL ALARM AS PER APPROVED PLAN AND IAW WITH 46CFR530.
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Documentation
Issued 25 May 1999
Resolved
LOG MONTHLY DRILLS INTO SHIPS LOG AND PROVIDE COPIES TO [name withheld].
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Documentation
Issued 25 May 1999
Resolved
PROVIDE PROOF THAT FIRE ALARM SYSTEM IS Y2K COMPLIANT. PROVE PROPER OPERATION OF THE SYSTEM TROUBLE ALARM, TROUBLE LIGHT FOR BATTERIES WAS ON DURING THIS INSPECTION.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Electrical
Issued 25 May 1999
Resolved
INSTALL ELECTRICAL MATTING IN ENGINE ROOM IWO POWER PANEL
Condition: Unknown
Due 3 June 1999
Resolved 3 June 1999
Electrical
Issued 25 May 1999
Resolved
INSTALL A NEW COVER ON JUNCTION BOX LOCATED ON AFT CORNER OF BRIDGE IWO LIFE RING.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Lifesaving
Issued 25 May 1999
Resolved
PROPERLY LABLE LIFE JACKETS STOWAGE UNDER THE SEATS ON UPPER DECK, WITH TYPE, AND NUMBER.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Accommodation/Occupational Safety
Issued 25 May 1999
Resolved
SECURE CO2 BOTTLES FOR SODA MACHINE IN GALLEY. BOTTLES ARE FREE STANDING AT THIS TIME
Condition: Unknown
Due 3 June 1999
Resolved 3 June 1999
Documentation
Issued 25 May 1999
Resolved
PROVIDE PROOF TO USCG MARINE INSPECTIOR BY FAX, A COMPLETED DAPI CHECK OFF SHEET VIA FAX TO SHOW ENROLLMENT IN A PROGRAM, AND POST 800 NUMBER ON VSL.
Condition: Unknown
Due 3 June 1999
Resolved 3 June 1999
Fire Fighting
Issued 25 May 1999
Resolved
REPLACE ALL FIX FIRE EXTINGUISHING PIPING CURRENTLY INSTALLED ON VSL WHICH IS ASTM A53F WITH PROPER PIPING IAW MANUFACTURES MANUAL AND _x001C_ NFPA 12-10 (1-9.1)
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Construction/Loadline
Issued 4 May 1999
Resolved
LAZ: STBD SIDE; #3 TDWF V/W #1 DECK LONG FWD SIDE IWO TDWF
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Construction/Loadline
Issued 4 May 1999
Resolved
LAZ: PORT SIDE; BAY 3, V/W #1 DECK LONG BOTH SIDES OF # 2 & 3 TDWF
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Construction/Loadline
Issued 4 May 1999
Resolved
LAZ: PORT SIDE; BAY 2, V/W #1 DECK LONG BOTH SIDES OF #1 & 2 TDWF
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Construction/Loadline
Issued 4 May 1999
Resolved
LAZ: (STBD SIDE); #1 TDWF (FROM STERN) V/W #1,2,3 DECK LONGS BOTH SIDES IWOTDWF
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Construction/Loadline
Issued 4 May 1999
Resolved
LAZ: OVERHEAD; V/W #2 DECK LONG FROM CENTERLINE (PORT SIDE) IWO #2 TDWF
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Construction/Loadline
Issued 4 May 1999
Resolved
VOID #2: INSTALL A REACH ROD FOR BALL VALVE LOCATED ON COLLISION BULKHEAD OR CABLE TO OPERATE OUTSIDE OF VOID. VALVE LOCATED AT FWD END OF VOID, PERSONNEL WOULD HAVE TO CLIMB OVER 3-3' HIGH TDWF TO THE VALVE TO OPERATE CLOSING/OPENING
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Construction/Loadline
Issued 4 May 1999
Resolved
LAZ: STBD SIDE; #2 TDWF V/W #1 DECK LONG BOTH SIDES IWO TDWF
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Unknown
Issued 1 May 1998
Resolved
Provide Coast Pilot and Rules of the Road publications.
Condition: Unknown
Due 1 May 1998
Resolved 1 May 1998
Navigation
Issued 10 April 1997
Resolved
Provide charts and pubs of the operating area to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 10 April 1997
Resolved 10 April 1997
Lifesaving
Issued 10 April 1997
Resolved
Conduct man overboard and fire drills to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 10 April 1997
Resolved 10 April 1997