Inspection history · 19
30 April 2026
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8358815
2 October 2025
Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8245289
23 January 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8068785
16 October 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8019615
2 October 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8013485
14 February 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7865758
10 July 2023
Plan Review (Other than "T") · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7718651
17 November 2022
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7596107
3 October 2022
Deadweight Survey · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7570322
30 January 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6898950
21 November 2019
Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6860916
18 November 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6896988
25 February 2019
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6631911
11 February 2019
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6617492
5 February 2018
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6348650
16 November 2017
Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6308104
27 February 2017
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6095271
8 February 2017
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6084494
1 February 2016
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5807058
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 2 October 2025
Resolved
Each electric component or it's enclosure must meet type 4 or 4X or NEMA 250 or IP 56 of IEC. During the evaluation of the steering gear, the rudder angle indicator housing was showing signs of wear and failure. Repair to original standard.46 CFR 113.40-10(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 November 2025
Resolved 13 November 2025
Resolution: Repairs made to rudder indicator made to the attending Marine Inspector.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 2 October 2025
Resolved
The EPIRB's battery is replaced after it is used or the date before the date required by FCC regulations in 47 CFR Part 80. During the deck walk, it was discovered that the EPRIB Battery was expired. Renew prior to operations beyond 3NM from shore.
Action required: 705 - Other - as specified
Resolved 22 October 2025
Resolution: EPIRB Battery replaced. and verified EPIRB registration.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 10 July 2023
Resolved
When, in accordance with § 170.120 in subchapter S of this chapter, a vessel must be provided with a stability letter.
Vessel does not have an updated stability letter. 46 CFR 115.306
Action required: 705 - Other - as specified
Due 1 September 2023
Resolved 3 August 2023
Resolution: Vessel provided stability letter.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 10 July 2023
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent.
Port and Starboard Engine Room ventilation dampeners failed to close upon activation or the pre-engineered fire extinguishing system. 46 CFR 119.465
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2023
Resolution: Vessel provided photographic evidence of fire dampner activation.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 10 July 2023
Resolved
A fire control plan must be posted on the vessel in a location that is accessible and visible to all passengers. The plan must show escape routes, areas of refuge, embarkation stations, the location of fire protection/emergency equipment, compartment titles and hazard classification of accommodation and service spaces, and structural fire protection boundaries.
Vessels fire control plan needs to be updated to reflect extinguisher locations. 46 CFR 116.530
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2023
Resolved 3 August 2023
Resolution: Vessel provided updated fire control plan.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 21 November 2019
Resolved
Owner/operator shall notify OCMI in advance of conducting hull repairs. Attending Marine Inspectors discovered a hole with a doubler plate in the engine room, starboard side, forward of the MDE near the vent.
46 CFR 176.665
Action required: 30 - Ship detained
Due 21 November 2019
Resolved 25 November 2019
Resolution: Cleared by CWO's Bafia and Moser.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 21 November 2019
Resolved
Each survival craft must be stowed so that when the vessel sinks the survival craft will float free. Attending Marine Inspector discovered that the hydrostatic release mechanism attaching the inflatable buoyant apparatus (IBA) to the vessel was installed incorrectly, which would inhibit the IBA to float free if the vessel sank.
46CFR180.130(a)(2)
Action required: 30 - Ship detained
Due 21 November 2019
Resolved 26 November 2019
Resolution: IBA's removed from vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 21 November 2019
Resolved
The owner or managing operator shall make sure that maintenance for survival craft is carried out in accordance with the manufacturers instructions. Attending Marine Inspectors discovered the IBA was 8 months past it's required servicing date.
46CFR185.702(a) and (b)
Action required: 30 - Ship detained
Due 21 November 2019
Resolved 26 November 2019
Resolution: IBA's removed from vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 21 November 2019
Resolved
Each survival craft must be stowed so that when the vessel sinks the survival craft floats free and inflates automatically. Attending Marine Inspector found that the "servicing posts" were still installed on the cradle and were explicitly required to be removed after servicing was complete to allow for proper release of the IBA.
46CFR180.130(a)(2)
Action required: 30 - Ship detained
Due 21 November 2019
Resolved 26 November 2019
Resolution: IBA's removed from vessel.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 21 November 2019
Resolved
A vessel must comply with the applicable requirements for any radio and EPIRB installations as required by the Federal Communications Commission. Attending Marine Inspectors discovered the EPIRB's hydrostatic release expiration was not marked. Not in compliance with COI.
46CFR184.502
705C (7 Days)
46 CFR 176.100(b)
Action required: 705 - Other - as specified
Due 28 November 2019
Resolved 26 November 2019
Resolution: New hydrostatic release was installed in the presence of the attending CG MI.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 21 November 2019
Resolved
A crew work space must be of sufficient size, suitable construction and with suitable equipment to provide for the safe operation of the vessel and protection of the crew. Attending Marine Inspectors found two Carbon Monoxide detectors in the jet room to be zip-tied and taped together.
46CFR177.700(a)
Action required: 30 - Ship detained
Due 21 November 2019
Resolved 26 November 2019
Resolution: New CO Detectors installed in jet room spaces.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 21 November 2019
Resolved
A crew work space must be of sufficient size, suitable construction and with suitable equipment to provide for the safe operation of the vessel and protection of the crew. The swim platform/jet inspection deck was missing the protective covers over the jet drive buckets.
46CFR177.700(a)
Action required: 30 - Ship detained
Due 21 November 2019
Resolved 26 November 2019
Resolution: New deck plating was installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 21 November 2019
Resolved
A hatch exposed to the weather must be watertight. Both aft deck scuttles into the jet rooms were either seized open or broken completely.
46CFR179.360(a)
Action required: 30 - Ship detained
Due 21 November 2019
Resolved 26 November 2019
Resolution: Scuttles repaired and operational.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 21 November 2019
Resolved
Attachment plugs for portable lamps, tools and similar apparatus operating at 100 volts or must have a grounding conductor in the portable plug. Attending Marine Inspectors discovered that a portable heater had the grounding pole broken off of the plug.
46CFR183.370(b)
Action required: 10 - Deficiency Rectified
Resolved 21 November 2019
Resolution: Crew removed the space heater from the vesssel.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 21 November 2019
Resolved
A vessel must comply with the applicable requirements for any radio installations as required by the Federal Communications Commission. The DSC radio did not have the vessel's MMSI
46CFR184.502
Action required: 10 - Deficiency Rectified
Resolved 21 November 2019
Resolution: Vessel captain programmed the VHF/DSC VHF radio with the vessels MMSI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2019
Resolved
This vessel is a "T-boat", therefore not required a safety management system (SMS) per regulation. Sector NY has found the following deficiencies to be objective evidence that a serious substandard condition has not been pro-actively managed by the vessel's owner/operator, leading to a lack of safety culture onboard the vessel.
46CFR176.25-50
Action required: 30 - Ship detained
Resolved 26 November 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 February 2019
Resolved
A vessel of at least 26ft in length must be provided with individual bilge lines and bilge suctions for each watertight compartment. Bilge piping in Stardboard side lazerette was disconnected from strainer.
46CFR182.510(a)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 11 February 2019
Resolved 11 February 2019
Resolution: Repaired pipe on site
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 February 2019
Resolved
A bilge suction must fitted with a suitable strainer having an open area not less than three times the area of the pipe. STBD lazerette and STBD fuel tank rooms bilge pumps were disconnected from strainers.
46CFR182.510(b)
Action required: 705 - Other - as specified
Due 18 February 2019
Resolved 1 March 2019
Resolution: Strainers were put on all bilge pumps.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 February 2019
Resolved
A vessel must carry one floating waterlight, unless it is limited to day time operations. Vessel's water light was inoperable.
46CFR180.70(d)
Action required: 705 - Other - as specified
Due 18 February 2019
Resolved 25 February 2019
Resolution: verified operable water light.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 11 February 2019
Resolved
Each EPIRB, other than a EPIRB in an inflation liferaft, must be tested monthly. Provide proof monthly test of vessels EPIRB.
46CFR185.728(a)
Action required: 705 - Other - as specified
Due 18 February 2019
Resolved 25 February 2019
Resolution: verified logbook entry for montly testing.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 February 2019
Resolved
Portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10. STBD E/R portable extinguisher was needs to be re-charged or replaced.
46CFR176.810(b)(1)
Action required: 705 - Other - as specified
Due 18 February 2019
Resolved 28 February 2019
Resolution: Replaced extinguisher
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 February 2019
Resolved
Each life jacket, immersion suit, and ring buoy must be marked in clearly legible black letters with vessel name. STBD stern Life Ring needs to be re-labeled.
46CFR185.604(b)
Action required: 705 - Other - as specified
Due 18 February 2019
Resolved 25 February 2019
Resolution: 24 inch lifering was replaced and has proper markings
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 11 February 2019
Resolved
A penetration in a watertight bulkhead must be as high and far inboard in the bulkhead as practicable, and made watertight. Through hole fitting running from stbd side #2 forward void to #1 forward void was not watertight.
46CFR179.330(c)
Action required: 705 - Other - as specified
Due 18 February 2019
Resolved 28 February 2019
Resolution: Through hole fitting was filled
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 February 2019
Resolved
lectrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards. Dead end wires in STBD engine room and in lazerette need to be removed or capped off.
46CFR183.200(b)
Action required: 705 - Other - as specified
Due 18 February 2019
Resolved 1 March 2019
Resolution: All wire was removed
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 5 February 2018
Resolved
Fire Boy in generator space starboard side needs servicing. Extra portable extinguisher to be placed near entrance to space until servicing.
Action required: 705 - Other - as specified
Due 12 February 2018
Resolved 12 February 2018
Resolution: Received tech report on 8FEB18 and attended vessel on 12FEB18.
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 8 February 2017
Resolved
IBA servicing was overdue
Action required: 705 - Other - as specified
Due 28 February 2017
Resolved 4 April 2017
Resolution: Received photo documentation from o/op clearing def.
Lifesaving › Embarkation Appliances/Stations › Side Ropes
Issued 8 February 2017
Resolved
Jacobs Cradle improperly installed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 February 2017
Resolved 4 April 2017
Resolution: Received photo documentation from o/op clearing def.
Communications › Radio Communications › EPIRB
Issued 8 February 2017
Resolved
Epirb NOAA registration expired and Hydro release expires this month.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 February 2017
Resolved 4 April 2017
Resolution: Received photo documentation from o/op clearing def.
Lifesaving › Inflatable Buoyant Apparatus › Float Free
Issued 8 February 2017
Resolved
IBA's were not equipped w/ hydrostatic release.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 April 2017
Resolved 4 April 2017
Resolution: IBA was installed properly by operator.
Navigation › Piloting/Steering › Notices to Navigation
Issued 8 February 2017
Resolved
update light list
Condition: Invalid
Action required: 705 - Other - as specified
Due 8 March 2017
Resolved 4 April 2017
Resolution: Operator showed updated navigation manuals.