Inspection history · 45
6 May 2026
Drydock Exam · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8341462
10 July 2025
Annual Inspection · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8172135
12 June 2024
Annual Inspection · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7898148
29 May 2024
Administrative Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7923321
26 March 2024
Administrative Inspection · Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7862927
16 May 2023
Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7672854
11 April 2022
COI Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7428672
15 March 2022
Hull Examination · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7408614
15 October 2020
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7076153
11 May 2020
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6948426
21 January 2020
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6893313
21 November 2019
Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6860912
18 November 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6896988
3 May 2019
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6676035
14 May 2018
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6413792
4 May 2018
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6405465
2 November 2017
Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6299652
3 May 2017
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6138284
19 July 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5973116
16 May 2016
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5878343
9 May 2016
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5872238
20 May 2014
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4863033
8 May 2014
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4853156
4 May 2012
Deficiency Check · Hull Examination · COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4301821
19 August 2011
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4124797
3 September 2008
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3316621
24 June 2008
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3246155
10 April 2008
Deficiency Check · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3181247
10 April 2008
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3181820
7 June 2007
COI Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2991408
13 June 2006
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2696354
16 May 2006
Annual Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2654477
15 March 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2603296
24 February 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2591630
7 December 2005
Type not recorded
No type recorded · Maritime Safety & Security Team New York (91106) · Activity 2547885
22 June 2005
MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2399205
21 April 2005
Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2340077
1 April 2005
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2324488
16 June 2004
MARPOL Annex V Examination · Deficiency Check · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2100082
3 June 2004
Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2087131
17 May 2004
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2071286
10 June 2003
Annual Inspection · Deficiency Check · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1813335
25 February 2003
Deficiency Check · Administrative Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1749909
25 February 2003
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1753461
1 April 2002
Construction Oversight · Initial Certification
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1632321
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 22 May 2024
Resolved
When the Marine Safety Center (MSC) determines that a vessel must have stability details and/or calculations indicated on it Certificate of Inspection, the owner or operator must submit such information to the Commanding Officer, MSC for approval. Vessel's previous stability letter was held in abeyance pending submittal of structural calculations due to aft deck extension and modifications. Obtain stability letter based on recent weight change and structural calculations prior to carrying passengers.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 June 2024
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 May 2023
Resolved
A hatch exposed to the weather must be watertight. The watertight hatches to leading to the tank void and engine room are missing several dogs.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2023
Resolved 19 May 2023
Resolution: Repaired in kind.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 April 2022
Resolved
Shut off valves must be installed at the engine end of the fuel line. The vessel's fuel shutoff valve does not fully close. Make the valve fully functional at closing the fuel delivery.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2022
Resolved 22 April 2022
Resolution: Fuel shut-off valve is fully operational as per the regulation.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 August 2020
Resolved
Fixed fire extinguishing system pressure switches were relocated outside the E/R. Prove proper operation of pressure swiches for ventiliation and engine shutdowns prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2020
Resolved 15 October 2020
Resolution: Tested during COI inspection.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 11 May 2020
Resolved
Port side #2 transverse frame from aft at the bilge knuckle was cracked in the generator/fuel tank space. Gouge and reweld crack.
Action required: 705 - Other - as specified
Due 11 May 2020
Resolved 16 June 2020
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 21 January 2020
Resolved
Vessel found with hull penetration in tank space between aft bulkhead and frame on starboard side. Light visibly seen within penetration.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2020
Resolved 28 April 2020
Resolution: Observed as satisfactory by attending MIs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 January 2020
Resolved
Vessel lifejacket stowage not marked as well as stowage of vessels was found to require significant dexterity which prevented the rapid removal of lifejacket from stowage location.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2020
Resolved 28 April 2020
Resolution: Observed as satisfactory by attending MIs.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 21 November 2019
Resolved
Fire hazards are to be minimized as it is reasonable and practicable. Attending Marine Inspector (MI) noted oil-soaked rags along with approximately 1.5" of diesel/oil/water mixture accumulated in the engine room bilge. Vessel is not operating in compliance with the COI.
46 CFR 177.405(a)
46 CFR 176.100(b)
Action required: 30 - Ship detained
Resolved 25 November 2019
Resolution: Engine room has been properly cleaned.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 November 2019
Resolved
On a vessel of at least 26', a visual and audible alarm must be provided at the operating station to indicate high water level in normally unmanned spaces. Attending MI discovered the engine room bilge alarm float switches were not properly installed and would not be capable of alarming at the operating station. Vessel is not operating in compliance with the COI.
46 CFR 182.530(a)(2)
46 CFR 176.100(b)
Action required: 30 - Ship detained
Resolved 25 November 2019
Resolution: Bilge float switches are properly installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 November 2019
Resolved
A pre-engineered fixed gas extinguishing system must be installed in accordance with the manufacturer's instructions. Attending MI found the generator enclosure was missing panels and would not allow for effective operation of the attached fixed system. Vessel is not operating in compliance with the COI.
46 CFR 181.420(a)(4)
46 CFR 176.100(b)
Action required: 30 - Ship detained
Resolved 25 November 2019
Resolution: Panels were replaced on the generator box.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 21 November 2019
Resolved
A hatch exposed to the weather must be watertight. Attending MI discovered that the bow forward and breaker room hatches were inoperable and could not be closed.
46 CFR 179.360(a)
Action required: 30 - Ship detained
Resolved 25 November 2019
Resolution: Scuttles have been repaired and function properly.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 21 November 2019
Resolved
A crew work space must be of sufficient size, adequate construction and with suitable equipment to provide for the safe operation of the vessel and the protection of personnel. Attending MI discovered the jet drive bucket inspection platform deck plates were missing.
46CFR177.700(a)
Action required: 30 - Ship detained
Resolved 25 November 2019
Resolution: Deck plates have been replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 November 2019
Resolved
A vessel must have a ring life buoy that is approved in accordance with 46CFR160.050. Attending MI determined the grab line of the ring life buoy was deteriorated and coming apart.
46CFR180.70
Action required: 30 - Ship detained
Resolved 25 November 2019
Resolution: Life ring has been replaced with new one.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2019
Resolved
All passenger accommodations must be arranged and equipped to provide for the safety of passengers. Attending MI discovered the metal exhaust fan in the main passenger are was missing the cover/guard.
46CFR177.800(a)
Action required: 30 - Ship detained
Resolved 25 November 2019
Resolution: Guards replaced on ventilation fan.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 November 2019
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at a constant marine load. Attending MI found the air intake for the main diesel engine was attached with a polypropylene line.
46 CFR 182.200(a)
Action required: 30 - Ship detained
Resolved 25 November 2019
Resolution: Air intake properly mounted.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 November 2019
Resolved
A vessel of more than 65' must have at least one fire axe located in the operating station. Attending MI noted the fire axe was loosely stored in the pilot house, not in it's bracket.
*7 days to rectify*
46CFR181.600
Action required: 705 - Other - as specified
Due 28 November 2019
Resolved 25 November 2019
Resolution: Fire ax has been replaced.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 21 November 2019
Resolved
A vessel must comply with the applicable requirements for any radio installations as required by the Federal Communications Commission. Attending MI determined the VHF/DSC radio did not have the MMSI programmed in.
46CFR184.502
Action required: 30 - Ship detained
Resolved 25 November 2019
Resolution: MMSI has been programmed in to VHF/DSC radio.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 21 November 2019
Resolved
Rails or equivalents must be installed near the periphery of all decks of a vessel accessible to passengers or crew. Attending MI found several broken hand rails throughout the vessel.
*7 days to rectify*
46CFR177.900(a)
Action required: 705 - Other - as specified
Due 28 November 2019
Resolved 25 November 2019
Resolution: All broken handrails have been repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 November 2019
Resolved
The design and installation of exhaust systems must minimize risk or injury to personnel. Attending MI found lagging missing from exhaust piping.
46CFR182.430(a)
Action required: 30 - Ship detained
Due 25 November 2019
Resolved 26 November 2019
Resolution: Exhaust had new insulation wrapping it.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 November 2019
Resolved
Front seal on port MDE leaking lube oil.
Action required: 30 - Ship detained
Due 25 November 2019
Resolved 26 November 2019
Resolution: Timing gear cover seal was replaced. Main seal was not leaking.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2019
Resolved
This vessel is a "T-boat", therefore not required a safety management system (SMS) per regulation. Sector NY has found the following deficiencies to be objective evidence that a serious substandard condition has not been pro-actively managed by the vessel's owner/operator, leading to a lack of safety culture onboard the vessel.
46CFR176.25-50
Action required: 30 - Ship detained
Resolved 26 November 2019
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 May 2019
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Due 10 May 2019
Resolved 10 May 2019
Resolution: verified shutdown and override.
Fire Fighting › Fire Pumps › Pressure
Issued 4 May 2018
Resolved
Fire pump gauge was fluctuating between 20psi and 50psi.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2018
Resolution: Vessel properly demonstrated proper operation of fire pump and fire pump guage.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 4 May 2018
Resolved
Engine room and generator space bilges have excessive oil creating an unsafe condition.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2018
Resolution: Vessel removed and cleaned bilge in both the engine room and generator space.
Fire Fighting › Combustible Materials › Insulation
Issued 4 May 2018
Resolved
Insulation was loose and removed in forepeak space and engine room. Vessel must replace insulation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2018
Resolved 14 May 2018
Resolution: vessel replaced and repaired insulation throughout engine room and forepeak space.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 3 May 2017
Resolved
Provide new FCC Radiotelephony certificate (Vsl restricted to <1000ft offshore)
Action required: 705 - Other - as specified
Resolved 5 May 2017
Resolution: Cleared deficiency.
Construction/Loadline › Hull › Hull Plating
Issued 3 May 2017
Resolved
Repair crack in plate on port side of forepeak; drill stop, weld, and prove NDT. Repair cracked welds in same space.
Action required: 705 - Other - as specified
Due 5 May 2017
Resolved 5 May 2017
Resolution: Viewed proper welds.
Engineering › Fuel Oil Service System › Filter
Issued 3 May 2017
Resolved
Replace shatterproof bowl on stbd engine foreward fuel filter.
Action required: 705 - Other - as specified
Due 5 May 2017
Resolved 5 May 2017
Resolution: Cleared deficiency.
Electrical › Electric Generation Source (emergency) › Ground Detection
Issued 3 May 2017
Resolved
Properly install required ground detection for dual-voltage generator.
Due 31 May 2018
Resolved 11 June 2018
Resolution: Verified required ground detection was installed properly.
Navigation › Piloting/Steering › Marine Charts
Issued 3 May 2017
Resolved
Provide corrected chart
Due 31 May 2017
Resolved 5 May 2017
Resolution: Cleared deficiency.
Construction/Loadline › Penetrations › Weld
Issued 20 May 2014
Resolved
CW: Drill stop both ends on crack on upper port lazarette space & V/W. Conduct NDT in presence of Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 May 2014
Resolution: Received email and pictures of weld repair & NDT from vessel Rep. [name withheld].
Construction/Loadline › Hull › Weld
Issued 8 May 2014
Resolved
V/W two locations in STBD AFT jet room as marked.
Due 15 May 2014
Resolved 15 May 2014
Resolution: Inspected two welds, all sat.
Engineering › Bilge Water Management System › Pump
Issued 4 May 2012
Resolved
Prove proper operation of bilge pump (i.e. 30GPM) by demonstrating satisfactory dewatering of space.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 May 2012
Resolution: Proper operation of bilge pump was demonstrated by dewatering of stbd fwd bilge.
Personnel › Training › Fire Fighting Basic
Issued 4 May 2012
Resolved
Deckhand [name withheld] must demonstrate satisfactory man overboard drill in the presence of a CGMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 May 2012
Resolution: The above named deckhand demonsrated a man overboard drill
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 4 May 2012
Resolved
Remove oil/slip hazrards from fuel tank void.
Action required: 705 - Other - as specified
Due 11 May 2012
Resolved 7 May 2012
Resolution: All hazards removed from fuel tank void
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 May 2012
Resolved
Wrap electrical wire harness outboard portside engine.
Action required: 705 - Other - as specified
Due 11 May 2012
Resolved 7 May 2012
Resolution: Wire harness properly insulated
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 4 May 2012
Resolved
Replace dry rotted fuel line outboard port engine.
Action required: 705 - Other - as specified
Due 11 May 2012
Resolved 7 May 2012
Resolution: Fuel line replaced
Documentation › Certificates/Documents › Stability Letter
Issued 4 May 2012
Resolved
Post new stability letter in passenger accomodation area.
Action required: 705 - Other - as specified
Due 11 May 2012
Resolved 7 May 2012
Resolution: Stability letter posted
Construction/Loadline › Structures › Rake
Issued 4 May 2012
Resolved
Final inspection of bow re-weld at approval of CGMI.
Action required: 705 - Other - as specified
Due 11 May 2012
Resolved 7 May 2012
Resolution: Bow insert passed inspection
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 May 2012
Resolved
V and weld areas as marked: 2 port stanchions fwd (on deck), 1 starboard stanchion fwd (on deck), void #1 (as marked) and void #2 (as marked).
Action required: 705 - Other - as specified
Due 11 May 2012
Resolved 9 May 2012
Resolution: Inspected all welds on stanchions. All sat.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 4 May 2012
Resolved
Repair upper and lower rub rail starboard quarter.
Action required: 705 - Other - as specified
Due 11 May 2012
Resolved 7 May 2012
Resolution: Proper repairs to rub rail made
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 4 May 2012
Resolved
Replace crack inside starboard quarter bulkhead as marked.
Action required: 705 - Other - as specified
Due 11 May 2012
Resolved 7 May 2012
Resolution: Cracked rewelded
Construction/Loadline › Hull › Hull Plating
Issued 4 May 2012
Resolved
Found a 2 in. by 8 in. breach in the starboard hull in the forward void. Vessel shall crop and renew aprox. 18 x 18 insets along the weld of the previous insert.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 May 2012
Resolved 15 May 2012
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 3 September 2008
Resolved
Prove proper servicing of pre-engineered fixed fire extinguishing system in way of vessel's generator.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 September 2008
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 3 September 2008
Resolved
Provide lifeline in way of vessel's ring life buoy.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 September 2008
Construction/Loadline › Structures › Superstructure
Issued 10 April 2008
Resolved
Make repairs to railing in way of starboard bow.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2008
Construction/Loadline › Structures › Superstructure
Issued 10 April 2008
Resolved
Make repairs to starboard gunnel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2008
Deck/Cargo › Mooring/Anchoring › Mooring Line/Hawser
Issued 10 April 2008
Resolved
Replace cleat, starboard, bow.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 May 2008
Documentation › Certificates/Documents › FCC SSL
Issued 7 June 2007
Resolved
Provide FCC Safety Radio Certificate onboard vessel.
Action required: 705 - Other - as specified
Due 7 July 2007
Resolved 12 July 2007
Documentation › Certificates/Documents › Certificate of Inspection
Issued 7 June 2007
Resolved
Provide CG-858 Amendment indicating completion of credit drydock onboard vessel.
Action required: 705 - Other - as specified
Due 7 July 2007
Resolved 12 July 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 7 June 2007
Resolved
Provide guards over fixed lighting in engine compartment.
Action required: 705 - Other - as specified
Due 7 July 2007
Resolved 12 July 2007
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 7 June 2007
Resolved
Determine cause and secure oil leak from front end of starboard main diesel engine.
Action required: 705 - Other - as specified
Due 7 July 2007
Resolved 12 July 2007
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 7 June 2007
Resolved
Re-weld cracked base of stanchion, starboard bow.
Action required: 705 - Other - as specified
Due 7 July 2007
Resolved 12 July 2007
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 16 May 2006
Resolved
Make proper repairs to stbd railing just aft the stbd embarkation station.
Due 16 June 2006
Resolved 13 June 2006
Resolution: Railing repaired.
Construction/Loadline › Structures › Deck Plating
Issued 16 May 2006
Resolved
Make repairs to port bow radius.
Due 16 June 2006
Resolved 13 June 2006
Resolution: Area repaired.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 16 May 2006
Resolved
Remove metal shavings from void #02.
Due 23 May 2006
Resolved 13 June 2006
Resolution: Shavings removed.
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 16 May 2006
Resolved
Install proper vent on generator door. Deficiency is written because the generator is enclosed protected by a fixed extinguishing system. The missing vent on the generator door would allow extinguishing agent to escape and may cause the fixed system to be ineffective against a fire.
Due 23 May 2006
Resolved 13 June 2006
Resolution: Vent installed.
Engineering › Fuel Oil Service System › Piping
Issued 16 May 2006
Resolved
Make repairs to fuel vent and fill piping port side of fuel tank IWO the threaded area of piping going into the fuel tank.
Due 23 May 2006
Resolved 13 June 2006
Resolution: Area repaired.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 16 May 2006
Resolved
Repair cracked base on ladder in generator space.
Due 16 June 2006
Resolved 13 June 2006
Resolution: Ladder repaired.
Construction/Loadline › Hull › Hull Plating
Issued 16 May 2006
Resolved
C/R damaged area in Laz stbd side aft IWO side shell and transom.
Due 16 June 2006
Resolved 13 June 2006
Resolution: Transferred to worklist item to be cleared at DD.
Lifesaving › Hand Flares › Expired
Issued 16 May 2006
Resolved
Provide 02 red hand flares to replace expired flares.
Due 23 May 2006
Resolved 13 June 2006
Resolution: Flares replaced.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 22 June 2005
Resolved
CG Light List Invalid.
Condition: Unknown
Due 1 July 2005
Resolved 22 June 2005
Resolution: Validated all Nav. Pubs.
Construction/Loadline › Hull › Hull Plating
Issued 16 June 2004
Resolved
Void #1, fwd of swash bulkhead - port side: C/R hole A/M
Due 16 June 2004
Resolved 18 June 2004
Resolution: CLEARED
Construction/Loadline › Hull › Weld
Issued 16 June 2004
Resolved
Void #1 TDWF #1-3 IWO chine - V/W A/M.
Due 16 July 2004
Resolved 18 June 2004
Resolution: CLEARED
Construction/Loadline › Hull › Longitudinal Frame
Issued 16 June 2004
Resolved
Void #4 Bay #3 SSL #6 - C/R A/M.
Due 16 July 2004
Resolved 18 June 2004
Resolution: CLEARED
Documentation › Certificates/Documents
Issued 10 June 2003
Resolved
Provide copy of valid/current Certificate of Documentation. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2003
Resolved 10 June 2003
Resolution: O/O made a phone call to NVDC and consquently had a copy of new document faxed to their location. Original to be placed O/B.
Documentation › Certificates/Documents
Issued 10 June 2003
Resolved
Provide copy of current FCC Marine Radio Operator Permit or employ a Master on vessel with a valid permit. Vessel restricted to operating within 1000 feet from shore until new permit or new operator is placed on board. LEGACY COMPONENT DESC: FCC Marine Radio Operator Permit
Condition: Unknown
Action required: 705 - Other - as specified
Due 17 June 2003
Resolved 13 June 2003
Resolution: Master has been removed from service until he has obtained a valid FCC Marine Radio Operator''s Permit.
Navigation › Piloting/Steering
Issued 10 June 2003
Resolved
Provide currently corrected navigation charts of appropriate scale for area of operation. Compliance date extended from 6/17 to 6/24. LEGACY COMPONENT DESC: Marine Charts
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 24 June 2003
Resolved 24 June 2003
Construction/Loadline › Hull
Issued 10 June 2003
Resolved
Make permanent repairs to bow docking bumpers. LEGACY COMPONENT DESC: Bow docking bumper
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 10 July 2003
Resolved 24 June 2003
Resolution: Received photos of completed repairs.
Engineering › Bilge Water Management System
Issued 10 June 2003
Resolved
Prove proper operation of "audible" high level bilge alram for E/R. LEGACY COMPONENT DESC: High level alarm
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2003
Resolved 13 June 2003
Resolution: Audible alarm working to the satisfaction of attending MI.
Engineering › Diesel Engine (propulsion-direct drive)
Issued 10 June 2003
Resolved
Prove proper operation of P/C/S main diesel engines. LEGACY COMPONENT DESC: General operation
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 June 2003
Resolved 10 June 2003
Resolution: 1500: Received an e-mail statement from [name withheld] indicating that the pressure switch for the CO2 system was wired incorrectly causing the engines not to be started. All MDE''s and associated shut dhowns are now operating as designed.
Engineering › Bilge Water Management System
Issued 10 June 2003
Resolved
Prove proper operation of bilge pump system. Maintain a close observation of spaces until system is operating normally. LEGACY COMPONENT DESC: Fixed bilge system
Action required: 705 - Other - as specified
Due 13 June 2003
Resolved 10 June 2003
Resolution: Generator raw water strainer clogged casuing the generator to overheat and trip off line. Strainer was cleaned and generator placed back on line enabling the electric pump for the fixed bilge system to be tested. MI witnessed test of system all sat.
Engineering
Issued 25 February 2003
Resolved
Make permanent & proper repairs to or replace port MDE jet shaft.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 March 2003
Resolution: [name withheld] witnessed sea trials and found all sat on date above.
Engineering
Issued 25 February 2003
Resolved
Make vessel available for sea trials following repair to port MDE jet shaft.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 March 2003
Resolution: [name withheld] witnessed sea trials and found all sat on above date.
Operations/Management › Equipment Service/Testing
Issued 1 April 2002
Resolved
Make the vessel available for a new-to zone inspection and underway equipment tests and drills to the satisfaction of the attending NYCMI Marine Inspector. LEGACY COMPONENT DESC: New-to-zone inspection
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2002
Resolved 23 July 2002
Resolution: [name withheld] attended vessel at NYWW to conduct NTZ inspection. All sat.
Accommodation/Occupational Safety
Issued 1 April 2002
Resolved
Prove proper installation of the passenger seating and placards to the satisfaction of the attending NYCMI Marine Inspector. LEGACY COMPONENT DESC: Seating
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2002
Resolved 10 June 2003
Resolution: Seating properly secured.
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 1 April 2002
Resolved
The fixed fire extinguishing system installed on the generator enclosures was installed without approved plans. Submit changes to Fixed Gas Fire Extinguishing Plans and DC Electrical Plans for this installation in "as-built" drawings for approval to MSC. LEGACY COMPONENT DESC: Plans & Drawings
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2003
Resolved 18 June 2003
Resolution: Based on the requirements of 46 CFR 181.400(a)(2), this system is not required. This system will be considered additional protection for the space.
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 1 April 2002
Resolved
Provide manual pulls for the generator enclosure fixed fire extinguishing systems or receive CG approval for use as installed. SEAFIRE Halocarbon extinguishers with the approval number 162/029/237/0 are approved for use on inspected vessels only if the manual pulls are installed. LEGACY COMPONENT DESC: Operating Controls
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2002
Resolved 10 June 2003
Resolution: Manual pulls installed as required.
Electrical › Electrical Distribution System (emergency)
Issued 1 April 2002
Resolved
Provide changes to AC Electrical System Details and One-Line Diagram to show the Load Shedding Contactor in "as built" drawings to MSC for approval. LEGACY COMPONENT DESC: Switch
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2002
Resolved 10 June 2003
Resolution: MI obtained copy of "One-Line" diagram and approval letter dtd 10/09/2002 from MSC indicating that the electrical system details are approved.
Fire Fighting › Fire Pumps
Issued 1 April 2002
Resolved
The fire pump is not installed in accordance with approved plans. Submit changes to the Fire Main System and AC Electrical plans in "as-built" drawings for approval to MSC. LEGACY COMPONENT DESC: Arrangement
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2002
Resolved 10 June 2003
Resolution: MSC approval obtained as noted on letter #16710/P008634/rrb dtd 10/09/2002. Project file P008634.