Records from 2001 to 2025. Most recent: inspection, 16 December 2025.
Inspection history · 39
16 December 2025
Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8273399
15 October 2025
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8240605
12 June 2024
Internal Structural Exam · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7898163
27 February 2024
Administrative Inspection · In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7861520
16 August 2023
Drydock Exam · Examination of Repairs · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7765889
8 June 2023
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7706664
17 May 2023
Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7689774
18 July 2022
COI Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7509789
14 May 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7196800
2 April 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6946050
17 January 2020
Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6891345
6 December 2019
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6879138
6 December 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6889250
21 November 2019
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6860921
18 November 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6896988
18 March 2019
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6643051
11 March 2019
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6639905
15 March 2018
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6371821
30 October 2017
Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6297602
17 March 2017
Annual Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6105460
15 February 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6088695
15 March 2016
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5833368
10 March 2014
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4813016
12 February 2010
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3679086
30 October 2008
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3354934
29 May 2008
Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3222045
27 December 2007
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3122113
20 November 2007
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3102348
2 May 2006
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2678305
12 October 2004
MARPOL Annex V Examination · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2218737
6 November 2003
MARPOL Annex V Examination · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1942658
8 October 2003
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1923653
10 October 2002
Annual Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1687775
24 July 2002
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1651506
24 July 2002
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1714608
2 July 2002
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1639877
26 November 2001
Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1401599
16 November 2001
Type not recorded
No type recorded · Station Fort Pierce · USCG Southeast District (CGD-SE) · Activity 1520765
9 October 2001
MARPOL Annex V Examination · Hull Examination · Inclining Experiment · Initial Construction-Excluding Oversight · Initial Certification · Plan Review "T" Boat
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1074135
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 July 2022
Resolved
Deck rails must be designed and constructed to withstand a point load of 200 puds applied at any point in any direction.
Identified failed welds connecting back railing to deck.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2022
Resolved 27 July 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 July 2022
Resolved
All cable and wire must be installed with metal supports spaced not more than 24 inches apart, and in such a manner as to avoid chafing and other damage.
Cable runs throughout vessel need metal supports.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2022
Resolved 27 July 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 July 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire.
Cable penetrations need fire putty throughout vessel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2022
Resolved 27 July 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 July 2022
Resolved
The design of all exhaust systems must ensure minimum risk of injury to personnel.
Generator exhaust hose is damaged.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2022
Resolved 27 July 2022
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 May 2021
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 July 2022
Resolution: Vessel issued COI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 January 2020
Resolved
All crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Man overboard recovery apparatus was improperly rigged and unable to be deployed, crew was unable to recover man overboard marker.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 January 2020
Resolution: Conducted drills with crew; body was recovered effectively and safely, crew knowledge of emergency procedures was well demonstrated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 November 2019
Resolved
Owner/operator shall notify OCMI in advance of conducting hull repairs. Attending Marine Inspectors discovered a hole had been patched/repaired on the center jet drive tube without informing the the OCMI.
46 CFR 176.655
Action required: 30 - Ship detained
Resolved 17 January 2020
Resolution: Rectified to the satisfaction of the Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 November 2019
Resolved
A pre-engineered fixed gas fire extinguishing system must be installed in accordance with the manufacturers instructions. Attending Marine Inspectors identified a missing panel on the case enclosing the generator, which made the fixed system ineffective for the intended closed generator space.
46 CFR 181.420(a)(4)
46 CFR 176.100(b)
Action required: 30 - Ship detained
Resolved 17 January 2020
Resolution: Rectified to the satisfaction of the Marine Inspector.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2019
Resolved
This vessel is a "T-boat", therefore not required a safety management system (SMS) per regulation. Sector NY has found the following deficiencies to be objective evidence that a serious substandard condition has not been pro-actively managed by the vessel's owner/operator, leading to a lack of safety culture onboard the vessel.
46CFR176.25-50
Action required: 30 - Ship detained
Resolved 17 January 2020
Resolution: Rectified to the satisfaction of the Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 18 March 2019
Resolved
Tubular gauge glasses, if fitted to a diesel tank must be of heat resistant material. Vessel diesel fuel tank has plastic tubular gauge glass.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 March 2019
Resolved 13 December 2019
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 15 March 2018
Resolved
Prove man overboard recovery with additional deckhand or through alternate proposed method.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 March 2018
Resolved 30 March 2018
Resolution: Attested new assembly for man overboard recovery operations.
Engineering › Bilge Water Management System › Interface Detector
Issued 15 March 2018
Resolved
Correct high water alarms to sound audible alarm.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 March 2018
Resolved 22 March 2018
Resolution: Attested to audible alarm for high water level alarms.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 15 March 2018
Resolved
Prove fire extinguisher's servicing report for portable and fixed fire extinguishing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 22 March 2018
Resolution: Examined satisfactory fire extinguishing servicing report for all portable and fixed extinguishing systems aboard the vessel.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 15 March 2018
Resolved
Prove operation of ground detection equipment.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 March 2018
Resolved 16 March 2018
Resolution: Provided report of ground detection.
Construction/Loadline › Hull › Hull Plating
Issued 12 February 2010
Resolved
Vessel must evaluate damage to the transom & restore to satisfactory condition prior to carrying passengers
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 March 2011
Resolution: Cleared during COI inspection on March 14, 2011.
Construction/Loadline › Hull › Hull Plating
Issued 12 February 2010
Resolved
Vee and Weld all welds cracked due to transom damage. Welds have been called out by CG Inspectors.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 March 2011
Resolution: Cleared during COI inspection on March 14, 2011.
Engineering › Bilge Water Management System › Not Operational
Issued 12 February 2010
Resolved
Make repairs to bilge line and test bilge system to the satifaction of the attending CG Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 March 2011
Resolution: Cleared during COI inspection on March 14, 2011.
Engineering › Sea-water System (primary cooling) › Pump
Issued 12 February 2010
Resolved
Secure engine cooling hose so that it seats properly in the cradle.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 March 2011
Resolution: Cleared during COI inspection on March 14, 2011.
Construction/Loadline › Hull › Longitudinal Frame
Issued 20 November 2007
Resolved
V/W sideshell long #1 from top, bay 1, starboard lazarette as discussed.
Action required: 705 - Other - as specified
Due 31 December 2007
Resolved 27 December 2007
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 20 November 2007
Resolved
Provide proof of proper servicing of fixed fire extinguishing system in way of generator.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 November 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 6 November 2003
Resolved
Provide valid certificate for fixed fire system. (Must be cleared by attending USCG Marine Inspector prior to carring passengers).
Due 6 November 2003
Resolved 6 November 2003
Resolution: Witnessed Sea Safety International service system. Recieved copy of Sea Safety International''''s receipt.
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 6 November 2003
Resolved
Provide proof of servicing for all portible fire extinguishers. (Must be cleared by attending USCG Marine Inspector prior to carring passengers). LEGACY COMPONENT DESC: Service
Due 6 November 2003
Resolved 6 November 2003
Resolution: Recieved reciept from Sea Safety International.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 6 November 2003
Resolved
Provide updated Coast Guard Light List.
Due 13 November 2003
Resolved 6 November 2003
Resolution: New Light List was provided.
Engineering › Diesel Engine (propulsion-direct drive)
Issued 6 November 2003
Resolved
v/w crack in middle engine exhaust system mount.
Due 6 November 2003
Resolved 6 November 2003
Resolution: Welded while USCG personnel was on scene. Welder did not see the extent of the crack, as a result the welder made five passes to correct the crack.
Construction/Loadline › Hull
Issued 10 October 2003
Resolved
V/W FR #2 IWO SSL# 1 & 2 in void # 1
Due 15 October 2003
Resolved 20 October 2003
Construction/Loadline › Hull
Issued 10 October 2003
Resolved
V/W FR # 3 IWO SSL # 3 in void # 1
Due 15 October 2003
Resolved 20 October 2003
Construction/Loadline › Hull
Issued 10 October 2003
Resolved
V/W Transverse deck frame # 3 A/M in Forpeak.
Due 15 October 2003
Resolved 20 October 2003
Construction/Loadline › Hull
Issued 10 October 2003
Resolved
V/W FR#1 port side IWO SSL # 2 in Forpeak
Due 15 October 2003
Resolved 20 October 2003
Construction/Loadline › Hull
Issued 10 October 2003
Resolved
V/W FR # 3 underside IWO Broken welds in Void # 2 as needed on stbd side.
Due 15 October 2003
Resolved 20 October 2003
Construction/Loadline › Hull
Issued 10 October 2003
Resolved
V/W FR # 1 underside as need on Stbd side.
Due 15 October 2003
Resolved 20 October 2003
Construction/Loadline › Hull
Issued 10 October 2003
Resolved
Submit photo's to CG of all Modifications and repairs prior to carry passengers.
Due 15 October 2003
Resolved 15 October 2003
Construction/Loadline › Hull
Issued 8 October 2003
Resolved
Identify all leaks in void #1 and make proper repairs to the satisfaction of attending CG marine inspector. Vsl is prohibited from carrying passengers until this requirement is met. LEGACY COMPONENT DESC: Bottom Plating
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 October 2003
Resolved 20 October 2003
Construction/Loadline › Hull
Issued 8 October 2003
Resolved
V/W port quarter Jet guard
Due 10 October 2003
Resolved 10 October 2003
Construction/Loadline › Hull
Issued 8 October 2003
Resolved
V/W cracks in port/stbd bow supports
Due 20 October 2003
Resolved 20 October 2003
Construction/Loadline › Hull
Issued 8 October 2003
Resolved
Remove "curl" in bow stem
Due 10 October 2003
Resolved 10 October 2003
Construction/Loadline › Hull
Issued 8 October 2003
Resolved
V/W jet intakes on port/stbd side as needed.
Due 10 October 2003
Resolved 10 October 2003
Stability › Watertight Integrity
Issued 8 October 2003
Resolved
Install new gasket on engine room hatch.
Due 20 October 2003
Resolved 20 October 2003
Engineering › Electric Generation Source (service)
Issued 8 October 2003
Resolved
Properly repair fuel leak in generator.
Due 20 October 2003
Resolved 20 October 2003
Engineering › Fuel Oil Service System
Issued 8 October 2003
Resolved
Properly repair fuel leaks in fuel fill system piping.
Due 10 October 2003
Resolved 10 October 2003
Construction/Loadline › Hull
Issued 8 October 2003
Resolved
V/W transvers frame # 1 IWO bottom long #1 on Stbd side.
Due 15 October 2003
Resolved 20 October 2003
Construction/Loadline › Hull
Issued 8 October 2003
Resolved
V/W overhead deck long on Port side #'s 2, 3, & 4.
Due 20 October 2003
Resolved 20 October 2003
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 10 October 2002
Resolved
Prove proper operation of ventilation shutdown for fixed fire extinguishing system.
Condition: Improper/Lack of Maintenance
Due 17 November 2002
Resolved 22 November 2002
Resolution: Fire damper to engine room was greased and now working properly.
Electrical › Electric Generation Source (emergency)
Issued 24 July 2002
Resolved
Make permanent repairs to alternator to starboard main engine.
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 July 2002
Resolved 24 July 2002
Resolution: Administratively cleared via fax from Director of Maintenance (Andy Kenopensky) certifying that new alternator belt installed, adjusted, electrical systems checked and sea trials conducted.
Operations/Management › Drills/Instruction
Issued 9 October 2001
Resolved
Vessel shall not be placed into passenger carrying service until Fire, Person Overboard, and Abandon Ship drills are conducted.
Condition: Unknown
Due 30 November 2001
Resolved 26 November 2001
Stability
Issued 9 October 2001
Resolved
Vessel shall not be placed into passenger carrying service until an approved Stability Letter is issued by the U.S. Coast Guard Marine Safety Center and posted on board the vessel. LEGACY COMPONENT DESC: Stability Letter
Condition: Unknown
Due 30 November 2001
Resolved 26 November 2001
Operations/Management › Passenger Operations
Issued 9 October 2001
Resolved
Vessel shall not be placed into passenger carrying service until a new to zone inspection is completed by a U.S. Coast Guard Activities New York Marine Inspector.
Condition: Unknown
Due 30 November 2001
Resolved 26 November 2001
Resolution: Ref Activities New York Activity #1401599